Overhaul of the general ventilation system in the swimming pools (small and large, changing rooms, bathrooms and utility rooms), gymnastics hall, wrestling hall of the municipal enterprise "Palace of Sports "Yunist" at the address: Odesa region, Odessa district, Chornomorsk city, Myru avenue, 20
- Preparation
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
General information
Description of the project
Ventilation of the Sports Palace "Yunist" is supply and exhaust with mechanical and natural air movement. The total ventilation capacity is 58.3 kW. The ventilation equipment of the Sports Palace is outdated, the main duct system is in a state of emergency. All this can lead to the destruction of the building structures. The need for this project is due to the urgent elimination of the emergency state, in order to prevent the destruction of the structures of the Sports Palace building. Due to the unsatisfactory technical condition of the existing swimming pool ventilation systems, it is impossible to provide standardized temperature and humidity air parameters. High humidity accelerates the corrosion of steel structures and negatively affects the general technical condition of the building. As part of the first phase of the overhaul of the general ventilation system in the swimming pool premises (children's and adult changing rooms, bathrooms and utility rooms), the gymnasium, and the wrestling hall, it is planned to equip them with general ventilation units in accordance with the requirements of regulatory documents and calculations. The installation of the main equipment is planned in the technical premises of the building using existing openings. The system is planned with air recovery and reheating from external heating networks.
The purpose of the project
Main goal:
Improving the condition of infrastructure
Secondary goal:
Increasing compliance with modern standards, Increasing the even distribution of resources, Introducing innovations and energy-efficient solutions, Improving the quality of services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of IDP users
1000 human
Number of people who will use the service
4000 human
Number of employees of the institution/institution/organization
55 human
Number of users from low-mobility population groups
150 human
Number of jobs, including for IDPs
57 human
Capacity
500 human
Population in the geographical area of influence of the project
70781 human
Number of IDPs in the geographical area of impact of the project
7384 human
Strategic Case
Strategic feasibility of the project
Sector
Sports and physical activities
Subsector
Sports and physical activities
Stream
Development of sports infrastructure and improvement of conditions for physical education and sports
Strategic document
Стратегія розвитку територіальної громади
Task
3.4.2 Modernize and renovate the infrastructure of the community, sports and cultural institutions, and update their material and technical base.
Project objectives
Project Sustainable Development Goals
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Покращення умов для занять фізичною культурою та спортом
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Overhaul of the general ventilation system in the swimming pools (small and large, changing rooms, bathrooms and utility rooms), gymnastics hall, wrestling hall of the municipal enterprise "Palace of Sports "Yunist" at the address: Odesa region, Odessa district, Chornomorsk city, Myru avenue, 20
Technical Solution 2
Modernization/technical re-equipment of the general exchange ventilation system in the swimming pools (small and large, changing rooms, bathrooms and utility rooms), gymnastics hall, wrestling hall of the municipal enterprise "Palace of Sports "Yunist" at the address: Odesa region, Odessa district, Chornomorsk city, Myru ave., 20
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Investment Feasibility Study]
Об'явлено відкриті торги з особливостями у системі "Прозорро"
[Response was provided in the Investment Feasibility Study]
Без обмежень
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Preliminary cost breakdown
Average project cost per service recipient
Profitability of the project
Is the project expected to generate income?
Availability of services
[Response was provided in the Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Team competencies
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Виготовлення та експертиза ПКД, авторський та технічний нагляд
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
За потребою - залучення експертів з екології
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]