New construction of a photovoltaic power plant for a complex of buildings and structures for biological wastewater treatment, at the address: Mykolaiv region, Voznesensky district, Novohrygoriv village council


Sector
Municipal infrastructure and services
Stream
Restoration, development and modernization of centralized water supply and wastewater infrastructure, including the introduction of alternative energy sources
Maturity level
81
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
State level of SP
Implementation
Completion

General information

Description of the project

The project involves the construction of a photovoltaic power plant (PVPP) on the territory of the municipal enterprise "Vodopostaktiona m. Voznesenska" (Mykolaiv region, Voznesensky district, Novohrygorivska village council). The goal is to provide electricity to a complex of buildings and structures for biological wastewater treatment, which are critical infrastructure facilities of the community. The installation of the PVPP will allow:

to reduce electricity consumption from the network;

to increase the energy independence and reliability of the water utility's electricity supply;

to provide backup power in the event of power outages;

to reduce greenhouse gas emissions and the load on traditional generation

The purpose of the project

Main Goal:

Introducing innovations and energy-efficient solutions

Secondary Goal:

Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

The project's goal is to increase the energy sustainability and reliability of the community's wastewater facilities by building a photovoltaic power plant for a complex of buildings and facilities for biological wastewater treatment. The project is designed to: • provide backup and autonomous power supply for wastewater treatment facilities; • reduce electricity consumption from the network and reduce costs for its purchase; • increase energy efficiency and reduce greenhouse gas emissions; • create a model of sustainable energy supply for critical facilities that can be scaled to other community utilities.

Problems and solutions resulting from project implementation

Problems and results of their solution as a result of the project implementation Main problems: 1. High energy dependence of the wastewater treatment system on external power supply, which creates risks of stopping the operation of treatment facilities in the event of accidents or outages. 2. Significant electricity consumption (over 1 million kWh per year) and, accordingly, high costs for its purchase, which increases the financial burden on the KP "Water Supply of Voznesenska". 3. Increasing the cost of electricity and instability of tariffs, which complicate the planning of enterprise costs. 4. Lack of backup power sources, which increases the risks of stopping water supply and the emergence of environmental problems in the event of a power outage. 5. Negative environmental impact due to the use of electricity generated from fossil fuels, which contributes to CO₂ emissions and worsening climate indicators. Results of the project implementation: 1. Increasing energy independence and uninterrupted operation of the wastewater treatment system thanks to its own generation source. 2. Reducing electricity consumption from the network to 40–45% of the current level, which will provide annual savings of up to 80 thousand euros. 3. Protecting the community from power outages - treatment plants will be able to operate autonomously even during outages. 4. Reducing the operating costs of the enterprise and reducing the financial burden on the local budget. 5. Reducing greenhouse gas emissions by 160–240 tons of CO₂ annually, which contributes to achieving the environmental goals of the community. 6. Creating a sustainable energy model that can be replicated at other municipal facilities in the Voznesensk community.

Socio-economic context

Indicator

Value

Number of people who will use the service

6150 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Water supply and sanitation

Stream

Restoration, development and modernization of centralized water supply and wastewater infrastructure, including the introduction of alternative energy sources

Strategic document

Стратегія розвитку територіальної громади

Task

2.1.1.; 2.1.2. ; 2.2.2.; 2.2.3. Development and implementation of renewable energy sources; Implementation of energy saving measures; Conservation of water resources; 2.2.3. Environmental protection

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

• аналізу фактичного обсягу водовідведення та енергоспоживання очисних споруд за 2019–2023 роки; • вивчення тарифної динаміки на електроенергію та прогнозів її зростання; • аналізу кількості підключених абонентів до централізованої системи водовідведення та тенденцій збільшення навантаження через приріст населення та промислового споживання; • врахування сценаріїв розвитку громади згідно зі Стратегією розвитку Вознесенської МТГ до 2030 року
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
6150 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Preliminary Investment Feasibility Study]
Protecting and restoring biodiversity and ecosystems
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

None of the options are applicable

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
economic analysis.docx
23.10.2025
09:04:28 UTC

Alternative technical solutions

Technical Solution 1

New construction of a photovoltaic power plant for a complex of buildings and structures for biological wastewater treatment, at the address: Mykolaiv region, Voznesensky district, Novohrygoriv village council

Technical Solution 2

Construction of a 300 kW photovoltaic power plant (PVPP) without an energy storage system (batteries)

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)21'575'000 UAH12'575'000 UAH
For preparation575'000 UAH575'000 UAH
For implementation21'000'000 UAH12'000'000 UAH
Project operation and closure cost0 UAH0 UAH
Average annual costs100'000 UAH0 UAH
Project duration, incl.10 months9 months
Deadline for developing a FFS5 months4 months
Implementation period5 months5 months
Service life240 months240 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, both national and international

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget21'575'000 UAH12'575'000 UAH
Project cost (preparation and implementation)21'575'000 UAH12'575'000 UAH
For preparation575'000 UAH575'000 UAH
For implementation21'000'000 UAH12'000'000 UAH
Project operation and closure cost0 UAH0 UAH
For operation0 UAH0 UAH
For closing0 UAH0 UAH
Чи була під час уточнення орієнтовного бюджету використана Методика розрахунку вартості публічного інвестиційного проєкту, затверджена наказом Міністерства фінансів України №316 від 23.06.2025 р.?
Yes
[Response was provided in the Investment Feasibility Study]
Чи була під час розрахунку орієнтовного бюджету використана Методика розрахунку вартості публічного інвестиційного проєкту, затверджена наказом Міністерства фінансів України №316 від 23.06.2025 р.?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Average project cost per service recipient

Service UnitВартість одиниці продукції (1 кВт·год) за капітальними вкладеннями
Service Unit Cost53 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - working with international financial organizations (IFOs)

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Partially, we have limited experience

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Yes, negotiations are already underway.

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Technical riskDefinedUndefined
Financial riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

Finalization of existing documentation for the preparation of a preliminary feasibility study
[Response was provided in the Investment Feasibility Study]
Updating existing documentation regarding the preparation of the feasibility study
[Response was provided in the Investment Feasibility Study]

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
23/10/2025SP-L-231025-45596D14Community SPInvestment Feasibility StudyIncludeStrategic fit confirmed-
19/03/2026SP-N-190326-78AA363EState SPInvestment Feasibility StudyInclude--
29/10/2025SPP-L-291025-0DC40AD6Community SPPInvestment Feasibility StudyIncludeStrategic fit confirmed by the community investment council81