Khersonska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
34
Projects
Projects by sectors
34
Projects
Projects by goal
34
Projects
Projects by status
1'590,78 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Stream
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of the boiler room at 36 V.Velykoho St. with the installation of a water heating boiler No. 4 KVGM-30 in the city of Kherson

Project goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Khersonska community, Kherson city
Initiator
Department of Municipal Economy of the Kherson City Council
Reconstruction of the boiler room at 36 V.Velykoho St. with the installation of a water heating boiler No. 4 KVGM-30 in the city of Kherson
Construction of a new boiler house at 36 V.Velykoho St. with installation of water heating boiler No. 4 KVGM-30 in the city of Kherson
Reconstruction of the boiler room at 36 V.Velykoho St. with the installation of a water heating boiler No. 4 KVGM-30 in the city of Kherson with the installation of a new burner UBR45 (Unigas), mod. M-MD.S.UA.G.8.200.EG. This solution is aimed at increasing the reliability of heat supply to a large residential area and social infrastructure facilities of the city.
Budget22'200'000 UAH
Implementation period10 months
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Reconstruction of the TP on M. Kulisha St., 5 in the city of Kherson

Project goal
Introducing innovations and energy-efficient solutions. Rebuilding the damaged/destroyed, Improving the quality of services
Geography
Khersonska community
Initiator
Department of Municipal Economy of the Kherson City Council
Reconstruction of the TP on M. Kulisha St., 5 in the city of Kherson
Construction of a new TP at 5 Kulisha Street in the city of Kherson
The reconstruction of the heat point is technically feasible, economically justified and aimed at increasing the energy efficiency, reliability and environmental safety of the building's heat supply system, which will lead to a reduction in heat energy consumption by 20-30% due to the introduction of automatic weather-based regulation, elimination of excess coolant consumption and optimization of the hydraulic regime, reduction of coolant losses by 15-20% due to the replacement of worn pipelines, fittings and installation of modern sealing elements, reduction of electricity consumption for circulation pumps by 10-15% due to the use of energy-efficient pump units with frequency control, improvement of the uniformity of heat supply to consumers by up to 90-95% ensuring the regulatory temperature parameters
Budget6'500'000 UAH
Implementation period5 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

The new construction of a protective structure for civil protection (anti-radiation shelter) on the territory of the comprehensive school of grades I-III No. 41 of the Kherson City Council at the address: Kherson, str. Kashtanova, 30

Project goal
Creation of new facilities and services.
Geography
Khersonska community, Kherson city
Initiator
EDUCATION DEPARTMENT OF KHERSON CITY COUNCIL
New construction of the PRU for ZZSO 41
Modular shelter for ZZSO 41
The new construction of the PRU in ZZSO 41 is a building of dual significance: it will increase the number of protective structures to preserve the life and health of residents, and will provide safe conditions for training in a full-time/mixed format. This is a strong, reliable, durable structure that meets the requirements for technogenic and fire safety, engineering and technological measures for civil defense, energy conservation, inclusiveness, operational safety, etc. PRU for 450 places with a total area of 1298.17 sq. m
Budget63'848'436,3 UAH
Implementation period11 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorPreschool education
StatusPreliminary Investment Feasibility Study

Reconstruction of part of the basement of the Zelenivka Nursery School No. 47 building of the Kherson City Council for the construction of a civil defense facility with the properties of a PRU at the address: Kherson region, Kherson city territorial community, Zelenivka village, Bohdana Khmelnytskyi st., 5

Project goal
Creation of new facilities and services.
Geography
Khersonska community, Zelenivka town
Initiator
EDUCATION DEPARTMENT OF KHERSON CITY COUNCIL
Arrangement of PRU for ZDO 47 by reconstruction
Modular shelter for ZDO 47
Reconstruction of part of the basement to arrange a shelter for the ZDO. The number of protective structures will be increased to preserve the life and health of residents, safe conditions will be created for training in a full-time/mixed format. The shelter meets the requirements for technogenic and fire safety, engineering and technological measures for civil defense, energy conservation, inclusiveness, operational safety, etc. A shelter for 216 people with a total area of 893.70 sq. m (before reconstruction - 960.50 sq. m).
Budget68'289'860 UAH
Implementation period10 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusPreliminary Investment Feasibility Study

New construction of a protective civil defense structure (radiation shelter) on the territory of the Kherson educational complex "Preschool educational institution-specialized school with in-depth study of English of the 1st degree - gymnasium 56 of the Kherson City Council" at the address: Kherson, Kashtanova St., 10

Project goal
Creation of new facilities and services.
Geography
Khersonska community, Kherson city
Initiator
EDUCATION DEPARTMENT OF KHERSON CITY COUNCIL
New construction of the PRU in NVK 56
Modular shelter for NVK 56
The new construction of the PRU in the NVK is a building of dual significance: it will increase the number of protective structures to preserve the life and health of residents, and provide safe conditions for training in a full-time/mixed format. This is a strong, reliable, durable structure that meets the requirements for technogenic and fire safety, engineering and technological measures for civil defense, energy conservation, inclusiveness, operational safety, etc. PRU for 300 places with a total area of 1543.37 sq. m (total area of the main premises - 1088.08 sq. m)
Budget116'286'494 UAH
Implementation period11 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusPreliminary Investment Feasibility Study

New construction of a civil defense protective structure (radiation shelter) on the territory of secondary school No. 46 of the Kherson City Council at the address: Kherson, Freetown St., 82

Project goal
Creation of new facilities and services.
Geography
Khersonska community, Kherson city
Initiator
EDUCATION DEPARTMENT OF KHERSON CITY COUNCIL
New construction of the PRU for ZZSO 46
Modular shelter for ZZSO 46
The new construction of the PRU in ZZSO 46 is a building of dual significance: it will increase the number of protective structures to preserve the life and health of residents, and will provide safe conditions for training in a full-time/mixed format. This is a strong, reliable, durable structure that meets the requirements for technogenic and fire safety, engineering and technological measures for civil defense, energy conservation, inclusiveness, operational safety, etc. PRU for 450 places with a total area of 1309.70 sq. m
Budget103'295'332 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of a protective civil defense structure (radiation shelter) on the territory of the secondary school of grades I-III No. 44 of the Kherson City Council at the address: Kherson, Academician Tarle St., 10

Project goal
Creation of new facilities and services.
Geography
Khersonska community, Kherson city
Initiator
EDUCATION DEPARTMENT OF KHERSON CITY COUNCIL
New construction of the PRU for ZZSO No. 44
Alternative technical solutions for the construction of a new modular shelter for 292 people on the territory of the secondary school of grades I-III No. 44 of the Kherson City Council at the address: Kherson, Akademika Tarle St., 10
Construction of a shelter for 450 people. The spatial planning and design solutions, special and other engineering equipment, systems and life support facilities of the protective structure will comply with building codes and regulatory legal acts, and will provide a barrier-free adapted environment for children with special educational needs. The walls and floor of the structure and combined coverings bordering the ground will be insulated. Heating will be provided by wall-mounted electric converters. The shelter building will be equipped with supply and exhaust units with recuperators. The bathrooms will have exhaust ventilation with mechanical drive with automatic regulation, air conditioning from split systems. Provision of the protective structure with special and other engineering equipment, systems and life support facilities. Furnishing and equipping the premises of the "underground school", namely: classrooms, sanitary rooms, a medical station, a cafeteria, a staff room, additional rooms that will ensure the operation of the shelter (rooms for containers for placing food and drinking water containers, and external tanks for sewage, food, etc.)
Budget89'864'946 UAH
Implementation period11 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusPreliminary Investment Feasibility Study

Reconstruction of part of the basement of the building letter B for the construction of a protective structure for civil defense (anti-radiation shelter) of Kherson Lyceum No. 31 of the Kherson City Council at the address: Kherson, Nezalezhnosti Ave., 79 A

Project goal
Creation of new facilities and services.
Geography
Khersonska community, Kherson city
Initiator
EDUCATION DEPARTMENT OF KHERSON CITY COUNCIL
Arrangement of PRU for ZZSO 31 by reconstruction
Alternative technical solutions for the construction of a new modular shelter for 292 people on the territory of Kherson Lyceum No. 31 of the Kherson City Council at the address: Kherson, Nezalezhnosti Avenue, 79
The reconstruction of the basement will allow the creation of a PRU in ZZSO 31. This structure has a dual purpose: it will increase the number of protective structures to preserve the life and health of residents, and will provide safe conditions for training in a full-time/mixed format. This is a strong, reliable, durable structure that meets the requirements for technogenic and fire safety, engineering and technological measures for civil defense, energy conservation, inclusiveness, operational safety, etc. PRU for 292 places with a total area of 609.6 sq.m.
Budget53'713'136 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major renovation of part of the basement to provide the simplest shelter for the Kherson Tavriysky Lyceum of the Kherson City Council at the address: Kherson, Vyshneva St., 44

Project goal
Creation of new facilities and services.
Geography
Khersonska community, Kherson city
Initiator
EDUCATION DEPARTMENT OF KHERSON CITY COUNCIL
Arrangement of the simplest shelter for XTL
Modular shelter for XTL
Major renovation of part of the basement to arrange the simplest shelter for 200 people. The number of protective structures will be increased to preserve the life and health of residents, safe conditions will be created for training in a full-time/blended format. The shelter meets the requirements for technogenic and fire safety, engineering and technological measures for civil defense, energy conservation, inclusiveness, operational safety, etc.
Budget10'250'000 UAH
Implementation period5 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major renovation of part of the basement for the arrangement of the simplest shelter of Kherson Lyceum No. 27 of the Kherson City Council at the address: Kherson, Polkovnyka Kedrovskoho St. 8A

Project goal
Creation of new facilities and services.
Geography
Khersonska community, Kherson city
Initiator
EDUCATION DEPARTMENT OF KHERSON CITY COUNCIL
Arrangement of the simplest shelter ZZSO 27
Modular shelter for ZZSO 27
Major renovation of part of the basement to arrange the simplest shelter for 250 people. The number of protective structures will be increased to preserve the life and health of residents, safe conditions will be created for training in a full-time/blended format. The shelter meets the requirements for technogenic and fire safety, engineering and technological measures for civil defense, energy conservation, inclusiveness, operational safety, etc.
Budget12'250'000 UAH
Implementation period4 months

In focus

All news