Chornomorska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
21
Projects
Projects by sectors
21
Projects
Projects by goal
21
Projects
Projects by status
361,68 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SP
Date04. 2026
SectorCulture and information
SubsectorCultural Services
StatusInvestment Feasibility Study

Creation of a multifunctional cultural hub in the village of Oleksandrivka

Project Goal
Improving the quality of services. Increasing compliance with modern standards, Developing new territories or functions, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions
Geography
Chornomorska community, Oleksandrivka town
Initiator
DEPARTMENT OF CULTURE OF THE CHORNOMORE CITY COUNCIL OF THE ODESSA DISTRICT OF THE ODESSA REGION
Reconstruction of part of the building (old wing) of the Oleksandrivskyi ZZSO with adaptation to a cultural services center
Reconstruction of the existing building of the Oleksandrivsky House of Culture
Partial renovation of the existing building of the cultural center without comprehensive modernization
Description of the solution It is planned to reconstruct part of the existing building of the educational institution (old wing) with functional transformation into a multifunctional cultural and educational space. The solution includes: combining premises to create an auditorium; arranging a stage and areas for club activities; creating a library space and a public area; modernizing engineering networks; ensuring barrier-free access; updating the material and technical base.
Project cost18'200'000 UAH
Implementation period42 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction (drilling) of artesian well No. 3 for water supply of the Chornomorsk urban territorial community at the address: Odesa region, Odessa district, Molodizhne village, Sanzhiyska doroha st., 3-B.

Project Goal
Improving the condition of infrastructure. Improving the equality of wealth distribution, Improving the quality of services
Geography
Chornomorska community
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
New construction (drilling) of an artesian well
Construction of a local seawater desalination plant
The project involves the creation of an autonomous source of water supply by constructing (drilling) an artesian well with a full range of necessary engineering infrastructure. As part of the project, it is planned to drill a well to the aquifer, equip a pumping chamber, install water lifting equipment, connect to the existing water supply system, and organize a sanitary protection zone. The proposed solution allows you to create a backup water supply independent of external sources, which will ensure continuous water supply to the population in the event of damage to the main pipeline or power outage of the water treatment plant. The implementation of the project will contribute to increasing the reliability of the water supply system, reducing critical dependence on external supply, and ensuring the sustainable functioning of the community in emergency situations.
Project cost2'532'299 UAH
Implementation period3 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction (drilling) of artesian well No. 2 for water supply of the Chornomorsk urban territorial community at the address: Odesa region, Odessa district, Molodizhne village, Sanzhiyska doroha st., 3-B.

Project Goal
Improving the condition of infrastructure. Improving the equality of wealth distribution, Improving the quality of services
Geography
Chornomorska community
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
New construction (drilling) of an artesian well
Construction of a local seawater desalination plant
The project involves the creation of an autonomous source of water supply by constructing (drilling) an artesian well with a full range of necessary engineering infrastructure. As part of the project, it is planned to drill a well to the aquifer, equip a pumping chamber, install water lifting equipment, connect to the existing water supply system, and organize a sanitary protection zone. The proposed solution allows you to create a backup water supply independent of external sources, which will ensure continuous water supply to the population in the event of damage to the main pipeline or power outage of the water treatment plant. The implementation of the project will contribute to increasing the reliability of the water supply system, reducing critical dependence on external supply, and ensuring the sustainable functioning of the community in emergency situations.
Project cost2'532'299 UAH
Implementation period3 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction (drilling) of artesian well No. 4 for water supply of the Chornomorsk urban territorial community of the Odessa district, Odessa region at the address: Odesa region, Odessa district, Chornomorsk city, Transportna st., 11.

Project Goal
Improving the equality of wealth distribution. Improving the quality of services
Geography
Chornomorska community, Chornomorsk city
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
New construction (drilling) of artesian well No. 4 for water supply of the Chornomorsk urban territorial community of Odessa district, Odessa region at the address: Odesa region, Odessa district, Chornomorsk city, 11 Transportna st.
Construction of a local seawater desalination plant
The project involves the creation of an autonomous source of water supply by constructing (drilling) an artesian well with a full range of necessary engineering infrastructure. As part of the project, it is planned to drill a well to the aquifer, equip a pumping chamber, install water lifting equipment, connect to the existing water supply system, and organize a sanitary protection zone. The proposed solution allows you to create a backup water supply independent of external sources, which will ensure continuous water supply to the population in the event of damage to the main pipeline or power outage of the water treatment plant. The implementation of the project will contribute to increasing the reliability of the water supply system, reducing critical dependence on external supply, and ensuring the sustainable functioning of the community in emergency situations.
Project cost2'532'299 UAH
Implementation period4 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

New construction (drilling) of artesian well No. 1 for water supply of the Chornomorsk urban territorial community at the address: Odesa region, Odessa district, Molodizhne village, Sanzhiyska doroha st., 3-B.

Project Goal
Improving the condition of infrastructure. Improving the equality of wealth distribution, Improving the quality of services
Geography
Chornomorska community
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
New construction (drilling) of an artesian well
Construction of a local seawater desalination plant
The project involves the creation of an autonomous source of water supply by constructing (drilling) an artesian well with a full range of necessary engineering infrastructure. As part of the project, it is planned to drill a well to the aquifer, equip a pumping chamber, install water lifting equipment, connect to the existing water supply system, and organize a sanitary protection zone. The proposed solution allows you to create a backup water supply independent of external sources, which will ensure continuous water supply to the population in the event of damage to the main pipeline or power outage of the water treatment plant. The implementation of the project will contribute to increasing the reliability of the water supply system, reducing critical dependence on external supply, and ensuring the sustainable functioning of the community in emergency situations.
Project cost2'532'299 UAH
Implementation period3 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Major repairs of damaged sections of household gravity sewer collectors passing through the territory of the main sewage pumping station at the address: Odesa region, Odessa district, Chornomorsk city, 23 Parkova st.

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Chornomorsk city
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Major repairs of damaged sections of household gravity sewer collectors passing through the territory of the main sewage pumping station at the address: Odesa region, Odessa district, Chornomorsk city, 23 Parkova st.
Construction of new sections of household gravity sewer collectors passing through the territory of the main sewage pumping station at the address: Odesa region, Odessa district, Chornomorsk city, 23 Parkova st.
According to the design task, the working project provides for the overhaul of emergency sections of the existing sewer collector DN 800 mm on the territory of the State Water and Sewerage Service, with a total length of 126.2 m, which is designed along the existing route using the "rehabilitation" method - with the passage of polyethylene spiral-wound pipes SPIROKOR 600/678 Sn 8 inside the existing reinforced concrete pipe DN 800 mm. The destroyed walls of existing wells are restored with "Gidrozit" mixtures. After the completion of the repair work, the pits are backfilled.
Project cost4'638'495 UAH
Implementation period4 months
Local level of SPP
Local level of SP
Date03. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Subsidy from the state budget to local budgets for the implementation of a public investment project to ensure high-quality, modern and accessible general secondary education “New Ukrainian School”

Project Goal
Increasing compliance with modern standards. Improving the quality of services
Geography
Chornomorsk city
Initiator
DEPARTMENT OF EDUCATION OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Subsidy from the state budget to local budgets for the implementation of a public investment project to ensure high-quality, modern and accessible general secondary education “New Ukrainian School”
Providing high-quality, modern and accessible general secondary education "New Ukrainian School"
creation of a modern educational space for general secondary education institutions that implement the educational process in a full-time form or with a combination of full-time and distance learning forms of education and which, according to the plan for forming a network of general secondary education institutions in the 2028/2028 academic year, will not provide specialized secondary education (teaching aids and equipment, furniture, computer and multimedia equipment for biological, physical, chemical laboratories, STEM laboratories and/or classrooms of the urban educational sector)
Project cost2'036'600 UAH
Implementation period6 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of the water supply pipe DN 600 mm to the fish port in the village of Burlacha Balka, Odessa district, Odessa region, on a section near the village of Sukhyi Liman, 460 m long

Project Goal
Improving the condition of infrastructure. Capacity building, Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services
Geography
Burlacha Balka village, Malodolynske village
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Reconstruction of the water supply system with replacement of pipes with polyethylene (PE100)
Construction of a new section of an alternative water supply system
The decision involves the reconstruction of the emergency section of the main water supply in the area of the village of Sukhyi Lyman with the complete replacement of worn-out steel pipes with modern PE100 SDR17 polyethylene pipes. The project involves laying a new section of the pipeline with a length of about 460 m, installing new water wells, shut-off valves and performing the necessary construction and installation works. The use of polyethylene pipes will provide increased corrosion resistance, reduce water losses, increase the reliability of the network and significantly reduce the risk of accidents in the water supply system.
Project cost9'418'031 UAH
Implementation period3 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Reconstruction of the pressure sewer collector at the address: Odesa region, Odessa district, Chornomorsk city, from Kosmonavtiv st., 59g in the village of Malodolynske to Svitla st., 51 in the village of Oleksandrivka

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Improving the quality of services
Geography
Oleksandrivka town, Malodolynske village
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Reconstruction of the pressure sewer collector with replacement of the pipeline with PE100 polyethylene pipes
Major overhaul of the existing pressure sewer collector
The selected technical solution involves the reconstruction of the emergency section of the pressure sewer collector with the replacement of the existing worn-out pipeline with modern PE100 polyethylene pipes with a diameter of 250 mm. The total length of the reconstruction section is 464 m. The project involves the dismantling or decommissioning of the existing pipeline, the laying of a new pipeline using modern materials and technologies, the reconstruction of sewer wells, as well as the restoration of the road surface and landscaping after the completion of construction work. The use of polyethylene pipes will ensure high corrosion resistance, tightness of connections and long-term operation of the pipeline. The implementation of the solution will increase the reliability of the drainage system, reduce the risk of emergency situations and ensure stable transportation of wastewater to the sewage treatment plants of the city of Chornomorsk.
Project cost7'935'915 UAH
Implementation period3 months
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusPreliminary Investment Feasibility Study

Construction of a building with an upgrade of a gas-piston cogeneration unit (reserve power source) with a capacity of more than 1 MW on the territory of the boiler house of the Chornomorskteploenergo utility company of the Black Sea City Council of the Odesa district of the Odesa region at the address: Odesa region, Odesa district, Chornomorsk city, str. Sadova, 1

Project Goal
Поява нових виробничих потужностей. Capacity building
Geography
Odeska region
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Maturity level
73
Construction of a building with the installation of a gas-piston cogeneration plant
Alternative solution
Gas piston cogeneration plant (backup power source), based on the operation of two Jenbacher JMS 312 GS-N.L cogeneration gas piston plants with an electric capacity of 638 kW and a thermal capacity of 377 kW each. The plant is designed to meet the needs of the central gas generator plant "Chornomorskteploenergo" and operates in cogeneration mode: the generation of electrical energy occurs together with the generation of thermal energy, which, performing the function of cooling the gas piston engine, is simultaneously directed to heating the coolant in the heating network. The system under consideration is designed for two operating modes: - the so-called "island" mode, when the plant operates separately from the heating network, generating electricity only for the needs of the gas generator; - parallel operation mode with the electrical network. In this mode, the power plant mainly works to meet the gas generator's own needs, and peak surges in electricity consumption of the gas generator (starting currents) are compensated by the external power grid. This mode allows for more uniform operation of the power generating equipment, which ensures its uniform wear. The total heat load in the gas generator is 1434 kW, an additionally installed economizer increases the total heat output to 717 kW for each unit; Fuel type - natural gas.
Project cost71'059'907 UAH
Implementation period10 months