Reconstruction of the power supply system of the Knyahynytsky Lyceum of the Rohatyn City Council of the Ivano-Frankivsk region by installing a hybrid solar power plant at the address: 77030, Ukraine, Ivano-Frankivsk region, Ivano-Frankivsk district, Knyahynychi village, R. Shukhevycha st., 6


Sector
Energy Sector
Stream
Development of renewable energy and energy efficiency in critical infrastructure facilities
Maturity level
91
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves the reconstruction of the power supply system of the Knyahynychy Lyceum (Knyahynychy village, R. Shukhevycha st., 6) with the installation of a 12 kW hybrid solar power plant and the modernization of input and distribution equipment, protection, grounding and lightning protection. An automatic transfer switch is integrated for backup power supply of critical consumers (shelter, emergency lighting, server/communications, boiler room). Expected effect: continuity of the educational process during outages, reduction of electricity costs, increased electrical safety and reduction of CO₂ emissions. Goal by 2028: annual reduction of electricity consumption and savings of budget funds on energy sources - 20% from the baseline level.

The purpose of the project

Main Goal:

Introducing innovations and energy-efficient solutions

Secondary Goal:

Contribution to climate or environmental goals, Increasing compliance with modern standards, Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

The goal of the project is to introduce an innovative and energy-efficient solution for reliable power supply to the Knyahynichi Lyceum (Knyahynichi village, R. Shukhevycha st., 6) by reconstructing the power supply system and installing a 12 kW hybrid solar power plant, which will simultaneously improve the condition of the institution's infrastructure. The project provides for the development of two start-up complexes. Achieving the goal involves the implementation of a set of turnkey works: development and examination of the power distribution system; replacement/modernization of input and distribution devices, protections, metering unit, grounding and lightning protection; installation of photovoltaic modules and a hybrid inverter with ATS integration for backup power supply of critical consumers (shelter, emergency lighting, server/communications, boiler room); setting up the monitoring and dispatching system; commissioning, design and technical supervision, personnel training and commissioning. The implementation eliminates the problem of frequent power outages and losses in worn-out networks, reduces dependence on external power supply and current expenses of the institution. The goal by 2028: to achieve an annual reduction in electricity consumption by 20% and save budget funds for paying for energy by 20% from the baseline level, ensuring the continuity of the educational process, increasing energy security and compliance with modern energy efficiency standards.

Problems and solutions resulting from project implementation

Key problems are the unreliability and deterioration of the lyceum's electrical networks, the lack of backup power for critical consumers (shelter, emergency lighting, server/communications, boiler room), unstable voltage quality, as well as the lack of modern grounding, lightning protection and monitoring systems. This is combined with high dependence on external power and increasing loads due to ICT equipment and the requirements for the continuity of the educational process. The relevance of the problems is now increasing due to frequent and long-term power outages, as well as increasing tariffs for energy carriers. Without modernization of the networks and the introduction of a local source of generation with a backup mode, the institution faces the risks of accidents and fires, damage to sensitive equipment, interruptions in training and additional budget costs for emergency repairs and "inefficient" electricity. In the longer term, this means loss of teaching hours, a decrease in the quality of educational services, and non-compliance with modern safety and energy efficiency requirements.

Socio-economic context

Indicator

Value

Other economic

20 %

Other economic

20 %

Strategic Case

Strategic feasibility of the project

Sector

Energy Sector

Subsector

Renewable energy and alternative fuels

Stream

Development of renewable energy and energy efficiency in critical infrastructure facilities

Strategic document

Стратегія розвитку територіальної громади

Task

Section 5 Climate change mitigation measures of the Rohatyn Community's Environmental and Social Development Plan until 2050

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Комбінований підхід: спрощений енергоаудит об’єкта; аналіз обліку/рахунків за 2024 р. як базу; бенчмаркінг для закладів освіти; моделювання сценаріїв «без проєкту» та «з проєктом» із цільовим скороченням –20%. Розрахункові значення: E₀ = 12 654,10 кВт·год; E₁ = 10 123,28 кВт·год; ΔE = 2 530,82 кВт·год. За тарифом 8,88 грн/кВт·год: C₀ = 112 368,41 грн; C₁ = 89 894,73 грн; ΔC = 22 473,68 грн/рік (–20%).
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
12670.42 kW
Annual demand for services/infrastructure
2
14787.25 kW
Annual demand for services/infrastructure
3
18114.75 kW
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis (Knyahynytskyi Lyceum).docx
30.12.2025
09:49:31 UTC

Alternative technical solutions

Technical Solution 1

Selected solution (baseline in the project). Hybrid solar power plant with energy storage

Technical Solution 2

Installation of a network solar power plant (without batteries), operation only when there is voltage in the network

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)1'402'825 UAH1'027'174 UAH
For preparation100'000 UAH129'699 UAH
For implementation1'302'825 UAH897'475 UAH
Project operation and closure cost39'084 UAH20'000 UAH
For operation26'056 UAH10'000 UAH
For closing13'028 UAH10'000 UAH
Average annual costs26'056 UAH0 UAH
Project duration, incl.600 months4 months
Deadline for developing a FFS300 months1 month
Implementation period300 months3 months
Service life300 months300 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, both national and international

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget1'441'909 UAH1'047'174 UAH
Project cost (preparation and implementation)1'402'825 UAH1'027'174 UAH
For preparation100'000 UAH129'699 UAH
For implementation1'302'825 UAH897'475 UAH
Project operation and closure cost39'084 UAH20'000 UAH
For operation26'056 UAH10'000 UAH
For closing13'028 UAH10'000 UAH
Чи була під час уточнення орієнтовного бюджету використана Методика розрахунку вартості публічного інвестиційного проєкту, затверджена наказом Міністерства фінансів України №316 від 23.06.2025 р.?
Yes
[Response was provided in the Investment Feasibility Study]
Чи була під час розрахунку орієнтовного бюджету використана Методика розрахунку вартості публічного інвестиційного проєкту, затверджена наказом Міністерства фінансів України №316 від 23.06.2025 р.?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Average project cost per service recipient

Service UnitОдиниця послуги: 1 кВт встановленої потужності СЕС
Service Unit Cost88'450 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - working with international financial organizations (IFOs)

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Yes, successfully implemented 1 or more similar projects

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Yes, negotiations are already underway.

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Technical riskDefinedUndefined
Economic riskDefinedUndefined
Social riskDefinedUndefined
Operational riskDefinedUndefined
Market riskDefinedUndefined
Environmental riskDefinedUndefined
Other riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

Finalization of existing documentation for the preparation of a preliminary feasibility study
[Response was provided in the Investment Feasibility Study]
Updating existing documentation regarding the preparation of the feasibility study
[Response was provided in the Investment Feasibility Study]
Updating existing documentation regarding the preparation of design and estimate documentation (DED)
[Response was provided in the Investment Feasibility Study]

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
30/12/2025SP-L-301225-502A8DB6Community SPInvestment Feasibility StudyInclude--
22/04/2026SPP-L-220426-3540CA36Community SPPInvestment Feasibility StudyInclude-91