Chornomorska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
5
Projects
Projects by sectors
5
Projects
Projects by goal
5
Projects
Projects by status
214,39 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusPreliminary Investment Feasibility Study

Construction of a building with an upgrade of a gas-piston cogeneration unit (reserve power source) with a capacity of more than 1 MW on the territory of the boiler house of the Chornomorskteploenergo utility company of the Black Sea City Council of the Odesa district of the Odesa region at the address: Odesa region, Odesa district, Chornomorsk city, str. Sadova, 1

Project goal
Поява нових виробничих потужностей. Capacity building
Geography
Odeska region
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Construction of a building with the installation of a gas-piston cogeneration plant
Alternative solution
Gas piston cogeneration plant (backup power source), based on the operation of two Jenbacher JMS 312 GS-N.L cogeneration gas piston plants with an electric capacity of 638 kW and a thermal capacity of 377 kW each. The plant is designed to meet the needs of the central gas generator plant "Chornomorskteploenergo" and operates in cogeneration mode: the generation of electrical energy occurs together with the generation of thermal energy, which, performing the function of cooling the gas piston engine, is simultaneously directed to heating the coolant in the heating network. The system under consideration is designed for two operating modes: - the so-called "island" mode, when the plant operates separately from the heating network, generating electricity only for the needs of the gas generator; - parallel operation mode with the electrical network. In this mode, the power plant mainly works to meet the gas generator's own needs, and peak surges in electricity consumption of the gas generator (starting currents) are compensated by the external power grid. This mode allows for more uniform operation of the power generating equipment, which ensures its uniform wear. The total heat load in the gas generator is 1434 kW, an additionally installed economizer increases the total heat output to 717 kW for each unit; Fuel type - natural gas.
Budget72'193'907 UAH
Implementation period10 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorPreschool education
StatusInvestment Feasibility Study

Major roof repairs with installation of a solar system in preschool educational institution No. 1 at the address: Odesa region, Odessa district, city of Chornomorsk, 1 Travnya st., 4B

Project goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards
Geography
Chornomorsk city
Initiator
DEPARTMENT OF EDUCATION OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Major roof repairs with installation of a solar system in preschool educational institution No. 1 at the address: Odesa region, Odessa district, city of Chornomorsk, 1 Travnya st., 4B
Implementation of a solar energy system (solar system) for water heating in a preschool educational institution
installation of water heating systems that use solar energy as a measure of energy independence for the educational institution.
Budget5'190'591 UAH
Implementation period13 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major renovation of the catering unit in the building of the Chornomorsk Lyceum No. 7 of the Chornomorsk City Council, Odessa district, Odessa region, Chornomorsk, Myru Avenue, 43-A

Project goal
Increasing compliance with modern standards. Introducing innovations and energy-efficient solutions, Meeting demand
Geography
Chornomorsk city
Initiator
DEPARTMENT OF EDUCATION OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Major renovation of the catering unit in the building of Chornomorsky Lyceum No. 7 of the Chornomorsky City Council of the Odessa district of the Odessa region
Overhaul of the cafeteria, dining hall and utility rooms with the installation of new electrical equipment and equipment that allows the use of modern cooking technology.
The overhaul of the catering unit involves the repair of premises, complete re-equipment of technological equipment, replacement of information and structural support (electricity, water supply, ventilation, etc.), which will ensure the organization of the provision of catering services for students in grades 1-11(12), which meets modern requirements
Budget22'769'891 UAH
Implementation period13 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of a dual-purpose civil defense protective structure of the Chornomorsk Lyceum No. 3 of the Chornomorsk City Council, Odessa District, Odessa Region at the address: Chornomorsk, Parkova St., 10-A. Correction

Project goal
Creation of new facilities and services. Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Meeting demand
Geography
Odeska region
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
New construction of a dual-purpose civil defense protective structure of the Chornomorsk Lyceum No. 3 of the Chornomorsk City Council, Odessa District, Odessa Region at the address: Chornomorsk, Parkova St., 10-A. Correction
primary (mobile) shelter
The proposed solution involves the construction of a protective structure with a calculated capacity that corresponds to the actual number of students and employees of the lyceum, ensuring the regulatory level of protection against the damaging factors of military emergencies. The structure is designed taking into account the possibility of a long stay of people, equipped with ventilation, power supply, lighting, water supply and sanitary and hygienic premises. The functional purpose of the dual-use structure involves its operation in peacetime for the needs of the educational process or economic activities of the institution, which contributes to the rational use of budget funds and increases the efficiency of investments. The project provides for the construction of a civil defense structure - a dual-purpose structure with protective properties of an anti-radiation shelter to ensure the protection of students of the Black Sea Lyceum No. 3, Kindergarten, and staff of educational institutions during emergencies. The structure consists of two separate volumes: the main radiation shelter structure and the DES structure. The shelter structure is designed to be rectangular in plan with maximum overall dimensions in the axes of 57.0 x 21.7 m. The structure consists of two separate volumes: the main radiation shelter structure and the DES structure. The radiation shelter structure is one-story, underground, the floor height is 2.7 m. The floor level is below (on average) the planning ground level by 2.5 - 4.5 m. The structure is designed with three scattered entrances - exits with vestibules leading directly to the bell tower, two of which are equipped with vertical lifts for the disabled. The following premises are designed as part of the anti-radiation shelter structure: premises for sheltering children in grades 1-2 and 3-4, premises for raising children in grades 5-12, premises for sheltering children from kindergarten - 333 people (each of the shelter premises provides places for sheltering MGN and educational institution personnel); premises for dirty clothes; electrical switchboard; ventilation chambers; premises for storing food; medical point; premises for water supply tanks; bathrooms (including for MGN); corridors; vestibules. The structural system of the structure - with monolithic walls and diaphragms and monolithic floor slabs. Partitions are designed from aerated concrete blocks. Floor coverings are designed from ceramic tiles and painted concrete base according to the purpose of the premises. The walls and ceilings are designed with plastering for painting. The entrance doors to the building are protective-hermetic, the interior windows and doors are polyvinyl chloride, the exterior doors are fireproof. A children's playground with small architectural forms is designed above the building. The DES building is detached, one-story, rectangular in shape with overall dimensions of 8 x 3.8 m. The building consists of one DES building. The eaves are single-pitched, the roof covering is Euroruberoid. The structural scheme of the building - with monolithic reinforced concrete walls and monolithic reinforced concrete floors. The floor covering - painting on a concrete base. The walls and ceilings are designed with plastering for painting.
Budget102'872'424 UAH
Implementation period20 months
Local level of SPP
Local level of SP
Date12. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Major repairs of the emergency section of the sewer collector located at: Odesa region, Odessa district, Chornomosrk city, Zahisnyky Ukrainy st., 1P to Parkova st., 23

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Chornomorsk city
Initiator
MUNICIPAL ENTERPRISE "CHORNOMORSKVODOKANAL" OF THE BLACK SEA CITY COUNCIL OF ODESSA DISTRICT OF ODESSA REGION
Major repair of the emergency section of the sewer collector by the method of rehabilitation, located at the address: Odesa region, Odessa district, Chornomosrk city, Zahisnyky Ukrainy st., 1P to Parkova st., 23
Construction of a new section of the sewer collector located at: Odesa region, Odessa district, Chornomosrk city, 1P Zahisnykyv Ukrainy st. to 23 Parkova st.
It is planned to restore the operability of the existing emergency sewer collector Du-800 by rehabilitating it using a polymer corrugated pipe SPIROKOR, which is threaded inside the old reinforced concrete collector.The work includes: partial opening of the soil only in the places of wells and technological breaks, cleaning and preparation of the inner surface of the old pipe, threading a new polymer pipe Du-800, injection or filling reinforcement of the annular space, installation of new or repair of existing wells, minimal restoration of landscaping.
Budget11'372'079 UAH
Implementation period5 months

In focus