Zhytomyrska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
58
Projects
Projects by sectors
58
Projects
Projects by goal
58
Projects
Projects by status
18'986,55 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Project cost
Status
Stream
Initiation date
Project cost
Status
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Creation of an educational space within the "New Ukrainian School" and a pilot educational institution - Lyceum No. 34 (obtaining specialized secondary education in an academic direction) of the Zhytomyr city territorial community

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards
Geography
Zhytomyr city
Initiator
DEPARTMENT OF EDUCATION OF ZHYTOMYR CITY COUNCIL
Maturity level
88
Creation of an educational space within the "New Ukrainian School" and a pilot educational institution - Lyceum No. 34 (obtaining specialized secondary education in an academic direction) of the Zhytomyr city territorial community
Educational space within the "New Ukrainian School" and the pilot institution
Updating the modern educational space, inconsistency of equipment, which makes it impossible to ensure the educational process at the level of modern standards
Project cost21'284'440 UAH
Implementation period18 months
Local level of SPP
Local level of SP
Date02. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)

Project Goal
Improving the quality of services.
Geography
Zhytomyr city
Initiator
DEPARTMENT OF MUNICIPAL ECONOMY OF ZHYTOMYR CITY COUNCIL
Maturity level
77
Construction of a new line of pressure sewer collector from the State Water Supply and Sewerage Administration (16 Ivan Gonty St.) to KOS-1 – KOS-2 in the city of Zhytomyr. 2nd stage (correction)
Maintaining the existing network
New treatment facilities with a capacity of 62 thousand m3 per day will allow all capacities to be transferred to one site outside the city and to treat wastewater in accordance with European directives and standards. Automation of processes and the operation of exceptionally energy-efficient equipment will allow significant savings in the wastewater treatment process. Completion of the reconstruction of sewage treatment facilities 2 will allow decommissioning of sewage treatment facilities 1. All wastewater entering the Main Sewerage Pumping Station (MSPS) is pumped through a collector with a diameter of 1000 mm, which runs through the territory of the sewage treatment facilities (STP 1). Then one strand of the specified collector runs to sewage treatment facilities 2 (STP 2). Emergency backup collectors are present only between the GKNS site and OSK 1. To switch to operation only OSK 2 and discontinue the use of the OSK 1 site, it is necessary to build a backup sewer collector line with a length of 2,500 m between these sites, which is planned as the second stage of construction of the project.
Project cost170'702'174 UAH
Implementation period36 months
State level of SP
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Major renovation of the catering unit of Lyceum No. 4 of the city of Zhytomyr at the address: Zhytomyr, Troyanivska St., 26

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Introducing innovations and energy-efficient solutions
Geography
Zhytomyr city
Initiator
Lyceum No. 4 of the city of Zhytomyr
Maturity level
83
Major renovation of the catering unit of Lyceum No. 4 of the city of Zhytomyr at the address: Zhytomyr, Troyanivska St., 26
New construction of the catering unit of the municipal institution Lyceum No. 4 of the city of Zhytomyr at 26 Troyanivska Street
Implementation of major repairs of the catering unit at the address: Zhytomyr, Troyanivska St., 26. The project involves updating the structures of the premises, modernizing engineering networks (electricity, water supply, heating, ventilation), replacing and updating the technological equipment of the catering unit, as well as ensuring compliance with sanitary and hygienic standards. The goal is to improve the conditions for preparing and serving food, increase energy efficiency, and reduce operating costs.
Project cost18'124'296 UAH
Implementation period17 months
Local level of SPP
Local level of SP
Date02. 2026
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of the operating block of the surgical building of the municipal enterprise "Hospital No. 2 named after V.P. Pavlusenko" of the ZhMR at the address: Zhytomyr, R. Shukhevycha St., 2a

Project Goal
Improving the quality of services. Increasing compliance with modern standards, Increasing compliance with modern standards
Geography
Zhytomyrska region
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF ZHYTOMYR CITY COUNCIL
Maturity level
83
Reconstruction of the operating block of the surgical building of the KP "Hospital No. 2 named after V.P. Pavlusenko" ZhMR at the address: Zhytomyr, st. R. Shukhevych, 2a
Modernization of the operating room of the surgical building of the municipal enterprise "Hospital No. 2 named after V.P. Pavlusenko" to improve the quality and safety of medical services
The project involves a complete reconstruction of the operating room of the surgical building
Project cost28'202'212 UAH
Implementation period22 months
Local level of SPP
Local level of SP
Date12. 2025
SectorHousing
SubsectorHousing Solutions
StatusInvestment Feasibility Study

Major repairs of the adjacent territory of a residential building with landscaping at the address: Zhytomyr, Ivan Ohienko St., 1/34

Project Goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Zhytomyr city
Initiator
HOUSING DEPARTMENT OF ZHYTOMYR CITY COUNCIL
Maturity level
85
Major repairs of the adjacent territory of a residential building with landscaping at the address: Zhytomyr, Ivan Ohienko St., 1/34
The existing metal ramp is being replaced with an electric lift.
Overhaul of the adjacent territory with landscaping.
Project cost1'118'995 UAH
Implementation period25 months
Local level of SPP
Local level of SP
Date12. 2025
SectorHealthcare
SubsectorPrimary healthcare
StatusInvestment Feasibility Study

Reconstruction of the roof of the children's clinic at the address: Zhytomyr, Myru Avenue, 11

Project Goal
Increasing compliance with modern standards. Improving the quality of services
Geography
Zhytomyrska community, Zhytomyr city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF ZHYTOMYR CITY COUNCIL
Maturity level
85
Reconstruction of the roof of the children's clinic at the address: Zhytomyr, Myru Avenue, 11
Major repairs with partial roof replacement
The project involves the reconstruction of the roof of the general practice outpatient clinic – family medicine No. 19 in order to eliminate leaks and improve the technical condition of the building. The implementation of the project will ensure safe and proper conditions for patients and staff and the continuous provision of medical services.
Project cost4'199'266 UAH
Implementation period4 months
Local level of SPP
Local level of SP
Date12. 2025
SectorHousing
SubsectorHousing Solutions
StatusInvestment Feasibility Study

Major repairs of the adjacent territory of a residential building with landscaping at the address: Zhytomyr, Vitruka St., 42/7

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure
Geography
Zhytomyr city
Initiator
HOUSING DEPARTMENT OF ZHYTOMYR CITY COUNCIL
Maturity level
85
Install ramps near the entrances of buildings for unhindered movement of people with limited mobility
Do not install ramps near the entrances of buildings for the unhindered movement of people with limited mobility.
Installation of ramps will ensure unhindered movement of people with limited mobility
Project cost5'338'723 UAH
Implementation period25 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of a preschool educational institution at the address: Zhytomyr, Chervony Lane, 60

Project Goal
Creation of new facilities and services. Meeting demand
Geography
Zhytomyrska community, Zhytomyr city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION OF ZHYTOMYR CITY COUNCIL
Maturity level
83
New construction of a preschool educational institution at the address: Zhytomyr, Chervonyi Lane, 60
Modular mobile preschool
New construction of a preschool educational institution
Project cost169'128'018 UAH
Implementation period22 months
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorExtracurricular education
StatusInvestment Feasibility Study

Reconstruction of external power supply networks and installation of a backup source of heat supply for Lyceum No. 24 in Zhytomyr, at the address: Zhytomyr, Shevchenko St. 105 B

Project Goal
Increasing compliance with modern standards. Improving the condition of infrastructure
Geography
Zhytomyrska community, Zhytomyr city
Initiator
Lyceum No. 24 of Zhytomyr
Maturity level
83
Reconstruction of external power supply networks and installation of a backup source of heat supply for Lyceum No. 24 in Zhytomyr
Reconstruction of power supply networks and installation of a backup heat supply source
Modernization of the institution's infrastructure
Project cost3'974'033 UAH
Implementation period15 months
State level of SP
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorProfessional education, specialized education
StatusInvestment Feasibility Study

Creation of an educational and practical center for the profession "Shoe Upper Assembler; Shoe Assembler" at the Professional College of Beauty Industry and Technologies of the city of Zhytomyr

Project Goal
Creation of new facilities and services. Increasing compliance with modern standards
Geography
Zhytomyrska community
Initiator
Professional College of Beauty Industry and Technologies of Zhytomyr
Maturity level
87
Engineering-integrated training and practical center for the profession "Shoe upper assembler, Shoe assembler"
Engineering-integrated training and practical center for the profession "Shoe upper assembler, Shoe assembler" center
An engineering integrated training and practical center is a modern educational space that combines theoretical education and practical training of students. Such a center uses innovative equipment and digital technologies, as well as real production processes.
Project cost23'075'001 UAH
Implementation period19 months

In focus

All news