"Overhaul of the cultural center in the village of Nadlymanske, Ovidiopol district, Odessa region, 151 B. Khmelnytskyi street (correction)"
- Preparation
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
General information
Description of the project
The project "Overhaul of the cultural center in the village of Nadlymanske, Ovidiopol district, Odessa region, at 151 B. Khmelnytskyi Street (correction)" is aimed at restoring the operational characteristics of the building and improving the surrounding area by carrying out a complex of repair and construction works. It is planned to overhaul the facades and interior spaces, insulate the external walls, replace window and door blocks, as well as partially redevelop with the arrangement of new functional areas, such as a vestibule, security room, control room and sanitary units, including a specialized bathroom for people with reduced mobility. The engineering component of the project includes the arrangement of a built-in boiler room, installation of modern fire protection systems, security alarm systems, video surveillance and lightning protection. As part of the improvement, it is planned to install a new fence, asphalt the driveways and parking areas, pave the walkways with paving slabs, and plant greenery in the area.
The purpose of the project
Main goal:
Increasing compliance with modern standards
Secondary goal:
Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Improving the quality of services, Reducing territorial or social gaps
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Population in the geographical area of influence of the project
1325 human
Strategic Case
Strategic feasibility of the project
Sector
Culture and information
Subsector
Cultural Services
Stream
Improving the conditions for providing basic cultural services by modernizing the material and technical base and bringing cultural institutions into proper condition
Strategic document
Task
3.1 Development of modern high-quality education in accordance with the concept of the New Ukrainian School
Project objectives
Alternative technical solutions
Technical Solution 1
Major renovation of the cultural center
Technical Solution 2
New construction of a modern Cultural Services Center (CSC) using energy-efficient modular technologies on the site of an existing building.
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]