Creation of an educational and practical center at the Kropyvnytskyi Construction Vocational College "Center for Modern Construction Technologies and Innovations" at the Kropyvnytskyi Construction Vocational College


Sector
Education and science
Stream
Modernization of the infrastructure of vocational and specialized pre-higher education institutions
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
State level of SP
Implementation
Completion

General information

Description of the project

The project is aimed at modernizing the workshops and laboratories of the  institution of professional pre-higher education in order to create a modern, safe and inclusive educational environment on the basis of the Kropyvnytsky  Construction Vocational College. It is planned to update the material and technical base, introduce energy-efficient technologies, ensure accessibility for people with special educational needs, as well as improve conditions for practical training of education seekers in accordance with the requirements of the labor market. The implementation of the project will contribute to improving the quality of education, the competitiveness of graduates and the development of the regional economy.

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Improving the quality of services

Description of the purpose of the project and ways to achieve it

The goal of the project is to create a high-tech educational space that will provide training for competitive specialists through mastering innovative construction technologies and energy-efficient standards on modern equipment. The center should become a platform for effective interaction between the college and business, introducing elements of dual education and digital design tools (BIM). The project is also aimed at developing the human resource potential of the region by improving the skills of adults and training craftsmen for the high-quality post-war reconstruction of Ukraine.

Problems and solutions resulting from project implementation

The NPC will be created on the basis of the premises of the educational and production building of the Kropyvnytskyi Construction Vocational College. The existing base of workshops of the institution will become the foundation for the creation of the NPC, but it requires modernization and re-equipment in accordance with modern technological standards. In parallel with the renovation of the existing space, it is planned to deploy new educational and production sites equipped with high-tech equipment of the latest generation, which will allow to fully cover the spectrum of professional competencies in the field of construction and energy efficiency (the perspective plan of the NPC "Center for Modern Construction Technologies and Innovations".

Socio-economic context

Indicator

Value

Other social

701 human

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

Professional education, specialized education

Stream

Modernization of the infrastructure of vocational and specialized pre-higher education institutions

Strategic document

Регіональна стратегія розвитку

Task

2.1.3. Development of high-quality professional (vocational and technical, professional pre-university, higher) education taking into account the needs of regional and interregional labor markets, promotion of vocational training through dual education

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Методологія оцінки попиту базується на комплексному аналізі актуальних вакансій регіонального ринку праці та стратегічних планів відбудови Кіровоградщини. Використовується метод анкетування провідних забудовників для виявлення дефіцитних навичок, що дозволяє адаптувати навчальні програми під реальні технологічні запити бізнесу. Також застосовано прогностичне моделювання потреб у перепідготовці ветеранів та ВПО, що забезпечує соціальну значущість та стале фінансування центру.
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
701 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Preliminary Investment Feasibility Study]
The project will create jobs available to women (temporarily or permanently)
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Justification of the cost of the project at the Kropyvnytskyi Construction Vocational College (1) (1).xlsx
01.04.2026
05:36:10 UTC
The need for equipment for the Construction College's NPC (1) (1).docx
01.04.2026
05:36:10 UTC

Alternative technical solutions

Technical Solution 1

Improving the quality of educational services and modernization through the purchase of the latest equipment for equipping laboratories

Technical Solution 2

Laboratory of Intelligent Engineering Systems and Housing and Utilities Innovations

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)11'075'710 UAH11'075'710 UAH
For preparation10'000 UAH10'000 UAH
For implementation11'065'710 UAH11'065'710 UAH
Project operation and closure cost45'000 UAH45'000 UAH
For operation35'000 UAH35'000 UAH
For closing10'000 UAH10'000 UAH
Average annual costs35 UAH0 UAH
Project duration, incl.9 months9 months
Deadline for developing a FFS1 month1 month
Implementation period8 months8 months
Service life180 months15 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, both national and international

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget11'120'710 UAH11'120'710 UAH
Project cost (preparation and implementation)11'075'710 UAH11'075'710 UAH
For preparation10'000 UAH10'000 UAH
For implementation11'065'710 UAH11'065'710 UAH
Project operation and closure cost45'000 UAH45'000 UAH
For operation35'000 UAH35'000 UAH
For closing10'000 UAH10'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitСередня вартість проєкту на одного учня
Service Unit Cost15'864 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
No – analysis not performed

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Partially, we have limited experience

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic justification - forming a justification for the problem and need

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Management rationale - project management

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Management rationale - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Is there an understanding of where to find relevant experts and consultants?
Partially, we are considering options

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Economic riskDefinedUndefined

Team involvement

How exactly are/will stakeholders be involved?
Meetings with local authorities

[Response was provided in the Investment Feasibility Study]

Public consultations

[Response was provided in the Investment Feasibility Study]

Public hearings

[Response was provided in the Investment Feasibility Study]

When are/will engagement activities be taking place?
At the project preparation stage

[Response was provided in the Investment Feasibility Study]

How is/will the public be informed about the importance of participation and available channels for feedback?
Official websites

[Response was provided in the Investment Feasibility Study]

Social networks

[Response was provided in the Investment Feasibility Study]

Local media

[Response was provided in the Investment Feasibility Study]

Are public hearings being held/will they be held (offline, online)?
Yes, offline.

[Response was provided in the Investment Feasibility Study]

Проєкт передбачає обов'язкове проведення громадських обговорень у змішаному форматі для врахування думок мешканців громади та експертного середовища. Офлайн-зустрічі на базі коледжу поєднуватимуться з онлайн-консультаціями через платформу DREAM та соціальні мережі, що забезпечить максимальну прозорість та інклюзивність процесу прийняття рішень.
Who will attend the public hearings?
Community representatives

[Response was provided in the Investment Feasibility Study]

Government officials

[Response was provided in the Investment Feasibility Study]

Public hearings have already been held
Yes

[Response was provided in the Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

Finalization of existing documentation for the preparation of a preliminary feasibility study
[Response was provided in the Investment Feasibility Study]

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
01/04/2026SP-R-010426-69C53640Regional SPInvestment Feasibility StudyIncludeThe project is planned to be implemented at the expense of subvention funds from the state budget on co-financing terms.-
07/04/2026SP-N-070426-01ADCC9AState SPInvestment Feasibility StudyInclude--
06/04/2026SPP-R-060426-9DA205F7Regional SPPInvestment Feasibility StudyInclude--