Emergency and restoration works (overhaul) of the multi-apartment residential building of the condominium association "Krychevsky-41" at 41 Krychevsky St. in Kharkiv
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
An apartment building that suffered significant damage as a result of military operations and is subject to major repairs is located at 41 Krychevsky St. in the Kyiv Administrative District of Kharkiv.
As a result of the impact of weapons into the building, the external enclosing structures of the building (windows, doors, roof, etc.) were destroyed. The building is currently in operation.
The detailed project for major repairs provides for:
- dismantling all damaged structures;
- restoration of destroyed and damaged external and internal wall panels;
- restoration of damaged and destroyed internal structures of the building;
- restoration of damaged parapets; - installation of a new roof made of rolled material;
- restoration of elements of entrance groups, including entrance to the basement;
- replacement of destroyed and damaged window and door fillings with metal-plastic window blocks and balcony doors with double-glazed windows;
- partial restoration of facade decoration;
- replacement of entrance doors to apartments and interior doors in common areas;
- replacement of insulation of the technical floor ceiling;- restoration of damaged and destroyed interior decoration in common areas of the building;
- restoration of engineering networks;
- replacement of destroyed elevator equipment.
The detailed design provides for measures regarding reliability and safety, protection of building structures from corrosion, grounding and lightning protection. The design solutions take into account the requirements for compliance with standards for creating an accessible living environment for people with disabilities and other low-mobility groups, namely: ensuring unobstructed access to the elevator hall on the first floor and the elevator itself by installing lifts from the ground level to elevation 0.000; ensuring the needs of people with visual impairments by installing signs in Braille at the entrance to the building and on each floor indicating the floor and entrance to the building.
The purpose of the project
Main Goal:
Rebuilding the damaged/destroyed
Secondary Goal:
Increasing compliance with modern standards, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Improving the quality of services, Reducing territorial or social gaps
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Other functional
50615 m2
Number of people who will use the service
461 human
Other functional
17004 m2
Other functional
15450.8 m2
Other functional
1401.3 m2
Number of IDPs in the geographical area of impact of the project
212 thous. people
Population in the geographical area of influence of the project
1.3 mln people
Strategic Case
Strategic feasibility of the project
Sector
Housing
Subsector
Housing Reconstruction
Stream
Restoration of apartment buildings damaged as a result of the armed aggression of the Russian Federation
Strategic document
State Strategy for Regional Development for 2021–2027
Task
Operational objective 1. Ensuring integrated development of territories taking into account the interests of future generations. Point 2 Implementation of priority measures for life safety, restoration and stimulation of economic activity in territorial communities classified as recovery areas.
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
Emergency and restoration works (overhaul) of the multi-apartment residential building of the condominium association "Krychevsky-41" at 41 Krychevsky St. in Kharkiv
Technical Solution 2
Emergency and restoration works (overhaul) of the multi-apartment residential building of the condominium association "Krychevsky-41" at 41 Krychevsky St. in Kharkiv with the integration of renewable energy sources
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Risk assessment
Organizational events
Team involvement
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]