Reconstruction of the boiler room at 36 V.Velykoho St. with the installation of a water heating boiler No. 4 KVGM-30 in Kherson


Sector
Municipal infrastructure and services
Stream
Reconstruction of the boiler room at 36 V.Velykoho St. with the installation of a water heating boiler No. 4 KVGM-30 in Kherson
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

The project involves the reconstruction of the boiler room, which includes the overhaul of the KVGM-30 boiler, the replacement of burners, which will ensure the stable operation of the boiler equipment.

The purpose of the project

Main goal:

Improving the condition of infrastructure

Secondary goal:

Improving the quality of services

Description of the purpose of the project and ways to achieve it

The implementation of the project will ensure stable and high-quality heat supply to social facilities and housing stock, reduce energy consumption and greenhouse gas emissions, and increase the level of comfort of the population.

Problems and solutions resulting from project implementation

In 2025, a KV 11.63 ENERGETIC boiler was purchased and delivered with USAID funds (burners were not included in the delivery set), which must be installed in the boiler house, which is located at 36 Volodymyra Velykogo Street. In order to ensure the stable operation of the boiler house, it is necessary to purchase a burner. The implementation of this project will lead to savings in natural gas consumption by 40%, electricity by 35% and ensure stable operation of the heat supply system. The specified boiler house provides heat supply services to 59 multi-apartment residential buildings (6979 subscribers) and 13 objects of the social and budgetary sphere of the Tavriysky microdistrict.

Socio-economic context

Indicator

Value

Number of people who will use the service

7 thous. people

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

District Heating

Stream

Reconstruction of the boiler room at 36 V.Velykoho St. with the installation of a water heating boiler No. 4 KVGM-30 in Kherson

Strategic document

State Strategy for Regional Development for 2021–2027

Task

11 Modernization, adaptability and decarbonization of district heating systems

Project objectives

Indicator
Base value
Target value

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
25
14 thous. people
Economic justification

Alternative technical solutions

Technical Solution 1

Reconstruction of the boiler room at 36 V.Velykoho St. with the installation of a water heating boiler No. 4 KVGM-30 in Kherson

Technical Solution 2

Construction of a new boiler house at 36 V.Velykoho St.

Total costs22'200'000 UAH73'374'869 UAH
  • For implementation
  • 22'200'000 UAH73'374'869 UAH
    Average annual costs1'000'000 UAH105'000'000 UAH
    Project duration, incl.10 months18 months
  • Deadline for developing a FFS
  • 2 months6 months
  • Implementation period
  • 8 months12 months
    Service life180 months300 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active
    Rejected
    Components of a technical solution
    To components
    1
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget22'200'000 UAH73'374'869 UAH
    Capital costs22'200'000 UAH73'374'869 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation0 UAH0 UAH
    For implementation22'200'000 UAH73'374'869 UAH
    For operation0 UAH0 UAH
    For closing0 UAH0 UAH

    Average project cost per service recipient

    Service UnitНа одного жителя, який користується послугами
    Service Unit Cost1'586 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseYesNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds22'200'000 UAH0 UAH
    Expected Funds22'200'000 UAH0 UAH
    Management Rationale

    Risk assessment

    Technical riskDefinedUndefined
    Economic riskDefinedUndefined
    Operational riskDefinedUndefined
    Results of the feasibility analysis
    Economic Analysis
    Social benefits and costs
    The benefits include - noise and dust during installation work, possible temporary restrictions on traffic near the facility during the delivery of large-sized equipment (boiler). The new equipment allows you to more accurately adjust the temperature schedule according to weather conditions, which increases the comfort of living. Costs -
    Environmental benefits and costs
    The benefit is that the installation of a new burner device and automation system allows optimizing the fuel combustion process. This leads to a significant reduction in carbon dioxide emissions. The cost is the operation of special equipment, welding work and possible dust generation during the reconstruction of the boiler room, which create a temporary local air pollution.
    Indirect benefits and costs
    z Benefits - reduced load on electricity networks, extended service life of heating networks. Costs - wear and tear of roads during construction, withdrawal of capital from other sectors