Emergency restoration work (overhaul) of an apartment building at 241 Druzhby Narodiv St. in Kharkiv
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
An apartment building that suffered significant damage as a result of military operations and is subject to major repairs is located at 241 Druzhby Narodiv Street (Sobornosti Ukrainy) in the Kyivskyi district of Kharkiv.
As a result of the impact of the weapons, the building suffered the following damage:
- destruction and significant damage to external and internal wall panels, floor slabs, partitions, balcony fences, ventilation blocks;
- damage and destruction of the roll roof;
- damage to the entrance group structures;
- destruction and damage to floors, doors, windows and glazing of loggias;
- damage to the blind area;
- destruction in some apartments of internal networks and devices of heating systems, cold and hot water supply, electricity supply, sewage and gas supply.
The detailed design provides for the following restoration solutions:
- dismantling of the remains of destroyed structures and structures with significant damage (internal load-bearing and external non-load-bearing wall panels, floor slabs, partitions, ventilation blocks, balcony fences, window frames, doors);
- dismantling of the rolled roof and covering structures on the technical floor;
- installation of monolithic reinforced concrete floor slabs;
- installation of monolithic reinforced concrete internal load-bearing transverse walls and side load-bearing walls of loggias;
- installation of load-bearing brick walls;
- installation of external fencing made of aerated concrete blocks;
- reinforcement of structures;
- restoration of entrance groups;
- installation of new partitions on the site of the destroyed and dismantled ones;
- installation of prefabricated reinforced concrete ventilation blocks;
- installation of prefabricated reinforced concrete round hollow panels of the technical floor ceiling;
- installation of loggia fencing;
- installation of insulation: on the ceiling of the 9th floor; facades, including external window slopes and external loggia fencing; external surfaces of the machine room walls and under the basement ceiling;
- cleaning from soot and restoring with a repair solution the surfaces of floor slabs, partitions, internal and external wall panels with minor damage;
- installation of a new roll roof, insulation coating;
- installation of water intake funnels;
- repair and restoration of damaged elevator equipment in elevator shafts and machine rooms;
- replacement of all windows with double-glazed windows in metal-plastic frames;
- installation of doors;
- painting of external walls with facade paints over a layer of decorative plaster;
- restoration of damaged blind areas.
The implementation of the project will ensure the restoration of damaged housing stock, the return of residents to their own homes and improvement of living conditions. The project meets the requirements of energy efficiency, social needs of the community, increases safety and comfort, contributes to the restoration of the community and meets the strategic goals of the state, and has high social significance.
The purpose of the project
Main Goal:
Rebuilding the damaged/destroyed
Secondary Goal:
Increasing compliance with modern standards, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Improving the quality of services, Reducing territorial or social gaps
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
230 human
Other functional
9068.9 m2
Population in the geographical area of influence of the project
1.3 mln people
Number of IDPs in the geographical area of impact of the project
212 thous. people
Strategic Case
Strategic feasibility of the project
Sector
Housing
Subsector
Housing Reconstruction
Stream
Restoration of apartment buildings damaged as a result of the armed aggression of the Russian Federation
Strategic document
State Strategy for Regional Development for 2021–2027
Task
Operational objective 1. Ensuring integrated development of territories taking into account the interests of future generations. Point 2 Implementation of priority measures for life safety, restoration and stimulation of economic activity in territorial communities classified as recovery areas.
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
Emergency restoration work (overhaul) of an apartment building at 241 Druzhby Narodiv St. in Kharkiv
Technical Solution 2
Emergency restoration works (overhaul) of an apartment building at 241 Druzhby Narodiv St. in Kharkiv with the integration of renewable energy sources
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Risk assessment
Organizational events
Team involvement
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]