Buchanska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
28
Projects
Projects by sectors
28
Projects
Projects by goal
28
Projects
Projects by status
5'104,03 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorPreschool education
StatusPreliminary Investment Feasibility Study

New construction of a protective civil defense structure - anti-radiation shelter on the territory of the Municipal Institution "Blystavytsia Preschool Education Institution of Combined Type No. 8 "Zolota Rybka" of the Buchanan City Council of the Kyiv Region at the address: Kyiv Region, Buchanan District, Blystavytsia Village, Soborna St., 29

Project goal
Increasing compliance with modern standards. Improving the quality of services
Geography
Kyivska region
Initiator
EDUCATION DEPARTMENT OF BUCHANAN CITY COUNCIL
New construction of a protective civil defense structure - anti-radiation shelter on the territory of the Municipal Institution "Blystavytsia Preschool Education Institution of Combined Type No. 8 "Zolota Rybka" of the Buchanan City Council of the Kyiv Region at the address: Kyiv Region, Buchanan District, Blystavytsia Village, Soborna St., 29
Major repairs of the civil defense building of the Civil Defense Center "Blystavytsia Preschool Education Institution of Combined Type No. 8 "Zolota Rybka" of the Buchanan City Council of the Kyiv Region at the address: Kyiv Region, Buchanan District, Blystavytsia Village, Soborna St., 29
The project provides for the construction of a new civil defense protective structure - anti-radiation shelter (PRU) on the territory of the Municipal Institution "Blystavytsia Preschool Education Institution of Combined Type No. 8 "Zolota Rybka" of the Buchanan City Council of the Kyiv Region at the address: Kyiv Region, Buchanansky District, Blystavytsia Village, Soborna St., 29. The implementation of the project is due to the need to ensure the safety of life and health of preschool children and employees of the institution in martial law, as well as to create conditions for the continuous functioning of the preschool educational institution with the possibility of full-time attendance. The design solution provides for: construction of a separately located or built-in (depending on the design documentation) protective structure designed to shelter all pupils and staff of the institution; ensuring that the shelter complies with the requirements of civil defense, DBN, sanitary and fire safety standards; arrangement of ventilation, emergency and main lighting, water supply and drainage systems; creation of conditions for a long stay of children, taking into account the age characteristics of preschoolers; equipping the shelter with basic means to continue the educational process while staying in the protective structure; ensuring accessibility for low-mobility groups of the population, including children with special educational needs; improvement of the surrounding area and safe evacuation routes to the shelter. The implementation of the project will allow: to guarantee an adequate level of protection for preschool children; to create conditions for the full-time functioning of the preschool educational institution even in the presence of security threats; to increase the level of community preparedness for emergencies and strengthen the civil protection system at the local level.
Budget68'818'659,34 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Technical re-equipment of primary electrical connections of substation No. 133, Bucha, 9-P Instytutska

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards
Geography
Bucha city
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
Technical re-equipment of primary electrical connections of substation No. 133, Bucha, 9-P Instytutska
Construction of a new transformer substation
Budget8'881'000 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Technical re-equipment of primary electrical connections of substation No. 71, Bucha, Yablunska 15-V

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards
Geography
Bucha city
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
Technical re-equipment of primary electrical connections of substation No. 71, Bucha, Yablunska 15-V
Construction of a new transformer substation
Budget10'132'007 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Technical re-equipment of primary electrical connections of substation No. 174, Bucha, Sklozavodskaya 6-B

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards
Geography
Bucha city
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
Technical re-equipment of primary electrical connections of substation No. 174, Bucha, Sklozavodskaya 6-B
Construction of a new transformer substation
Budget11'219'297 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Technical re-equipment of primary electrical connections TP-32, Bucha, Kievo-Myrotska 135-B

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards
Geography
Bucha city
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
Technical re-equipment of primary electrical connections TP-32, Bucha, Kievo-Myrotska 135-B
Construction of a new transformer substation
Budget10'081'000 UAH
Implementation period75 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform

Project goal
Increasing compliance with modern standards. Improving the quality of services
Geography
Buchanska community
Initiator
EDUCATION DEPARTMENT OF BUCHANAN CITY COUNCIL
Creating a modern educational environment; providing educational institutions with modern furniture, educational equipment and teaching materials; equipping classrooms with multimedia equipment; creating a safe, inclusive and developmental educational environment; ensuring access to quality education for all students.
Creating a modern educational environment; providing educational institutions with modular and mobile furniture; using digital educational platforms instead of some printed didactics; interactive panels; mobile STEM stations
Ensuring the formation of a modern educational space by equipping educational institutions with new furniture, educational equipment and didactic materials. Equipping classrooms with multimedia equipment. Creating a safe, inclusive and development-friendly educational environment. Guaranteeing equal access for all students to quality education.
Budget3'763'113 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date11. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusPreliminary Investment Feasibility Study

New construction of the water supply network Havrylivka-Lubyanka-Blystavytsia-Bucha-Vorzel in the territory of the Bucha territorial community of Kyiv region

Project goal
Improving the equality of wealth distribution. Meeting demand
Geography
Buchanska community
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
A comprehensive infrastructure project to develop and modernize the community's water supply system
Reconstruction and modernization of existing local water supply systems in each settlement
It provides for the construction of a new centralized water supply network for all settlements of the community, the creation of a unified system of pumping stations, water tanks and water quality control, the use of modern technologies for water supply management and cost monitoring.
Budget407'517'066 UAH
Implementation period21 months
Local level of SPP
Local level of SP
Date11. 2025
SectorHousing
SubsectorHousing Reconstruction
StatusInvestment Feasibility Study

New Construction of Municipal (Social) Rental Housing Buildings in Blystavitsa Village, Bucha District, Kyiv Region

Project goal
Creation of new facilities and services. Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities
Geography
Buchanska community, Blystavytsia village
Initiator
BUCHANA CITY COUNCIL
New construction of residential buildings of the municipal (social) rental housing fund in the village of Blystavytsia, Buchansky district, Kyiv region
Construction of manor-type houses
Reconstruction and extension of existing buildings for municipal (social) rental housing
The alternative solution involves the new construction of multi-apartment residential buildings of municipal (social) rental housing in the village of Blystavytsa, Buchanan urban community. The solution includes the construction of a residential complex with 128 apartments with appropriate engineering infrastructure, landscaping, parking spaces, recreation areas, ensuring barrier-free access and energy efficiency. The main goal is to provide housing for internally displaced persons, socially vulnerable categories and community residents who need affordable rental housing.
Budget261'503'588 UAH
Implementation period48 months
Local level of SPP
Local level of SP
Date11. 2025
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Barrier-free routes of the Buchanan urban territorial community

Project goal
Ensuring inclusiveness and equal opportunities. Improving the equality of wealth distribution, Improving the condition of infrastructure
Geography
Buchanska community, Bucha city
Initiator
BUCHANA CITY COUNCIL
Barrier-free routes of the Buchanan urban territorial community
Using alternative materials
Partial infrastructure update
Implementation of barrier-free routes with a total length of 930 m to ensure accessibility of pedestrian infrastructure for all categories of the population, including persons with disabilities and groups with reduced mobility. The project involves the complete reconstruction and adaptation of sidewalks, pedestrian zones and approaches to public facilities in accordance with the provisions of the pilot project "Traffic without barriers" and PKMU No. 870 dated 15.07.2025.
Budget242'700'001 UAH
Implementation period24 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a solar power plant on the roof of the Buchanan City Council building

Project goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards
Geography
Bucha city
Initiator
BUCHANA CITY COUNCIL
Installation of a solar power plant on the roof of the Buchanan City Council building (using a hybrid inverter)
Installation of a solar power plant on the roof of the Buchanan City Council building (without using a hybrid inverter)
A distinctive feature of this option is the use of a hybrid inverter, which will allow both to compensate for its own consumption of electrical energy and to accumulate excess generated electricity in batteries.The storage system can be selected in accordance with the specified load and backup time. According to the results of the engineering survey, the first floor distribution board, to which the ASC consumers, servers, etc. are connected, was determined as such a load. The estimated power of this board is 10 kW.This feasibility study considers the installation of a 40.8 kWh BOS-GM5.1*8 storage system, which consists of 8 battery blocks.The system under consideration was selected to provide 10 kW of uninterrupted power supply to the 1st floor distribution board for 4 hours.
Budget2'550'511,9 UAH
Implementation period8 months

In focus

All news