Major repairs of the adjacent territory of a residential building with landscaping at the address: Zhytomyr, Ivan Ohienko St., 1/34


Sector
Housing
Stream
Ensuring repairs to residential infrastructure facilities
Maturity level
85
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The facility is located on the barrier-free route "Traffic without barriers". The need for major repairs to the adjacent territory is due to the expiration of the service life of the road surface, the unsatisfactory condition of the asphalt concrete and paving slabs.  The ramp, installed by the residents of the building on the external stairs, does not meet building codes and does not guarantee the safety of movement. Major repairs to the adjacent territory, the installation of an electric lift on the stairs of the building and the installation of tactile tiles in the pedestrian zone will ensure the unhindered movement of residents, especially those with limited mobility.

The purpose of the project

Main Goal:

Improving the condition of infrastructure

Secondary Goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

Major repairs to the roadway will improve traffic conditions. Resurfacing the pedestrian zone, installing tactile tiles, and equipping the entrance to the apartment building with an electric lift will improve the mobility of residents, especially those with limited mobility.

Problems and solutions resulting from project implementation

Existing defects in the coverage of the adjacent territory and the absence of tactile tiles in the pedestrian zone can lead to accidents during pedestrian traffic. Carrying out major repairs will increase the comfort and safety of pedestrian traffic, including people with special needs, and will also improve the appearance of our city.

Socio-economic context

Indicator

Value

Number of people who will use the service

98 human

Strategic Case

Strategic feasibility of the project

Sector

Housing

Subsector

Housing Solutions

Stream

Ensuring repairs to residential infrastructure facilities

Strategic document

Регіональна стратегія розвитку

Task

2.2.1. and 3.3.4. Improving the quality of the housing stock: reconstruction of old buildings, provision of affordable housing for the population; Creation of a barrier-free environment for all population groups in regions and territorial communities in all areas of barrier-free living.

Project objectives

Indicator
Base value
Target value
Arrangement of asphalt concrete pavement from asphalt concrete mixture and paving slabs
0 m2
272 m2

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
capital repairs of residential infrastructure.xls
23.12.2025
16:38:26 UTC

Alternative technical solutions

Technical Solution 1

Major repairs of the adjacent territory of a residential building with landscaping at the address: Zhytomyr, Ivan Ohienko St., 1/34

Technical Solution 2

The existing metal ramp is being replaced with an electric lift.

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)1'118'995 UAH0 UAH
For preparation72'550 UAH0
For implementation1'046'445 UAH0
Project operation and closure cost31'000 UAH0 UAH
For operation1'000 UAH0
For closing30'000 UAH0
Average annual costs574'998 UAH0 UAH
Project duration, incl.25 months0 months
Deadline for developing a FFS1 month0 months
Implementation period24 months0 months
Service life120 months0 months
Target indicatorsDefined Not defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Pending

[The project initiator has not taken any decision about this alternative technical approach.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget1'149'995 UAH0 UAH
Project cost (preparation and implementation)1'118'995 UAH0 UAH
For preparation72'550 UAH0 UAH
For implementation1'046'445 UAH0 UAH
Project operation and closure cost31'000 UAH0 UAH
For operation1'000 UAH0 UAH
For closing30'000 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
No
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service Unit1
Service Unit Cost1'149'995 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
23/12/2025SP-L-231225-05128FD8Community SPInvestment Feasibility StudyInclude--
29/12/2025SPP-L-291225-B2E63607Community SPPInvestment Feasibility StudyInclude-85