Major roof repairs with installation of a solar system in preschool educational institution No. 1 at the address: Odesa region, Odessa district, city of Chornomorsk, 1 Travnya st., 4B


Sector
Education and science
Stream
CREATION of conditions to ensure the needs of the population in high-quality and affordable education for children, stable functioning of educational institutions
Maturity level
75
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

A solar water heating system is a set of equipment that uses solar energy to heat domestic water throughout the calendar year and is a component of the energy independence of a preschool educational institution. The installation of this system requires a number of technical solutions, including roof repair (actually the place where the solar system elements are installed).

The purpose of the project

Main Goal:

Introducing innovations and energy-efficient solutions

Secondary Goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

Installing a solar system in a preschool will allow for an energy-efficient solution to provide hot water without dependence on external energy supplies.

Problems and solutions resulting from project implementation

It is the presence of a solar system that will allow the preschool institution to become energy independent.

Socio-economic context

Indicator

Value

Number of people who will use the service

150 human

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

Preschool education

Stream

CREATION of conditions to ensure the needs of the population in high-quality and affordable education for children, stable functioning of educational institutions

Strategic document

Стратегія розвитку територіальної громади

Task

2.1.2 Develop alternative and renewable energy sources to increase community energy independence

Project objectives

Indicator
Base value
Target value
Major roof repairs with the installation of a solar system in a preschool educational institution, as a complex of energy-efficient and energy-independent measures
0 units
1 units

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

фактична потреба організації енергонезалежності закладу дошкільної освіти
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
115 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Protecting and restoring biodiversity and ecosystems
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

The project will create jobs available to women (temporarily or permanently)
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Expert report (ZDO No. 1) "Overhaul of the roof with the installation of a solar system in a preschool educational institution No. 1.pdf
28.01.2026
12:02:24 UTC

Alternative technical solutions

Technical Solution 1

Major roof repairs with installation of a solar system in preschool educational institution No. 1 at the address: Odesa region, Odessa district, city of Chornomorsk, 1 Travnya st., 4B

Technical Solution 2

Implementation of a solar energy system (solar system) for water heating in a preschool educational institution

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)5'040'591 UAH11'400'000 UAH
For preparation196'963 UAH300'000 UAH
For implementation4'843'628 UAH11'100'000 UAH
Project operation and closure cost150'000 UAH100'000 UAH
For operation100'000 UAH50'000 UAH
For closing50'000 UAH50'000 UAH
Average annual costs100'000 UAH0 UAH
Project duration, incl.13 months14 months
Deadline for developing a FFS1 month2 months
Implementation period12 months12 months
Service life120 months120 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, both national and international

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget5'190'591 UAH11'500'000 UAH
Project cost (preparation and implementation)5'040'591 UAH11'400'000 UAH
For preparation196'963 UAH300'000 UAH
For implementation4'843'628 UAH11'100'000 UAH
Project operation and closure cost150'000 UAH100'000 UAH
For operation100'000 UAH50'000 UAH
For closing50'000 UAH50'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service Unitкількість вихованців закладу дошкільної освіти
Service Unit Cost45'135 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
None of the options are applicable
Does the team have experience implementing similar projects?
Partially, we have limited experience

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Partially, we are considering options

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Financial riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
28/01/2026SP-L-280126-2B2F74D5Community SPInvestment Feasibility StudyIncludeThe relevance of the strategy has been confirmed.-
04/02/2026SPP-L-040226-2C2600D6Community SPPInvestment Feasibility StudyIncludeApproved by the Investment Council of the Black Sea Urban Territorial Community75