New construction of the water supply network Havrylivka-Lubyanka-Blystavytsia-Bucha-Vorzel in the territory of the Bucha territorial community of Kyiv region


Sector
Municipal infrastructure and services
Stream
Restoration, development and modernization of centralized water supply and wastewater infrastructure, including the introduction of alternative energy sources
Project Status
Preliminary Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Investment Feasibility Study
Implementation
Completion

General information

Description of the project

 By shelling the city of Bucha and the village of Vorzel, the troops of the Russian Federation destroyed the balanced water supply system of the city of Bucha and the village of Vorzel. Water towers, wells, main and distribution water pipes were destroyed. The main part of the existing wells in the territory of the city of Bucha has exhausted its resource (the debit fell to 5-6 m3/h). For reliable water supply of the city of Bucha, a set of works is being carried out that will ensure reliable water supply of the city of Bucha and the village of Vorzel, taking into account the prospective needs of these settlements in drinking water, namely: new construction of a groundwater intake from 6 artesian wells to the Cenomanian aquifer on the territory of the existing sanitary protection zones of the wells of the Gavrylivka hydroelectric complex. (the debit of each well is 40 m3/h) is being carried out by LLC "Ukrbudvodproekt"; pumping station 240 m 3 / h, with the installation of two working pumps of 120 m 3 / h each with cascade inclusion. Also one emergency and one reserve, with automatic inclusion of the reserve on the territory of the hydroelectric power plant in the village of Havrylivka; water supply (two threads) from the village of Havrylivka to the village of Vorzel with an internal diameter of 200 mm, to meet the needs of residents of the Buchansk urban territorial community 240 m 3 / h; a pumping station should be provided at the hydroelectric power plant in the village of Blystavytsia; pumping station of the 2nd lift with clean water tanks with a volume of 3000 m 3 and an organic water purification station with a capacity of 6000 m 3 / day on Lesi Ukrainky Street 28/1 in the village of Vorzel; a water supply that will connect the clean water tanks of the existing pumping station of the 2nd lift on the street. Volodymyr Kovalskyi in the city of Bucha with a designed pumping station of the 2nd lift on Lesi Ukrainky St., 28/1 in the village of Vorzel. Within the framework of this project "New construction of the water supply network Havrylivka-Lubyanka-Blystavytsia-Bucha-Vorzel on the territory of the Bucha territorial community of the Kyiv region", adjustments were made to the project "New construction of the urban water supply system (ringing of clean water tanks on Volodymyr Kovalskyi St. in the city of Bucha and on Lesi Ukrainky St. in the village of Vorzel) on the territory of the Bucha territorial community of the Kyiv region. Adjustments" and included in the project Volume 4. Ringing of clean water tanks on Volodymyr Kovalskyi St. in the city of Bucha and hydroelectric power station on Lesi Ukrainky St., building 28/1a in the village of Vorzel". Also, within the framework of this project, adjustments were made to the project "New construction of a 2nd lift pumping station with clean water tanks and a deironing station with a capacity of 6000 m3/day on Lesi Ukrainky Street, building 28/1a, in the village of Vorzel, Buchanskyi territorial community, Buchanskyi district, Kyiv region" and included in the project in four volumes, namely: as Volume 5 Hydroblock on Lesi Ukrainky Street, building 28/1a in the village of Vorzel. Deironing station with a capacity of 6000 m3/day. These projects are interconnected.

The purpose of the project

Main goal:

Improving the equality of wealth distribution

Secondary goal:

Meeting demand

Description of the purpose of the project and ways to achieve it

Ensuring reliable and uninterrupted water supply for the residents of Bucha

Problems and solutions resulting from project implementation

The project involves the construction of two water supply lines with a diameter of 250x14.8 m from the hydroelectric power plant in the village of Havrylivka to the hydroelectric power plant on Lesi Ukrainky Street, building 28/1a, in the village of Vorzel. The total length of the pipeline route is 19,960 meters (in 2 strands). Since the pipeline route runs along a rather complex terrain, including taking into account the high-altitude location of the hydroelectric power plants in the village of Havrylivka and the hydroelectric power plant on Lesi Ukrainky Street, building 28/1a, in the village of Vorzel, the project involves the construction of an intermediate hydroelectric power plant in the village of Blystavytsia. Thus, the total route of the water supply lines is divided into two sections. The length of the first section from the village of Havrylivka to the village of Blystavytsia is 11,140 meters and it is planned to build it from pipes with a diameter of 250x14.8 PE100 SDR17. The length of the second section of the water supply route is 8820 meters and it is also planned to build it from pipes with a diameter of 250x14.8 PE100 SDR17. Electrical solutions. The estimated electrical load of the pumping station is 112.5 kW. The estimated electrical load of five wells is 137.5 kW. The power supply of the wells and the hydroelectric power station is planned at the expense of the existing capacities from TP 483 and TP 484 with a capacity of 160 kVA each. Technological accounting of the electricity consumed by the hydroelectric power station in the village of Gavrilivka is carried out by electricity meters NIK 2303 ARTT 1140 with current transformers 600/5, which are installed in the fiberglass shield of the pumping station. The fiberglass shield is installed near the KTP-10/0.4 kV, which is located on the territory of the existing hydroelectric power station in the village of Gavrilivka. Electric lighting is designed for 220 V, portable - powered by batteries. Lighting is adopted in accordance with DBN V.2.5-28:2018 "Natural and artificial lighting". Luminaires with LED lamps are adopted as light sources. Hydroelectric power plant in the village of Gavrylivka: pumping station of the 2nd lift (construction); engineering networks (construction); receiving tank 96 m³ (construction). Hydroelectric power plant in the village of Blystavytsa: pumping station of the 2nd lift, pos. 1 according to the general plan (construction); engineering networks (construction); receiving tank 96 m³ (construction). Ringing of clean water tanks on Volodymyra Kovalskyi St., Bucha, and hydroelectric power plant on Lesya Ukrainka St., building 28/1a in the village of Vorzel. The project provides for a bridge on the New Main from the previously designed water supply structure on Lesya Ukrainka Street in the village of Vorzel to the existing water supply structure DN315 (at the intersection of Bohdan Khmelnytsky Boulevard and Nove Shose Street in Bucha), which is laid from the existing water supply structure on Volodymyr Kovalsky Street in Bucha. The designed water supply structures are planned taking into account existing consumers and prospective connections, based on a throughput of 6,000 m3/day. It is also planned to install wells with fire hydrants on the designed water supply structure. This project also provides for the ringing of the designed water supply structure DN315 with the existing water supply structure DN250, which is laid along Borys Gmyra Street in Bucha, by installing a DN250 bridge. The designed water supply structures are planned taking into account existing consumers and prospective connections. It is also planned to install wells with fire hydrants on the designed water supply system. Groundwater intake from six artesian wells. It is planned to build six water intake wells for the exploitation of the aquifer complex (Cenomanian-Callovian) in the deposits of the Ivanytsia suite of the Middle and Upper Jurassic and the Zagoriv, ​​Zhurav, Burom suites of the Lower and Upper Cretaceous, with a productivity of 40.0 m3/h (960 m3/day). To ensure the operation of the well and the location of technological and electrical equipment above the well, it is planned to build a pumping station of the 1st underground lifting type, with a diameter of 2 m, made of reinforced concrete rings in accordance with TP 901-2-178.91. Structurally, the pumping station above the well is made of unified reinforced concrete elements. The internal diameter of the pumping station is 2.0 m, the height of the working part is 2.1 m. The foundation is a monolithic concrete block, on which the sealed wellhead rests with a column of water-lifting pipes suspended from it. The pumping station has natural ventilation. The foundation is a monolithic concrete block, on which the sealed wellhead rests with a column of water-lifting pipes suspended from it. The pumping station has natural ventilation. The foundation is a monolithic concrete block, on which the sealed wellhead rests with a column of water-lifting pipes suspended from it. The pumping station has natural ventilation.

Socio-economic context

Indicator

Value

Number of people who will use the service

73000 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Water supply and sanitation

Stream

Restoration, development and modernization of centralized water supply and wastewater infrastructure, including the introduction of alternative energy sources

Strategic document

Task

A.2.3.3. Improving the accessibility of centralized wastewater for the community population

Project objectives

Indicator
Base value
Target value

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
53000 human
Annual demand for services/infrastructure
2
73000 human
Economic justification

Alternative technical solutions

Technical Solution 1

A comprehensive infrastructure project to develop and modernize the community's water supply system

Technical Solution 2

Reconstruction and modernization of existing local water supply systems in each settlement

Total costs407'517'066 UAH481'077'184 UAH
  • For preparation
  • 1'599'084 UAH169'000'000 UAH
  • For implementation
  • 273'660'124 UAH293'660'124 UAH
  • For operation
  • 131'257'858 UAH17'417'060 UAH
  • For closing
  • 1'000'000 UAH1'000'000 UAH
    Average annual costs20'375'853 UAH24'053'859 UAH
    Project duration, incl.21 months15 months
  • Deadline for developing a FFS
  • 3 months3 months
  • Implementation period
  • 18 months12 months
    Service life240 months240 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Financial justification

    Total project budget

    Total preliminary budget407'517'066 UAH481'077'184 UAH
    Capital costs407'517'066 UAH481'077'184 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation1'599'084 UAH169'000'000 UAH
    For implementation273'660'124 UAH293'660'124 UAH
    For operation131'257'858 UAH17'417'060 UAH
    For closing1'000'000 UAH1'000'000 UAH

    Average project cost per service recipient

    Service UnitСередня вартість проєкту на одного отримувача послуги
    Service Unit Cost5'582 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo
    Management Rationale

    Risk assessment

    Financial riskDefinedUndefined
    Economic riskDefinedUndefined
    Environmental riskDefinedUndefined