898,89 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

"Overhaul of the water supply system from the water intake "Zolochiv" to Sichovyh Striltsiv Street in the city of Zolochiv, Zolochiv district, Lviv region"

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Zolochiv city
Initiator
Zolochiv City Council, Zolochiv District, Lviv Region
Repair of the water supply line from the water intake "Zolochiv" to Sichovykh Striltsiv Street in the town of Zolochiv, Zolochiv district, Lviv region
Modernization of the water supply system from the water intake "Zolochiv" to Sichovykh Striltsiv Street in the town of Zolochiv, Zolochiv district, Lviv region
The water intake "Zolochiv" is located in the southeastern part of the city of Zolochiv in the valley of a small stream of the left tributary of the Zolochivka River. Today, this water intake is represented by four wells, two of which are operational No. 9633/1 and No. 10822/3 with a depth of 70m and 80m, respectively. The wells exploit an aquifer complex in the Upper Cretaceous deposits. The Zolochiv City Council has allocated two land plots with an area of 2.32 hectares and 0.6966 hectares for the water intake site. The design capacity is 4.8 thousand m/day; equipped with deep pumps WILO 200/70, 55 kW, - 2 pcs. The length of the water supply networks of the city of Zolochiv - 78.3 km. Average service life 45 years. Depreciated - 46 km., dilapidated - 29.35 km., diameter from 20 mm to 200 mm., including the length of water mains - 4.3 km. Depreciated and dilapidated - 1.2 km.; diameter from 150 mm. to 400 mm.
Budget11'759'204 UAH
Implementation period14 months
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction of networks and structures (for servicing existing treatment facilities) on a land plot with cadastral number 4621888500:12:000:0330 near the town of Zolochiv, Zolochiv district, Lviv region

Project goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards
Geography
Zolochiv city
Initiator
CITY MUNICIPAL ENTERPRISE "ZOLOCHIVVODOKANAL"
New construction of networks and structures (for servicing existing treatment facilities) on a land plot with cadastral number 4621888500:12:000:0330 near the town of Zolochiv, Zolochiv district, Lviv region
New construction of networks and structures (for servicing existing treatment facilities) on a land plot with cadastral number 4621888500:12:000:0330 near the town of Zolochiv, Zolochiv district, Lviv region, without a battery
New construction of a solar power plant on existing wastewater treatment plants with a battery
Budget5'322'850,02 UAH
Implementation period15 months
Local level of SPP
Local level of SP
Date10. 2025
SectorSocial sector
SubsectorSocial support
StatusInvestment Feasibility Study

Providing housing for orphans, children deprived of parental care, and persons from among them

Project goal
Reducing territorial or social gaps.
Geography
Zolochivska community
Initiator
Children's Service of the Zolochiv City Council, Zolochiv District, Lviv Region
Providing housing for orphans, children deprived of parental care, and persons from among them
The implementation of the program's tasks is ensured when using budget funds
Providing housing for orphans, children deprived of parental care, and persons from among them
Budget5'907'300 UAH
Implementation period48624 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorPrimary healthcare
StatusInvestment Feasibility Study

Major renovation of the premises on the 2nd floor of the municipal pharmacy of the Zolochivska Central Regional Health Center at the address: 9 Shashkevycha St., Zolochiv, Lviv region.

Project goal
Meeting demand. Capacity building, Creation of new facilities and services, Improving the equality of wealth distribution, Improving the condition of infrastructure
Geography
Zolochiv city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "ZOLOCHIV CENTRAL DISTRICT HOSPITAL" OF THE ZOLOCHIV CITY COUNCIL OF THE ZOLOCHIV DISTRICT OF Lviv REGION
Major renovation of the premises on the 2nd floor of the municipal pharmacy of the Zolochivska Central Regional Health Center at the address: 9 Shashkevycha St., Zolochiv, Lviv region.
Relocation of the pharmacy unit to another existing hospital building or to rented commercial space
The technical solution involves a comprehensive overhaul of the premises on the second floor of the municipal pharmacy of the Zolochivska Central Hospital with the modernization of engineering networks, replacement of windows and doors, insulation, interior decoration, and the provision of barrier-free access in accordance with modern sanitary and technical and building standards.
Budget1'295'626 UAH
Implementation period10 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorPrimary healthcare
StatusInvestment Feasibility Study

Major renovation of the pathology department of the Zolochiv Central Regional Hospital with the installation of facade insulation at the address: 48 Konovaltsya Ye. St., Zolochiv, Lviv region.

Project goal
Increasing compliance with modern standards.
Geography
Zolochiv city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "ZOLOCHIV CENTRAL DISTRICT HOSPITAL" OF THE ZOLOCHIV CITY COUNCIL OF THE ZOLOCHIV DISTRICT OF Lviv REGION
Major renovation of the pathology department of the Zolochiv Central Regional Hospital with the installation of facade insulation at the address: 48 Konovaltsya Ye. St., Zolochiv, Lviv region.
partial modernization of individual premises and engineering systems
The technical solution involves major repairs of the pathology department of the Zolochivska Central Clinical Hospital with a comprehensive renovation of the interior, including the floor, walls and ceilings, replacement and modernization of engineering networks (heating, water supply, electricity supply, ventilation and air conditioning), as well as the installation of facade insulation to increase the energy efficiency of the building. The repairs involve adapting the premises to modern sanitary and technical and safety standards, improving the working conditions of the staff and ensuring comfortable and safe conditions for patient care, taking into account the principles of inclusivity and accessibility for low-mobility groups.
Budget1'500'000 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorPrimary healthcare
StatusInvestment Feasibility Study

New construction of a rooftop solar power plant with a capacity of 120 kW at the address: Lviv region, Zolochiv city, Konovaltsya Ye. st., 48

Project goal
Introducing innovations and energy-efficient solutions. Improving the quality of services
Geography
Zolochiv city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "ZOLOCHIV CENTRAL DISTRICT HOSPITAL" OF THE ZOLOCHIV CITY COUNCIL OF THE ZOLOCHIV DISTRICT OF Lviv REGION
New construction of a rooftop solar power plant with a capacity of 120 kW at the address: Lviv region, Zolochiv city, Konovaltsya Ye. st., 48
Using traditional electricity supply from centralized networks without installing a solar power plant
The technical solution of the project involves the installation of a rooftop solar power plant with a capacity of 120 kW on the roofs of buildings at the following address: Lviv region, Zolochiv city, Konovaltsya Ye. st., 48, using modern photovoltaic modules placed on metal structures with an optimal angle of inclination for maximum capture of solar radiation. Electrical energy from the panels will be supplied to inverters, which will provide conversion of direct current into alternating current and synchronization with the consumer's internal network. The system will be equipped with protective and monitoring automation, which will allow controlling the output, efficiency and safety of the station.
Budget4'300'000 UAH
Implementation period5 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorPrimary healthcare
StatusInvestment Feasibility Study

Major repairs with the installation of a lightning protection system for the main building of the Zolochiv Central Regional State Enterprise at 48 Konovaltsya Ye. St., Zolochiv, Lviv region

Project goal
Improving the condition of infrastructure. Capacity building
Geography
Zolochiv city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "ZOLOCHIV CENTRAL DISTRICT HOSPITAL" OF THE ZOLOCHIV CITY COUNCIL OF THE ZOLOCHIV DISTRICT OF Lviv REGION
Major repairs with the installation of a lightning protection system for the main building of the Zolochiv Central Regional State Enterprise at 48 Konovaltsya Ye. St., Zolochiv, Lviv region
Installation of a local passive lightning protection system only on critical parts of the building
The technical solution of the project involves major repairs with the installation of a modern lightning protection system for the main building of the KNP «Zolochivska TsRL» at the address: 48 Konovaltsya Ye. St., Zolochiv, Lviv region. The project provides for the installation of an external and internal lightning protection system, including lightning rods, current conductors and a grounding circuit, in accordance with the requirements of the State Standard of Ukraine and the State Technical Regulations of Ukraine. The proposed solution will ensure reliable discharge of electrical discharges into the ground, minimize the risks of damage to structures and equipment, and guarantee the safe operation of the hospital building.
Budget940'400 UAH
Implementation period7 months
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorPrimary healthcare
StatusInvestment Feasibility Study

Current repairs of the roof of the main building with the installation of fire protection in the Zolochivska Central Regional Emergency Hospital at 48 Konovaltsya Ye. Street in Zolochiv, Lviv region

Project goal
Improving the condition of infrastructure. Capacity building
Geography
Zolochiv city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "ZOLOCHIV CENTRAL DISTRICT HOSPITAL" OF THE ZOLOCHIV CITY COUNCIL OF THE ZOLOCHIV DISTRICT OF Lviv REGION
Current repairs of the roof of the main building with the installation of fire protection in the Zolochivska Central Regional Emergency Hospital at 48 Konovaltsya Ye. Street in Zolochiv, Lviv region
Complete roof covering using modern energy-efficient materials
The technical solution of the project involves carrying out current repairs to the roof of the main building of the Zolochivska Central Regional State Enterprise with partial replacement of damaged roofing elements and treatment of wooden structures with special fire-retardant agents. All work will be carried out in compliance with state building codes and fire safety standards, which will ensure the tightness, durability and fire resistance of the roof, as well as protection of internal premises from moisture and the negative impact of external factors.
Budget820'800 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date10. 2025
SectorHealthcare
SubsectorPrimary healthcare
StatusInvestment Feasibility Study

Reconstruction of the Main Building of the Zolochivska Central Regional Hospital by adding an emergency department and a rehabilitation department, with the demolition of the laundry and administrative buildings at 48 Konovaltsya Ye. St. in the city of Zolochiv, Zolochiv district, Lviv region

Project goal
Capacity building. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services, Meeting demand
Geography
Zolochiv city
Initiator
MUNICIPAL NON-COMMERCIAL ENTERPRISE "ZOLOCHIV CENTRAL DISTRICT HOSPITAL" OF THE ZOLOCHIV CITY COUNCIL OF THE ZOLOCHIV DISTRICT OF Lviv REGION
Reconstruction of the Main Building of the Zolochivska Central Regional Hospital by adding an emergency department and a rehabilitation department, with the demolition of the laundry and administrative buildings at 48 Konovaltsya Ye. St. in the city of Zolochiv, Zolochiv district, Lviv region
modernization and redevelopment of existing premises of the main building without demolition of auxiliary buildings
The technical solution of the project involves the reconstruction of the Main Building of the Zolochivska Central Hospital with the addition of modern functional blocks for the emergency department and the rehabilitation department, which will be designed in accordance with current building and medical standards. The project includes the dismantling of outdated and unusable structures of the laundry and administrative buildings, which will allow optimizing the area for new construction solutions. The extensions will be equipped with modern engineering networks, ventilation, heating, water supply and energy saving systems, which will ensure comfortable and safe conditions for patients and staff.
Budget206'441'926 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date10. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction of a ground-based solar power plant at the Pidgorodne water intake at 1-A Yaroslava Mudryho St. in the village of Pidgorodne, Zolochiv district, Lviv region

Project goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards
Geography
Zolochiv city
Initiator
CITY MUNICIPAL ENTERPRISE "ZOLOCHIVVODOKANAL"
New construction of a ground-based solar power plant at the Pidgorodne water intake at 1-A Yaroslava Mudryho St. in the village of Pidgorodne, Zolochiv district, Lviv region
New construction of a ground-based solar power plant at the Pidgorodne water intake at 1-A Yaroslava Mudryho str. in the village of Pidgorodne, Zolochiv district, Lviv region, with a battery
installation of a solar power plant consisting of solar modules made of monocrystalline elements (207 pcs.), which are mounted on a mounting system for ground-based solar power plants, and a 100kW inverter
Budget3'668'199,02 UAH
Implementation period16 months