Rohatynska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
7
Projects
Projects by sectors
7
Projects
Projects by goal
7
Projects
Projects by status
14,72 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status
Initiation date
Project cost
Status
State level of SP
Local level of SPP
Local level of SP
Date05. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creating an educational space within the framework of the “New Ukrainian School” reform – Rohatyn Urban Territorial Community

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Rohatynska community
Initiator
Rohatyn City Council Education Department
Maturity level
81
Comprehensive renovation of science classrooms through the purchase of modern equipment and preparation of premises
Current maintenance of classrooms without comprehensive updating of the material and technical base
The project solution provides for the purchase of modern educational, laboratory, multimedia, computer, demonstration and other equipment for three science classrooms in secondary education institutions of the Rohatyn urban territorial community. The solution plans to equip the chemistry classroom in the Knyahynytsky Lyceum, the geography classroom in the Rohatyn Brothers Lyceum, and the biology classroom in the Verkhnolipytsky Lyceum. Preparation of premises for the placement of equipment will be carried out at the expense of the local budget outside the cost of this project. The implementation of this solution will allow creating a modern educational space, improving learning conditions, ensuring access of students and teachers to modern equipment, and strengthening the practical, laboratory and research component of the educational process in accordance with the requirements of the "New Ukrainian School" reform.
Project cost2'620'600 UAH
Implementation period6 months
Design documentationAbsent
State level of SP
Local level of SPP
Local level of SP
Date04. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Modern educational space in Rohatyn Lyceum No. 1 of the Rohatyn City Council, Ivano-Frankivsk region

Project Goal
Increasing compliance with modern standards. Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services
Geography
Rohatyn city
Initiator
Rohatyn City Council Education Department
Maturity level
81
Comprehensive creation of a modern educational space by simultaneously equipping 5 classrooms and a STEM laboratory
Phased equipping of 5 classrooms without creating a STEM laboratory at the first stage
The solution involves comprehensively equipping the biology, physics, chemistry, mathematics, geography and STEM laboratories with modern teaching aids, computer and multimedia equipment, furniture and teaching materials. This approach ensures the creation of a single functional educational space for specialized and STEM-oriented training, practical, laboratory and interdisciplinary classes. The renovation of the premises will be carried out separately from the local budget and is not included in the cost of this solution.
Project cost5'512'415 UAH
Implementation period7 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date12. 2025
SectorEnergy Sector
SubsectorRenewable energy and alternative fuels
StatusInvestment Feasibility Study

Reconstruction of the power supply system of the Knyahynytsky Lyceum of the Rohatyn City Council of the Ivano-Frankivsk region by installing a hybrid solar power plant at the address: 77030, Ukraine, Ivano-Frankivsk region, Ivano-Frankivsk district, Knyahynychi village, R. Shukhevycha st., 6

Project Goal
Introducing innovations and energy-efficient solutions. Contribution to climate or environmental goals, Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Rohatynska community
Initiator
ROHATYN CITY COUNCIL
Maturity level
91
Selected solution (baseline in the project). Hybrid solar power plant with energy storage
Installation of a network solar power plant (without batteries), operation only when there is voltage in the network
Solar system + inverter + batteries integrated into the lyceum network; online monitoring; automatic backup of critical groups.
Project cost1'402'825 UAH
Implementation period600 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorExtracurricular education
StatusInvestment Feasibility Study

Reconstruction of the shooting range of the Rohatyn Specialized Children's and Youth Sports School of Olympic Reserve at 71 V Shevchenko St. in the city of Rohatyn, Ivano-Frankivsk region

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure
Geography
Rohatynska community
Initiator
Rohatyn City Council Education Department
Maturity level
79
Reconstruction of the shooting range of the Rohatyn Specialized Children's and Youth Sports School of Olympic Reserve at 71 V Shevchenko St. in the city of Rohatyn, Ivano-Frankivsk region
Maintaining the facility in its current state
Reconstruction of the shooting range eliminates leaks and emergency risks, restores the load-bearing and protective capacity of the roof and brings the thermal performance to the requirements of DBN V.2.6-31:2021; ensures compliance with safety standards (CMU No. 1207 of 12/27/2018, No. 375 of 04/04/2025, Order of the Ministry of Internal Affairs No. 881 of 10/31/2023) for the operation of a closed shooting range and opens the possibility of obtaining a permit from the National Police. Thanks to insulation and a new roofing "pie", heat loss and annual maintenance costs are reduced compared to maintenance in the existing state; installation of lightning protection and restoration of drainage increase safety, and the service life of the building is extended, preventing further corrosion. As a result, stable regulatory conditions are created for training 186 students and holding competitions, which supports the high status of the SDYUSSHOR.
Project cost3'685'000 UAH
Implementation period8 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing high-quality, modern and accessible general secondary education "New Ukrainian School"

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Rohatynska community
Initiator
Rohatyn City Council Education Department
Maturity level
79
Providing high-quality, modern and accessible general secondary education "New Ukrainian School"
Maintaining the current functioning of the ZZSO
The project is aimed at modernizing the educational environment of the Rohatyn State Technical and Vocational School in accordance with the principles of the National State Educational Service through the renovation of classrooms - chemistry, mathematics and geography. It is planned to combine classic, time-tested visual and laboratory tools with basic digital tools, which will increase the safety, clarity and practical component of learning for all middle and high school students.
Project cost1'377'660 UAH
Implementation period4 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date09. 2025
SectorEnergy Sector
SubsectorRenewable energy and alternative fuels
StatusInvestment Feasibility Study

Reconstruction of the power grids of the Knyahynych Lyceum of the Rohatyn City Council of the Ivano-Frankivsk region by installing a hybrid solar power plant at the address: 77030, Ukraine, Rohatyn district, Ivano-Frankivsk region, Knyahynychi village, R. Shukhevych street, building, 6

Project Goal
Introducing innovations and energy-efficient solutions. Contribution to climate or environmental goals, Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Rohatynska community
Initiator
ROHATYN CITY COUNCIL
Maturity level
81
Selected solution (baseline in the project). Hybrid solar power plant with energy storage
Installation of a network solar power plant (without batteries), operation only when there is voltage in the network
Solar system + inverter + batteries integrated into the lyceum network; online monitoring; automatic backup of critical groups.
Project cost1'402'825 UAH
Implementation period6 months
Design documentationAbsent
Local level of SPP
Local level of SP
Date09. 2025
SectorEnergy Sector
SubsectorRenewable energy and alternative fuels
StatusInvestment Feasibility Study

Reconstruction of the power supply system of the Verkhnya Lipytsia Lyceum of the Rohatyn City Council of the Ivano-Frankivsk region by installing a hybrid solar power plant at the address: 77043, Ukraine, Ivano-Frankivsk district, Ivano-Frankivsk region, Verkhnya Lipytsia village, Tsentralna street, house, 25

Project Goal
Introducing innovations and energy-efficient solutions. Contribution to climate or environmental goals
Geography
Rohatynska community
Initiator
ROHATYN CITY COUNCIL
Maturity level
79
Selected solution (baseline in the project). Hybrid solar power plant with energy storage
Installation of a network solar power plant (without batteries), operation only when there is voltage in the network.
Solar system + inverter + batteries integrated into the lyceum network; online monitoring; automatic backup of critical groups.
Project cost126'056 UAH
Implementation period6 months
Design documentationAbsent

In focus

All news