Emergency restoration work (overhaul) of an apartment building at Lesya Serdyuka St., 48/2 in Kharkiv
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
The apartment building, which suffered significant damage as a result of military operations and is subject to major repairs, is located at 48/2 Lesya Serdyuka Street and is located in the Kyiv administrative district of Kharkiv.
As a result of the impact of the weapons, there was extensive damage to the wall panels, floor slabs, covering slabs, partitions, balcony floor slabs, the enclosing walls of the building's balconies, and the exterior decoration of the building. The entrance group of the 6th entrance was damaged, and the glazing of window, balcony openings and window frames on the facades of the residential building was also partially destroyed as a result of the explosion of the means of destruction.
The working project of the major repair provides for emergency and restoration work, namely:
- dismantling of all damaged structures; - restoration of destroyed and damaged wall structures;
- restoration of destroyed and damaged sections of the ceiling and covering of structures;
- local reinforcement of wall panels and floor slabs;
- installation of a new roof on the destroyed areas and restoration on the damaged areas;
- restoration of destroyed and damaged internal partitions;
- restoration of completely destroyed balcony slabs; - restoration of damaged balcony railings plates;
- restoration of destroyed and damaged ventilation ducts;- replacement of destroyed and damaged window and door fillings with metal-plastic window and balcony doors with double-glazed windows;- restoration of facade insulation;- restoration of engine room roof insulation;
- restoration of attic floor insulation;- restoration of entrance group No. 6;
- restoration of destroyed and damaged engineering communications of the house (cold and hot water supply, sewage, drainage, heating);
- restoration of the blind area around the building. The detailed design provides for measures regarding reliability and safety, protection of building structures from corrosion, lightning protection and grounding.
The design solutions provide for changing the existing conditions of accessibility of the house for people with limited mobility, namely the arrangement barrier-free access:
- by installing external lifts from ground level to the entrance to the building in entrances 1-6;
- installing external ramps at the entrances to entrances 7-9;
- installing internal lifts in all entrances from the entrance platform to the elevator hall on the first floor.
The purpose of the project
Main Goal:
Rebuilding the damaged/destroyed
Secondary Goal:
Increasing compliance with modern standards, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Improving the quality of services, Reducing territorial or social gaps
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Other functional
7747.7 m2
Other functional
12089.1 m2
Number of people who will use the service
639 human
Other functional
23187.1 m2
Number of IDPs in the geographical area of impact of the project
212 thous. people
Population in the geographical area of influence of the project
1.3 mln people
Strategic Case
Strategic feasibility of the project
Sector
Housing
Subsector
Housing Reconstruction
Stream
Restoration of apartment buildings damaged as a result of the armed aggression of the Russian Federation
Strategic document
State Strategy for Regional Development for 2021–2027
Task
Operational objective 1. Ensuring integrated development of territories taking into account the interests of future generations. Point 2 Implementation of priority measures for life safety, restoration and stimulation of economic activity in territorial communities classified as recovery areas.
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Emergency restoration work (overhaul) of an apartment building at Lesya Serdyuka St., 48/2 in Kharkiv
Technical Solution 2
Emergency and restoration works (overhaul) of an apartment building at 48/2 Lesya Serdyuka St. in Kharkiv with the integration of renewable energy sources
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]