Description of the project
The project envisages the creation of safe conditions for the population by constructing a protective civil protection structure (radiation shelter). The existing basement in the building cannot serve as a protective structure. & Construction of a one-story protective structure for civil defense (anti-radiation shelter – «underground school») with a total area of 1316.5.1 sq. m. in which conditions will be created for the temporary stay of children and teachers of the school in the event of a danger to their life and health as a result of emergency situations. The protective structure will be provided with appropriate conditions for ensuring access and stay of disabled people. The spatial planning and constructive solutions, special and other engineering equipment, systems and life support means of the protective structure will comply with building codes and regulatory legal acts, and will provide a barrier-free adapted environment for children with special educational needs. The walls and floor of the structure and combined coverings bordering the ground will be insulated. Heating will be provided by wall-mounted electric converters. The shelter building will be equipped with supply and exhaust systems with recuperators. The bathrooms will have exhaust ventilation with mechanical drive with automatic regulation, air conditioning from split systems. Provision of the protective structure with special and other engineering equipment, systems and means of life support. Furnishing with furniture and inventory the premises of the underground school», namely: classrooms, sanitary rooms, a medical station, a cafeteria, a staff room, additional rooms that will ensure the operation of the shelter (rooms for containers for placing food products and containers with drinking water, and external tanks for sewage, food, etc.). The anti-radiation shelter will be equipped and equipped with the necessary equipment, furniture and inventory. For the implementation of the project, design and estimate documentation was developed and a positive expert report ЭХ01:2501-5877-4773-4987 was received. In 2024, design and estimate documentation was developed. & It is planned to complete the construction of the "underground school", with a design capacity of 450 places, in May 2028. The construction of such a structure will allow Kherson participants in the educational process to switch to a full-time/blended form of education. Nearby is a children's and youth sports school, which will also be able to use the protective structure of civil defense. The "Underground School", in peacetime, will be used for extracurricular activities, sports clubs, a military – patriotic club, and a center for psychological support for participants in the educational process.
The purpose of the project
Main goal:
Creation of new facilities and services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
450 human
Other functional
1 units
Strategic Case
Strategic feasibility of the project
Sector
Education and science
Subsector
School education
Stream
Arrangement of civil defense protective structures (shelters) in secondary education institutions.
Strategic document
State Strategy for Regional Development for 2021–2027
Task
Strategic goal 2 operational goal 1 task 21 Promoting the increase in the stock of civil defense protective structures, taking into account the principles of inclusiveness and accessibility
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
New construction of the PRU for ZZSO No. 44
Technical Solution 2
Alternative technical solutions for the construction of a new modular shelter for 292 people on the territory of the secondary school of grades I-III No. 44 of the Kherson City Council at the address: Kherson, Akademika Tarle St., 10
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Preliminary cost breakdown
Average project cost per service recipient
Profitability of the project
Is the project expected to generate income?
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]