New construction. Technological complex for the production of heat-generating assemblies


Sector
Energy Sector
Stream
Creation of new, expansion, reconstruction, technical re-equipment of existing energy infrastructure facilities (high-voltage power transmission lines, substations, high-voltage equipment, etc.)
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
State level of SPP
Implementation
Completion

General information

Description of the project

Creating nuclear fuel and its elements production capacities in Ukraine through cooperation with other countries is the main goal of the state targeted economic program "Nuclear Fuel of Ukraine" and a number of government decisions adopted to implement this program.

     Organizing nuclear fuel production will reduce the risks of providing Ukrainian nuclear power plants with nuclear fuel, ensure the development of domestic production, preserve and create new jobs, and increase revenues to budgets of all levels.

     The Technological Complex for the Production of Fuel Assemblies Using Westinghouse Technology (hereinafter - TKVTVZ) - is a nuclear fuel manufacturing enterprise that performs operations to assemble fuel assemblies (FAs) from ready-made components and fuel rods (FWs). The TKVTVZ product is a fuel assembly completely ready for shipment to a nuclear power plant.

The purpose of the project

Main goal:

Creation of new facilities and services

Secondary goal:

Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Поява нових виробничих потужностей

Description of the purpose of the project and ways to achieve it

The creation of capacities in Ukraine for the production of nuclear fuel and its elements through cooperation with other countries is the main goal of the state targeted economic program "Nuclear Fuel of Ukraine" and a number of government decisions adopted to implement this program. The organization of nuclear fuel production will reduce the risks of providing Ukrainian NPPs with nuclear fuel, ensure the development of domestic production, preserve and create new jobs, and increase revenues to budgets of all levels. The technological complex (nuclear installation) for the production of fuel assemblies using Westinghouse technology (hereinafter referred to as the TKVTVZ) is a nuclear fuel manufacturing enterprise where operations are performed to assemble fuel assemblies (FAs) from ready-made components and fuel rods (FWs). The TKVTVZ product is a fuel assembly completely ready for shipment to a NPP. The TKVTVZ is expected to perform the following technological operations: • reception and temporary storage of components for fuel rod frames; • reception and temporary storage of fuel rods and fuel rods; • assembly of frames from components; • assembly of fuel assemblies, control, preparation for shipment, temporary storage and shipment of finished products to the relevant NPP.

Problems and solutions resulting from project implementation

The organization of nuclear fuel production will reduce the risks of providing Ukrainian nuclear power plants with nuclear fuel, ensure the development of domestic production, preserve and create new jobs, and increase revenues to budgets of all levels.

Socio-economic context

Indicator

Value

Number of jobs, including for IDPs

142 human

Other functional

200 human

Strategic Case

Strategic feasibility of the project

Sector

Energy Sector

Subsector

Electric power industry

Stream

Creation of new, expansion, reconstruction, technical re-equipment of existing energy infrastructure facilities (high-voltage power transmission lines, substations, high-voltage equipment, etc.)

Strategic document

Energy Strategy of Ukraine until 2050

Task

Ensuring a stable, balanced model of operation of the Unified Power System of Ukraine; restoration, development and transformation of the power system, its sustainable operation;; increasing the efficiency of substations

Project objectives

Indicator
Base value
Target value
production of heat-generating assemblies
0 units
570 units

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Technical and economic analysis

Has data from external sources been used in the demand assessment?

Yes

аналітичні довідки, статистичні збірки

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes

Інформація з офіційних реєстрів

Indicator
Year
Demand
Annual demand for services/infrastructure
1
570 units
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Investment Feasibility Study]

Обґрунтування: Створення ТКВТВЗ позитивно впливає на адаптацію до зміни клімату, оскільки підвищить енергетичну незалежність країни, знизить вразливість до перебоїв у глобальних ланцюгах постачання ядерно палива, тим самим забезпечить стабільне функціонування АЕС України в умовах кліматичних викликів. Крім того, підтримуватиме критичну інфраструктуру та сприятиме переходу до стійкої низьковуглецевої економіки.

Pollution prevention and control
[Response was provided in the Investment Feasibility Study]

бґрунтування: виконана оцінка впливу на довкілля підтверджує, що після реалізації планованої діяльності не передбачається теплових забруднень та випарів. Планована діяльність не впливає на інтенсивність інсоляції, на температуру, швидкість вітру, вологість, атмосферні інверсії, тривалість туманів та інші кліматичні характеристики. У зв'язку з цим значний вплив на клімат і мікроклімат відсутній.

Sustainable use and protection of water and marine resources
[Response was provided in the Investment Feasibility Study]
Protecting and restoring biodiversity and ecosystems
[Response was provided in the Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Investment Feasibility Study]

Обґрунтування: реалізація проєкту ТКВТВЗ сприяє скороченню викидів парникових газів, так як ядерне паливо дозволяє виробляти електроенергію без викидів вуглекислого газу в атмосферу у процесі генерації. Це дуже важливо для досягнення цілей вуглецевої нейтральності та боротьби зі зміною клімату. Проєкт відповідає національним і міжнародним зобов’язанням України в рамках Паризької кліматичної угоди, стратегії низьковуглецевого розвитку України до 2050 та Європейського зеленого курсу.

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

Protecting and restoring biodiversity and ecosystems
[Response was provided in the Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Investment Feasibility Study]
Transition to a circular economy
[Response was provided in the Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Investment Feasibility Study]

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Sustainable use and protection of water and marine resources
[Response was provided in the Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Investment Feasibility Study]

Обґрунтування: виконана оцінка впливу на довкілля підтверджує, що після реалізації планованої діяльності не передбачається теплових забруднень та випарів. Планована діяльність не впливає на інтенсивність інсоляції, на температуру, швидкість вітру, вологість, атмосферні інверсії, тривалість туманів та інші кліматичні характеристики. У зв'язку з цим значний вплив на клімат і мікроклімат відсутній.

Climate change adaptation
[Response was provided in the Investment Feasibility Study]

Обґрунтування: Створення ТКВТВЗ позитивно впливає на адаптацію до зміни клімату, оскільки підвищить енергетичну незалежність країни, знизить вразливість до перебоїв у глобальних ланцюгах постачання ядерно палива, тим самим забезпечить стабільне функціонування АЕС України в умовах кліматичних викликів. Крім того, підтримуватиме критичну інфраструктуру та сприятиме переходу до стійкої низьковуглецевої економіки.

Protecting and restoring biodiversity and ecosystems
[Response was provided in the Investment Feasibility Study]
Transition to a circular economy
[Response was provided in the Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Investment Feasibility Study]

Обґрунтування: реалізація проєкту ТКВТВЗ сприяє скороченню викидів парникових газів, так як ядерне паливо дозволяє виробляти електроенергію без викидів вуглекислого газу в атмосферу у процесі генерації. Це дуже важливо для досягнення цілей вуглецевої нейтральності та боротьби зі зміною клімату. Проєкт відповідає національним і міжнародним зобов’язанням України в рамках Паризької кліматичної угоди, стратегії низьковуглецевого розвитку України до 2050 та Європейського зеленого курсу.

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

Climate change adaptation
[Response was provided in the Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Investment Feasibility Study]
Transition to a circular economy
[Response was provided in the Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Investment Feasibility Study]
Protecting and restoring biodiversity and ecosystems
[Response was provided in the Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Investment Feasibility Study]

Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?

Yes
[Response was provided in the Investment Feasibility Study]

486hgc28-7z4z-4ype-98zk-pcq84swhkhwk

Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?

Yes, it was conducted
[Response was provided in the Investment Feasibility Study]

Висновок з оцінки впливу на довкілля від 09.05.2025 № 21/01-6259/1 https://energoatom.com.ua/storage/media/files/pdf-file/%D0%97%D0%B2%D1%96%D1%82%D0%9E%D0%92%D0%94%D0%A2%D0%9A%D0%92%D0%A2%D0%92.pdf

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

The project may result in the forced displacement of women, men and other gender groups or loss of access to resources
[Response was provided in the Investment Feasibility Study]
Not applicable to my project
[Response was provided in the Investment Feasibility Study]
Other gender risks
[Response was provided in the Investment Feasibility Study]
There are risks of impaired mobility or safety for women, men and other gender groups during construction/operation
[Response was provided in the Investment Feasibility Study]
There is a risk of reduced economic opportunities for women, men and other gender groups (e.g. loss of jobs or retail outlets)
[Response was provided in the Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Investment Feasibility Study]
Other benefits from project implementation
[Response was provided in the Investment Feasibility Study]
Envisaged training or advanced training for women in the private sector
[Response was provided in the Investment Feasibility Study]
The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Investment Feasibility Study]
The project will create jobs available to women (temporarily or permanently)
[Response was provided in the Investment Feasibility Study]
The project will improve women's access to safe water, food, and medical services
[Response was provided in the Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Investment Feasibility Study]

Were consultations held with representatives of target groups to take into account gender equality issues in the project?

Focus groups or consultations with women and vulnerable groups were held
[Response was provided in the Investment Feasibility Study]
Feedback on the project design was received from organizations working with women
[Response was provided in the Investment Feasibility Study]
No consultations were held with target groups.
[Response was provided in the Investment Feasibility Study]
Women's participation is ensured at various stages of planning (including public hearings)
[Response was provided in the Investment Feasibility Study]

Have the gender risks and social impacts of the project been assessed?

All possible positive impacts of the project on women, men or other gender groups have been identified
[Response was provided in the Investment Feasibility Study]
A plan to mitigate negative social impacts focused on women has been developed
[Response was provided in the Investment Feasibility Study]
The percentage of women who could be resettled has been quantified
[Response was provided in the Investment Feasibility Study]
The percentage of women who may lose or gain access to resources (water, food, healthcare) is quantified.
[Response was provided in the Investment Feasibility Study]
The percentage of women who will gain new educational/professional opportunities is quantified
[Response was provided in the Investment Feasibility Study]
All possible negative impacts of the project on women, men or other gender groups have been identified
[Response was provided in the Investment Feasibility Study]

Are there management and institutional mechanisms in place to ensure gender equality?

A policy/code of conduct on non-discrimination and gender equality has been developed
[Response was provided in the Investment Feasibility Study]
A gender specialist/advisor is included in the project management structure
[Response was provided in the Investment Feasibility Study]
Mandatory training for project staff on gender equality and inclusion is provided
[Response was provided in the Investment Feasibility Study]
Not provided for by the project
[Response was provided in the Investment Feasibility Study]

Documents

Name
Date
Investment costs_0001.pdf
24.09.2025
12:29:20 UTC
Expert report 00-0200-01-24-PB dated 20.08.2024.pdf
24.09.2025
12:29:27 UTC

Alternative technical solutions

Technical Solution 1

New construction. Technological complex for the production of heat-generating assemblies

Technical Solution 2

Purchasing nuclear fuel from foreign suppliers

Total costs9'320'217'459 UAH0 UAH
  • For preparation
  • 48'054'000 UAH0 UAH
  • For implementation
  • 9'272'163'459 UAH0 UAH
    Average annual costs0 UAH1 UAH
    Project duration, incl.60 months24 months
  • Deadline for developing a FFS
  • 24 months12 months
  • Implementation period
  • 36 months12 months
    Service life720 months12 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    0
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Investment Feasibility Study]

    Будівельні роботи передбачається виконувати штатним персоналом Генпідрядної організації, яка буде визначена згідно Закону України «Про публічні закупівлі», із залученням, за необхідністю, спеціалізованих Субпідрядних організацій.

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Investment Feasibility Study]

    Генпідрядна організація має право залучати за необхідністю спеціалізованих Субпідрядних організацій.

    Will the project involve national or international suppliers and contractors?
    Yes, both national and international

    [Response was provided in the Investment Feasibility Study]

    В рамках проекту ТКВТВЗ запланована реалізація технології Westinghouse. Технологія виготовлення ТВЗ використовується на заводах виготовлення ТВЗ в штаті Колумбія (США), Спрингфілд (Великобританія), Вестерос (Швеція).

    Has an analysis of available procurement options been conducted for the technical solution?
    No

    [Response was provided in the Investment Feasibility Study]

    What procurement strategy was chosen for the project implementation, and what justifies its feasibility in the context of the market and project objectives?
    Стратегія відповідаю сучасним вимогам енергоефективності відповідно до проведених аналітичних досліджень

    [Response was provided in the Investment Feasibility Study]

    What approaches are planned to be used to ensure transparency, competition, and efficiency in the procurement process?
    ProZorro, незалежний нагляд, публічне звітування

    [Response was provided in the Investment Feasibility Study]

    What types of procurement procedures are envisaged by the project (open tender, negotiated procedure, competitive dialogue, etc.)?
    Open competitive bidding

    [Response was provided in the Investment Feasibility Study]

    Other

    [Response was provided in the Investment Feasibility Study]

    Competitive dialogue

    [Response was provided in the Investment Feasibility Study]

    Direct negotiation procedures

    [Response was provided in the Investment Feasibility Study]

    Pre-market engagement
    огляд відкритих тендерів, консультації з експертами, аналіз аналогічних проєктів, прямі запити до компаній

    [Response was provided in the Investment Feasibility Study]

    Potential market participants
    В рамках проекту ТКВТВЗ запланована реалізація технології Westinghouse. Хвостовики та головки ТВЗ будуть поступати з виробничого підприємства ВП «Атоменергомаш». Також розглядаються для співпраці інші українські та іноземні постачальники.

    [Response was provided in the Investment Feasibility Study]

    Market readiness assessment
    Попит на ядерне паливо стабільно зростає як на глобальному рівні, так і в Україні, особливо в контексті енергетичної незалежності та декарбонізації економіки. Всесвітня ядерна асоціація використовує три сценарії: базовий, оптимістичний і песимістичний – для моделювання попиту. Звіт Всесвітньої ядерної асоціації «The Nuclear Fuel Report: Global Scenarios for Demand and Supply Availability 2021-2040» Прогнози враховують зростання попиту на ядерне паливо та електроенергію, перехід до низьковуглецевої економіки та геополітичні ризики і санкції, що впливають на доступ до російських потужностей зі збагачення урану. Україна, як країна з діючими АЕС, має стабільний внутрішній попит, який зростає у зв’язку з планами локалізації виробництва палива та будівництва нових АЕС.

    [Response was provided in the Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget9'320'217'459 UAH0 UAH
    Capital costs9'320'217'459 UAH0 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation48'054'000 UAH0 UAH
    For implementation9'272'163'459 UAH0 UAH
    For operation0 UAH0 UAH
    For closing0 UAH0 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service UnitВартість однієї ТВЗ
    Service Unit Cost16'351'258 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseYesNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    No – analysis not performed

    [Response was provided in the Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    No, no assessment was conducted.

    [Response was provided in the Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Investment Feasibility Study]

    Management Rationale

    Team competencies

    Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
    Strategic justification - analysis of the strategic feasibility of the project

    [Response was provided in the Investment Feasibility Study]

    Economic justification - economic analysis

    [Response was provided in the Investment Feasibility Study]

    Project management - communication with stakeholders

    [Response was provided in the Investment Feasibility Study]

    Project management - risk management

    [Response was provided in the Investment Feasibility Study]

    Economic justification - social and gender analysis

    [Response was provided in the Investment Feasibility Study]

    Project management - public consultations

    [Response was provided in the Investment Feasibility Study]

    Economic feasibility study - technical expertise

    [Response was provided in the Investment Feasibility Study]

    Business case - analysis of available procurement options

    [Response was provided in the Investment Feasibility Study]

    Project management - legal support

    [Response was provided in the Investment Feasibility Study]

    Strategic rationale - SDG compliance analysis

    [Response was provided in the Investment Feasibility Study]

    Project management - working with international financial organizations (IFOs)

    [Response was provided in the Investment Feasibility Study]

    Financial analysis - financial analysis

    [Response was provided in the Investment Feasibility Study]

    Strategic rationale - demand analysis

    [Response was provided in the Investment Feasibility Study]

    Economic justification - environmental expertise

    [Response was provided in the Investment Feasibility Study]

    Business case - analysis of the market environment

    [Response was provided in the Investment Feasibility Study]

    Does the team have experience implementing similar projects?
    Yes, successfully implemented 1 or more similar projects

    [Response was provided in the Investment Feasibility Study]

    Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
    Economic feasibility study - technical expertise

    [Response was provided in the Investment Feasibility Study]

    експертиза проєктної документації

    Economic justification - social and gender analysis

    [Response was provided in the Investment Feasibility Study]

    Strategic justification - forming a justification for the problem and need

    [Response was provided in the Investment Feasibility Study]

    Management rationale - public consultation

    [Response was provided in the Investment Feasibility Study]

    Business case - analysis of the market environment

    [Response was provided in the Investment Feasibility Study]

    Economic justification - environmental expertise

    [Response was provided in the Investment Feasibility Study]

    оцінка впливу на довкілля планової діяльності

    Management rationale - project management

    [Response was provided in the Investment Feasibility Study]

    Strategic rationale - SDG compliance analysis

    [Response was provided in the Investment Feasibility Study]

    Management rationale - communication with stakeholders

    [Response was provided in the Investment Feasibility Study]

    Business case - analysis of available procurement options

    [Response was provided in the Investment Feasibility Study]

    Economic justification - economic analysis

    [Response was provided in the Investment Feasibility Study]

    експертиза проєктної документації

    Management justification - other

    [Response was provided in the Investment Feasibility Study]

    Financial analysis - financial analysis

    [Response was provided in the Investment Feasibility Study]

    Management rationale - risk management

    [Response was provided in the Investment Feasibility Study]

    Strategic justification - analysis of the strategic feasibility of the project

    [Response was provided in the Investment Feasibility Study]

    Strategic rationale - demand analysis

    [Response was provided in the Investment Feasibility Study]

    Management rationale - working with international financial organizations (IFOs)

    [Response was provided in the Investment Feasibility Study]

    Management justification - legal support

    [Response was provided in the Investment Feasibility Study]

    Is there an understanding of where to find relevant experts and consultants?
    Yes, negotiations are already underway.

    [Response was provided in the Investment Feasibility Study]

    Is the project management structure defined: working group, chair, project team?
    Yes

    [Response was provided in the Investment Feasibility Study]

    What categories of experts and consultants have already been involved at the project preparation stage?
    Specialists in interaction with international financial organizations (IFOs)

    [Response was provided in the Investment Feasibility Study]

    Environmental experts

    [Response was provided in the Investment Feasibility Study]

    Others

    [Response was provided in the Investment Feasibility Study]

    Акціонерне товариство «КИЇВСЬКИЙ НАУКОВО-ДОСЛІДНИЙ ТА ПРОЕКТНО-КОНСТРУКТОРСЬКИЙ ІНСТИТУТ «ЕНЕРГОПРОЕКТ»

    Financial consultants/modelers

    [Response was provided in the Investment Feasibility Study]

    Legal consultants

    [Response was provided in the Investment Feasibility Study]

    Commercial experts

    [Response was provided in the Investment Feasibility Study]

    Economic analysts

    [Response was provided in the Investment Feasibility Study]

    Strategic consultants

    [Response was provided in the Investment Feasibility Study]

    Technical experts

    [Response was provided in the Investment Feasibility Study]

    Social/gender consultants

    [Response was provided in the Investment Feasibility Study]

    Management experts / project managers

    [Response was provided in the Investment Feasibility Study]

    Are there plans to involve experts and consultants for further implementation of the project?
    Yes

    [Response was provided in the Investment Feasibility Study]

    Екологічна експертиза, експертиза проєктної документації, представників компанії Westinghouse

    Risk assessment

    Technical riskDefinedUndefined
    Financial riskDefinedUndefined
    Political riskDefinedUndefined
    Operational riskDefinedUndefined
    Other riskDefinedUndefined

    Organizational events

    ResponseDefinedUndefined

    Team involvement

    How exactly are/will stakeholders be involved?
    Focus group

    [Response was provided in the Investment Feasibility Study]

    Online survey

    [Response was provided in the Investment Feasibility Study]

    Meetings with local authorities

    [Response was provided in the Investment Feasibility Study]

    In another way

    [Response was provided in the Investment Feasibility Study]

    Public consultations

    [Response was provided in the Investment Feasibility Study]

    Public hearings

    [Response was provided in the Investment Feasibility Study]

    When are/will engagement activities be taking place?
    At the project monitoring stage

    [Response was provided in the Investment Feasibility Study]

    At the project implementation stage

    [Response was provided in the Investment Feasibility Study]

    At the project preparation stage

    [Response was provided in the Investment Feasibility Study]

    In another way

    [Response was provided in the Investment Feasibility Study]

    How is/will the public be informed about the importance of participation and available channels for feedback?
    In another way

    [Response was provided in the Investment Feasibility Study]

    Official websites

    [Response was provided in the Investment Feasibility Study]

    https://energoatom.com.ua/advertisement/ogolosennia-pro-pocatok-gromadskogo-obgovorennia-zvitu-z-ocinki-vplivu-na-dovkillia-tkvtvz
    Social networks

    [Response was provided in the Investment Feasibility Study]

    Local media

    [Response was provided in the Investment Feasibility Study]

    Are public hearings being held/will they be held (offline, online)?
    Yes, online

    [Response was provided in the Investment Feasibility Study]

    У період воєнного стану в Україні громадські слухання проводяться у режимі відеоконференції, про що зазначається в оголошенні про початок громадського обговорення звіту з оцінки впливу на довкілля та у звіті про громадське обговорення
    Who will attend the public hearings?
    Representatives of public organizations

    [Response was provided in the Investment Feasibility Study]

    Experts

    [Response was provided in the Investment Feasibility Study]

    Community representatives

    [Response was provided in the Investment Feasibility Study]

    Government officials

    [Response was provided in the Investment Feasibility Study]

    Other representatives

    [Response was provided in the Investment Feasibility Study]

    Public hearings have already been held
    Yes

    [Response was provided in the Investment Feasibility Study]

    Звіт про громадське обговорення від 09.05.2025 № 21/01-6259/2
    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Is there ongoing cooperation or support within the framework of international technical assistance (ITA) or from other donor or government agencies?

    No
    [Response was provided in the Investment Feasibility Study]

    Does the project require preparation assistance from Project Preparation Programs (PPF)?

    Development of a full feasibility study;
    [Response was provided in the Investment Feasibility Study]
    Finalization of existing documentation for the preparation of a preliminary feasibility study
    [Response was provided in the Investment Feasibility Study]
    Development of design and estimate documentation (DED);
    [Response was provided in the Investment Feasibility Study]
    Updating existing documentation regarding the preparation of design and estimate documentation (DED)
    [Response was provided in the Investment Feasibility Study]
    Updating existing documentation regarding the preparation of the feasibility study
    [Response was provided in the Investment Feasibility Study]
    Other
    [Response was provided in the Investment Feasibility Study]

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    Other
    [Response was provided in the Investment Feasibility Study]
    Finalization of existing documentation for the preparation of a preliminary feasibility study
    [Response was provided in the Investment Feasibility Study]
    Updating existing documentation regarding the preparation of the feasibility study
    [Response was provided in the Investment Feasibility Study]
    Updating existing documentation regarding the preparation of design and estimate documentation (DED)
    [Response was provided in the Investment Feasibility Study]
    Need for financing

    Does the project require additional funding for preparation?

    No
    [Response was provided in the Investment Feasibility Study]