Current repairs of the roof of the main building with the installation of fire protection in the Zolochivska Central Regional Emergency Hospital at 48 Konovaltsya Ye. Street in Zolochiv, Lviv region


Sector
Healthcare
Stream
Ensuring access to quality medical care through the development and modernization of medical infrastructure facilities
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

The project involves carrying out ongoing repairs to the roof of the main building of the Zolochiv Central District Hospital at the address: Zolochiv, Konovaltsya Ye. St., 48, with the implementation of a complex of works to restore the roofing and install a fire protection system. The project is aimed at ensuring the proper technical condition of the building, increasing the level of fire safety, and creating safe conditions for the stay of patients and hospital staff.

The purpose of the project

Main goal:

Improving the condition of infrastructure

Secondary goal:

Capacity building

Description of the purpose of the project and ways to achieve it

The goal of the project is to ensure safe and proper operating conditions for the main building of the Zolochiv Central District Hospital by carrying out ongoing roof repairs and installing a fire protection system, which will prevent further destruction of structures, increase the energy efficiency of the building, and ensure the facility's compliance with fire safety requirements.

Problems and solutions resulting from project implementation

The main problem is the lack of fire protection on the roof of the main hospital building. The implementation of the project will eliminate these shortcomings by repairing the roof, restoring waterproofing, and installing a fire protection system, which will ensure the durability of the structures, improve the energy efficiency of the building, and create safe conditions for the provision of medical services.

Socio-economic context

Indicator

Value

Population in the geographical area of influence of the project

50000 human

Strategic Case

Strategic feasibility of the project

Sector

Healthcare

Subsector

Primary healthcare

Stream

Ensuring access to quality medical care through the development and modernization of medical infrastructure facilities

Strategic document

Регіональна стратегія розвитку

Task

2.2.2 High-quality and affordable medical services

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Оцінка попиту здійснювалася на основі аналізу технічного стану будівлі, потреб закладу охорони здоров’я у забезпеченні безпечних умов експлуатації та нормативних вимог щодо пожежної безпеки. Також враховано результати внутрішнього моніторингу стану покрівлі та обсяги звернень щодо необхідності ремонтних робіт.
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
26
100 %
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic_analysis_of_the_project_current_roof_repair_Zolochivska_CRL.docx
20.10.2025
18:23:47 UTC

Alternative technical solutions

Technical Solution 1

Current repairs of the roof of the main building with the installation of fire protection in the Zolochivska Central Regional Emergency Hospital at 48 Konovaltsya Ye. Street in Zolochiv, Lviv region

Technical Solution 2

Complete roof covering using modern energy-efficient materials

Total costs820'800 UAH695'000 UAH
  • For preparation
  • 14'000 UAH10'000 UAH
  • For implementation
  • 791'800 UAH670'000 UAH
  • For operation
  • 10'000 UAH10'000 UAH
  • For closing
  • 5'000 UAH5'000 UAH
    Average annual costs50'000 UAH35'000 UAH
    Project duration, incl.8 months9 months
  • Deadline for developing a FFS
  • 3 months4 months
  • Implementation period
  • 5 months5 months
    Service life300 months240 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, only national

    [Response was provided in the Preliminary Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget820'800 UAH695'000 UAH
    Capital costs820'800 UAH695'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation14'000 UAH10'000 UAH
    For implementation791'800 UAH670'000 UAH
    For operation10'000 UAH10'000 UAH
    For closing5'000 UAH5'000 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Preliminary Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service Unit.
    Service Unit Cost0 UAH

    Profitability of the project

    Is the project expected to generate income?NoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    No, no assessment was conducted.

    [Response was provided in the Preliminary Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    None of the options are applicable

    Project Approval History

    DateDecision NumberPortfolioProject StatusDecisionReasons
    21/10/2025SP-L-211025-BF389350Community SPInvestment Feasibility StudyIncludeInclude in sector portfolio
    03/11/2025SPP-L-031125-508CC2B0Community SPPInvestment Feasibility StudyNot approvedZolochiv urban territorial community investments are not recommended in the EPP