New construction of a rooftop solar power plant with a capacity of 120 kW at the address: Lviv region, Zolochiv city, Konovaltsya Ye. st., 48


Sector
Healthcare
Stream
Ensuring access to quality medical care through the development and modernization of medical infrastructure facilities
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves the construction of a new rooftop solar power plant with a capacity of 120 kW at the address: Lviv region, Zolochiv city, Konovaltsya Ye. st., 48, with the aim of increasing energy efficiency, reducing electricity costs and using renewable energy sources. The implementation of the project will ensure a stable and environmentally friendly electricity supply, contribute to the reduction of greenhouse gas emissions, improve the environmental situation in the region and increase the energy independence of the facility.

The purpose of the project

Main goal:

Introducing innovations and energy-efficient solutions

Secondary goal:

Improving the quality of services

Description of the purpose of the project and ways to achieve it

The project aims to provide the facility with a stable and environmentally friendly source of electricity by reducing dependence on traditional energy resources and optimizing consumption costs. This goal is planned to be achieved through the installation of a 120 kW rooftop solar power plant, which will convert solar energy into electricity using modern photovoltaic modules, inverters and monitoring systems, which will allow for effective control and regulation of electricity production and consumption.

Problems and solutions resulting from project implementation

The main problems are the high costs of traditional electricity, dependence on tariff fluctuations and significant negative impact on the environment due to the use of non-renewable energy sources. The implementation of the 120 kW rooftop solar power plant project will solve these problems by replacing part of the consumed energy with its own generation from renewable sources, reducing the financial burden on the facility's maintenance and minimizing greenhouse gas emissions. As a result, energy independence, cost savings and improvement of the environmental situation in the region will be achieved.

Socio-economic context

Indicator

Value

Capacity

120 kWh

Strategic Case

Strategic feasibility of the project

Sector

Healthcare

Subsector

Primary healthcare

Stream

Ensuring access to quality medical care through the development and modernization of medical infrastructure facilities

Strategic document

Регіональна стратегія розвитку

Task

2.2.2 High-quality and affordable medical services

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Використання статистичних даних, аналіз тенденцій ринку, врахування енергоспоживання об’єкта
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
26
120 kWh
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic_analysis_of_the_Zoločiv_solar_power_plant.docx
20.10.2025
21:09:59 UTC

Alternative technical solutions

Technical Solution 1

New construction of a rooftop solar power plant with a capacity of 120 kW at the address: Lviv region, Zolochiv city, Konovaltsya Ye. st., 48

Technical Solution 2

Using traditional electricity supply from centralized networks without installing a solar power plant

Total costs4'300'000 UAH0 UAH
  • For preparation
  • 45'000 UAH0 UAH
  • For implementation
  • 4'180'000 UAH0 UAH
  • For operation
  • 35'000 UAH0 UAH
  • For closing
  • 40'000 UAH0 UAH
    Average annual costs150'000 UAH650'000 UAH
    Project duration, incl.5 months2 months
  • Deadline for developing a FFS
  • 2 months1 month
  • Implementation period
  • 3 months1 month
    Service life300 months12 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, both national and international

    [Response was provided in the Preliminary Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget4'300'000 UAH0 UAH
    Capital costs4'300'000 UAH0 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation45'000 UAH0 UAH
    For implementation4'180'000 UAH0 UAH
    For operation35'000 UAH0 UAH
    For closing40'000 UAH0 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Preliminary Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service Unit.
    Service Unit Cost0 UAH

    Profitability of the project

    Is the project expected to generate income?NoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    No, no assessment was conducted.

    [Response was provided in the Preliminary Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    None of the options are applicable

    Project Approval History

    DateDecision NumberPortfolioProject StatusDecisionReasons
    21/10/2025SP-L-211025-65DF5F71Community SPInvestment Feasibility StudyIncludeInclude in sector portfolio
    03/11/2025SPP-L-031125-0DD2785ECommunity SPPInvestment Feasibility StudyIncludeInclude in the EPP investments of the Zolochiv urban territorial community