Major repairs of the catering unit of Gymnasium No. 2 at the address: Odesa region, Bilhorod-Dnistrovskyi, Serhiy Faynblat St., 37. Correction
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
In order to create and improve proper conditions for organizing high-quality, safe and balanced nutrition in educational institutions, implement effective models and improve food safety conditions, restore and modernize the catering unit using the latest technological processes, improve energy efficiency indicators and comply with the principles of the Hazard Analysis and Critical Control Points (HACCP) system, the optimization and reconstruction of the catering unit of Gymnasium No. 2 in the city of Bilhorod-Dnistrovskyi, Odessa region, st. Serhiy Faynblat, 37. On the basis of the specified educational institution, the educational process of Gymnasium No. 6 of the city of Bilhorod-Dnistrovskyi, Odessa region, is also carried out in the second shift in a full-time format, thanks to the equipped civil defense structure (shelter), equipped with a distribution line and a dining hall, where the process of feeding students of Gymnasium No. 2 and Gymnasium No. 6 is carried out. Thus, nutrition is provided to students of two primary school institutions - at the expense of a state subvention in the amount of 351 children and a preferential contingent of senior classes (grades 5-11) - at the expense of the local budget, namely: orphans, children deprived of parental care (9 children), children from low-income families (3 children), children with special educational needs (11 children), children with disabilities (7 children), children of internally displaced persons (16 children), children from among the persons defined in Article 10 of the Law of Ukraine "On the status of war veterans, guarantees of their social protection", children one of whose parents died (missing), died while defending the independence and sovereignty of Ukraine (4 children). That is, the modernization and reconstruction of the catering unit of Gymnasium No. 2 will allow children to eat in a balanced way, improve their well-being, increase immunity, and strengthen physical and mental health. It should be noted that work is systematically being carried out among the parent community and students to popularize the culture of healthy eating by publishing information and educational information in local media and on social pages on the Internet.
The purpose of the project
Main Goal:
Increasing compliance with modern standards
Secondary Goal:
Increasing compliance with modern standards
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
800 human
Capacity
100 seats
Strategic Case
Strategic feasibility of the project
Sector
Education and science
Subsector
School education
Stream
Ensuring access to high-quality and safe food in three educational institutions by developing modern canteen infrastructure (food blocks)
Strategic document
Strategy for Reforming the School Nutrition System until 2027
Task
2.5 Affordable, comfortable, safe living, recreation and leisure environments
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Major repairs of the catering unit of Gymnasium No. 2 at the address: Odesa region, Bilhorod-Dnistrovskyi, Serhiy Faynblat St., 37. Correction
Technical Solution 2
Major repairs of the catering unit of Gymnasium No. 2 at the address: Odesa region, Bilhorod-Dnistrovskyi, Serhiy Faynblat St., 37. Corrections (2)
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]