Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Replacement of pumping and power equipment of sewage pumping stations No. 4, No. 6 and the Main sewage pumping station in Kherson

Project Goal
Improving the quality of services. Introducing innovations and energy-efficient solutions
Geography
Kherson city
Initiator
Department of Municipal Economy of the Kherson City Council
Maturity level
91
Replacement of pumping and power equipment of sewage pumping stations No. 4, No. 6 and the Main sewage pumping station in Kherson
Overhaul of pumping and power equipment of sewage pumping stations No. 4, No. 6 and the Main Sewerage Pumping Station in Kherson
Replacement of pumping and power equipment at the sewage pumping stations with installation of control cabinets and automation of the operation of sewage pumping stations
Project cost27'624'190 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of power supply networks within the allocated land plots of drinking water wells in the city of Kherson and the village of Komyshany with the installation of solar power plants with a capacity of 30 kW each

Project Goal
Improving the quality of services. Contribution to climate or environmental goals, Introducing innovations and energy-efficient solutions
Geography
Khersonska community
Initiator
Department of Municipal Economy of the Kherson City Council
Maturity level
91
Reconstruction of power supply networks within the allocated land plots of drinking water wells in the city of Kherson with the installation of solar power plants with a capacity of 30 kW each
Reconstruction of power supply networks within the allocated land plots of drinking water wells in the city of Kherson with the installation of wind power plants with a capacity of 30 kW each
Development of a PKD and installation of solar power plants on land plots of drinking water wells in the city of Hekrsoni to ensure autonomous power supply.
Project cost11'400'000 UAH
Implementation period5 months
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major renovation of part of the basement to provide the simplest shelter for the Kherson Specialized School of I-III Degrees No. 54 with in-depth study of Spanish and other foreign languages of the Kherson City Council at the address: Kherson, Ludwik Zamenhof St., 6a.

Project Goal
Creation of new facilities and services.
Geography
Kherson city
Initiator
EDUCATION DEPARTMENT OF KHERSON CITY COUNCIL
Maturity level
91
Arrangement of the simplest shelter ZZSO 54
Modular shelter for ZZSO 54
Overhaul of part of the basement to arrange the simplest shelter. The number of protective structures will be increased to preserve the life and health of residents, safe conditions will be created for training in a full-time/mixed format. The shelter meets the requirements for technogenic and fire safety, engineering and technological measures for civil defense, energy conservation, inclusiveness, operational safety, etc. It consists of two parts: the first with an area of 305 sq. m for 200 people and the second with an area of 410 sq. m for 210 people
Project cost13'250'000 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Overhaul of water heating boiler No. 2 PTVM-50 of the boiler house at 95 I. Bohuna St. in the city of Kherson

Project Goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Kherson city
Initiator
Department of Municipal Economy of the Kherson City Council
Maturity level
91
Overhaul of water heating boiler No. 2 PTVM-50 of the boiler house at 95 I. Bohuna St. in the city of Kherson
Installation of a cascade of modular gas boiler rooms
The project provides for the restoration of the boiler's operational characteristics, increasing the reliability of heat supply to consumers during the heating season, ensuring trouble-free operation and saving fuel and energy resources.
Project cost3'058'260 UAH
Implementation period11 months
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusPreliminary Investment Feasibility Study

Reconstruction of heating networks of the boiler house at 95 I. Bohuna St. in the city of Kherson. Sections from the boiler house to TK-130; from TK-120 to TK-8-1; from TK-211 to TsTP-22; from TK-211 to TK-214; from TK-212/1 to TsTP-21

Project Goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Khersonska community
Initiator
Department of Municipal Economy of the Kherson City Council
Maturity level
87
Reconstruction of heating networks of the boiler house at 95 I. Bohuna St. in the city of Kherson. Sections from the boiler house to TK-130; from TK-120 to TK-8-1; from TK-211 to TsTP-22; from TK-211 to TK-214; from TK-212/1 to TsTP-21
Reconstruction of the boiler room at 95 I. Bohuna Street with the installation of modular boiler rooms
For 2026 - 2028, it is planned to carry out work on partial replacement of pipelines using heat-insulated pipes and pipe elements with a steel conductive pipe for heat supply with a heat-insulating layer of foamed polyurethane and a covering layer with a polyethylene shell. Renovation of the heat supply system improves energy efficiency, reduces operating costs and ensures reliable operation.
Project cost229'235'656 UAH
Implementation period33 months
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusPreliminary Investment Feasibility Study

Modernization of the district heating system in the city of Kherson (Korabel microdistrict)

Project Goal
Rebuilding the damaged/destroyed. Introducing innovations and energy-efficient solutions, Improving the quality of services
Geography
Kherson city
Initiator
Department of Municipal Economy of the Kherson City Council
Maturity level
87
Modernization of the district heating system in the city of Kherson (Korabel microdistrict)
Modernization of the district heating system in the city of Kherson (Korabel microdistrict)
The project provides for the reconstruction of the existing gas boiler house with the installation of two modern energy-efficient gas boilers with condensing economizers, with an installed capacity of 15 MW each. Construction of a heat pump station using modern high-efficiency heat pumps of the «water-water» type with a capacity of 3 MW with an average annual COP conversion coefficient of at least 4.0. In order to reduce the cost of electricity, it is planned to provide the HPP with electricity from a cogeneration gas piston plant. Replacement of auxiliary equipment, control and metering units of energy carriers with a high-tech system for the preparation, regulation, metering and supply of the coolant to consumers.
Project cost540'000'000 UAH
Implementation period37 months
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of heating networks of the boiler house at 17 Nebesnoi Sotni St. in the city of Kherson

Project Goal
Improving the condition of infrastructure. Rebuilding the damaged/destroyed, Improving the quality of services
Geography
Kherson city
Initiator
Department of Municipal Economy of the Kherson City Council
Maturity level
91
Reconstruction of heating networks of the boiler house at 17 Nebesnoi Sotni St. in the city of Kherson
Reconstruction of heating networks of the boiler house at 17 Nebesnoi Sotny St. in the city of Kherson with the installation of a block-modular boiler house
The project involves the reconstruction of heating networks from the boiler house at 17 Nebesnoi Sotny St., which includes the installation of pre-insulated pipes and new shut-off valves, which will ensure a stable supply of coolant to consumers. The modernization of the heating system is aimed at increasing the energy efficiency of municipal infrastructure, eliminating emergency situations in heating networks, reducing heat energy losses, and providing consumers with quality services.
Project cost41'435'663 UAH
Implementation period11 months
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of heating networks of the boiler house at Nebesnoi Sotny St., 3 in the city of Kherson

Project Goal
Improving the condition of infrastructure. Rebuilding the damaged/destroyed, Improving the quality of services
Geography
Kherson city
Initiator
Department of Municipal Economy of the Kherson City Council
Maturity level
91
Reconstruction of heating networks of the boiler house at Nebesnoi Sotny St., 3 in the city of Kherson
Reconstruction of heating networks of the boiler house at Nebesnoi Sotny St., 3 in the city of Kherson with the installation of a block-modular boiler house
The project involves the reconstruction of heating networks from the boiler house at 3 Nebesnoi Sotny St., which includes the installation of pre-insulated pipes and new shut-off valves, which will ensure a stable supply of coolant to consumers. The modernization of the heating system is aimed at increasing the energy efficiency of municipal infrastructure, eliminating emergency situations in heating networks, reducing heat energy losses, and providing consumers with quality services.
Project cost26'699'674 UAH
Implementation period11 months
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of heating networks of the boiler house at 3 Kupetska Street in the city of Kherson

Project Goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Kherson city
Initiator
Department of Municipal Economy of the Kherson City Council
Maturity level
91
Reconstruction of heating networks of the boiler house at 3 Kupetska Street in the city of Kherson
Reconstruction of heating networks of the boiler house at 3 Kupetska Street in the city of Kherson with the installation of a block-modular boiler house
The project involves the reconstruction of heating networks from the boiler house at 3 Kupetska Street, which includes the installation of pre-insulated pipes and new shut-off valves, which will ensure a stable supply of coolant to consumers.
Project cost18'873'303 UAH
Implementation period11 months
Local level of SPP
Local level of SP
Date01. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of the boiler room with the installation of a block-modular boiler room at 17 Ratushna Street in the city of Kherson

Project Goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards, Improving the quality of services
Geography
Kherson city
Initiator
Department of Municipal Economy of the Kherson City Council
Maturity level
91
Reconstruction of the boiler room with the installation of a block-modular boiler room at 17 Ratushna Street in the city of Kherson
Construction of a new boiler house at 17 Ratushna Street in the city of Kherson
The project involves the installation of a new modern block-modular boiler house at 17 Ratushna Street in the city of Kherson, which should operate in place of the existing boiler house with the same address.
Project cost18'109'750 UAH
Implementation period11 months