General information
Description of the project
At the beginning of March 2022, hostilities took place on the territory of the Voznesensk urban territorial community. As a result of an emergency situation of a military nature caused by the armed aggression of the Russian Federation, the galvanized sheet on the roof of the building was destroyed, the wooden structure of the roof with a coating of asbestos-cement sheets was damaged, and the metal-plastic windows were destroyed. The entrance door, 5 sections of the fence made of metal rods, 16 solar collectors and a tank with a heat exchanger were damaged. To restore the operation of the institution, work was carried out at the expense of the city budget to replace windows and doors, the fence, and repair solar collectors. The issue of major roof repairs remains unresolved. The implementation of this project is planned in two stages. The first stage is the replacement of the existing kindergarten coating made of asbestos-cement corrugated sheets with a coating made of a metal profile. insulation of the attic ceiling with rock wool, installation of an external organized drainage system from the roof of the building, installation of lightning protection. The second stage is insulation of the swimming pool ceiling with rock wool, replacement of the pool and extension covering with a covering made of soft roll materials in two layers. The project has a social component, since its final result is the creation of proper sanitary and hygienic conditions for participants in the educational process, a safe educational environment.
The purpose of the project
Main Goal:
Increasing compliance with modern standards
Secondary Goal:
Improving the quality of services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
340 human
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
Urban planning and landscaping
Stream
Improving energy efficiency in public buildings
Strategic document
Стратегія розвитку територіальної громади
Task
2.1.1.; 2.1.2. Development and implementation of renewable energy sources; Implementation of energy saving measures;
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Overhaul of the roof of the Voznesensk Industrial Complex "ZONZ - DNZ" No. 3 of the Voznesensk City Council on the street. Titova, 4, Voznesensk, Mykolaiv region
Technical Solution 2
Partial repairs using modern PVC membranes or rolled bitumen-polymer materials
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]