General information
Description of the project
The project provides for the implementation of emergency and restoration and capital works within the premises of common use, as well as on elements of common property that were damaged as a result of the armed aggression of the Russian Federation.
The main works include:
replacement of the roofing;
replacement of damaged windows and doors;
repair of facades in the areas of damage;
replacement of damaged engineering networks (water supply, sewage, heating, electricity supply, corridor lighting).
The works are exclusively restorative in nature and are aimed at bringing the building into a safe operational condition.
The project provides for the following organizational and technological scheme of works for capital repairs:
− Performance of works on dismantling the following elements of the building:
• roofing and damaged rafter structures;
• filling window and door openings;
• internal engineering networks;
• interior decoration and floors in public areas;
• facade decoration in the damaged area;
• damaged area of the blind area.
− Performing work on arranging reinforcement elements for load-bearing structures and laying a breach in the external wall;
− Performing work on replacing damaged rafter structures, arranging additional fasteners for wooden rafter system posts, hydrobarrier, laths
and metal tile roofing;
− Installing waterproofing and insulation of external walls below ground level and blind area within the dismantled area;
− Installation of risers of internal engineering networks (water supply and sewage), replacement of existing heating devices and pipelines with new ones, for premises subject to repair, installation of power supply and lighting of corridors of a residential building;
− Filling of window openings;
− Filling of doorways in common areas and decoration of interior spaces belonging to common property;
− Decoration of facades within the dismantled area.
The purpose of the project
Main Goal:
Rebuilding the damaged/destroyed
Secondary Goal:
Improving the condition of infrastructure
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of users from low-mobility population groups
3 human
Number of IDP users
9 human
Number of people who will use the service
180 human
Strategic Case
Strategic feasibility of the project
Sector
Housing
Subsector
Housing Reconstruction
Stream
Major repairs, emergency and restoration works of the common property of a three-story apartment building, damaged as a result of the armed aggression of the Russian Federation, at the address: Odesa region, Odessa district, Chornomorske village, Kurortna st., 2
Strategic document
Регіональна стратегія розвитку
Task
O2.1.3 Improving the level and quality of living conditions
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Major repairs, emergency and restoration works of the common property of a three-story apartment building, damaged as a result of the armed aggression of the Russian Federation, at the address: Odesa region, Odessa district, Chornomorske village, Kurortna st., 2
Technical Solution 2
Reconstruction of a three-story apartment building damaged as a result of the armed aggression of the Russian Federation, at the address: Odesa region, Odessa district, Chornomorske village, Kurortna st., 2
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]