Major repairs of the anti-radiation shelter at the address: Kherson region, Beryslav district, Velyka Oleksandrivka village, Svobody street* damaged as a result of the armed aggression of the Russian Federation
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
The project for the overhaul of the radiation shelter provides for a complex of construction works aimed at the complete restoration, modernization of engineering networks and structural elements to ensure the protection of people from ionizing radiation and other damaging factors. The project involves the restoration of protective properties, replacement of worn-out structures, and ensuring safe conditions (ventilation, water supply, bathrooms).
Main works: Structural: Repair/strengthening of load-bearing walls, foundation, waterproofing of floors and walls to prevent flooding. Engineering networks: Installation of forced ventilation systems (with filters), arrangement of water supply, sewage, power supply (lighting and power). Safety: Arrangement of main and emergency (evacuation) exits, installation of hermetic doors and protective screens. Interior decoration: Antiseptic treatment, repair of walls, floors, creation of bathrooms and places for sitting/lying. Documentation: Mandatory development of design and estimate documentation (DED) and examination. Result: Commissioning of a functional shelter that complies with DBN standards.
The purpose of the project
Main Goal:
Increasing compliance with modern standards
Secondary Goal:
Increasing compliance with modern standards, Rebuilding the damaged/destroyed, Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of IDP users
200 human
Number of people who will use the service
200 human
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
Development and Reconstruction of Subnational Infrastructure
Stream
Development and rehabilitation of municipal infrastructure of subnational governments
Strategic document
Стратегія розвитку територіальної громади
Task
1.1.2 Ensure the development of cultural and local heritage protection centers that form local self-awareness and bind residents to their places of residence
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Major repairs of the anti-radiation shelter at the address: Kherson region, Beryslav district, Velyka Oleksandrivka village, Svobody street* damaged as a result of the armed aggression of the Russian Federation
Technical Solution 2
Current repairs of a radiation shelter in a non-residential building
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]