Major overhaul of hydraulic structures of the Osnytskyi reservoir with restoration of geometric parameters of the bed (near the village of Osnytskyi, the village of Osnytskyi, Rokytnivska territorial community, Sarny district, Rivne region)
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
Overhaul of hydraulic structures of the Osnytskyi reservoir with restoration of geometric parameters of the bed — is a set of works aimed at restoring the technical characteristics of the reservoir, which will ensure stable operation of the facility and improve the state of the environment. The main objectives of such repairs are: Restoration of geometric parameters of the reservoir bed — this includes adjusting the shape of the bottom, bypass ditches, depths, as well as eliminating erosion processes or sedimentation that can reduce the capacity of the reservoir or negatively affect the hydraulic characteristics of the water. Improving water exchange and reducing the negative impact on the Lva River — due to the restoration of the correct geometric parameters of the reservoir, water will move more evenly, which will reduce the level of water pollution and increase its quality, as well as reduce the negative impact on the Lva River and adjacent territories. Reducing unproductive water consumption — thanks to the repair and modernization of the water resources management system, wasteful use of water will be reduced, which will allow it to be stored more effectively. Optimal supply of water resources for the needs of vegetation - this will ensure a sufficient level of water to support agricultural needs, in particular for irrigation of crops during periods of intensive growth and vegetation. Improvement of the ecological situation - proper functioning of the reservoir will also create optimal conditions for the existence of aquatic ecosystems, improve water quality, provide conditions for fish farming and maintain biodiversity in the region.
The purpose of the project
Main goal:
Rebuilding the damaged/destroyed
Secondary goal:
Improving the condition of infrastructure
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Other functional
5 units
Strategic Case
Strategic feasibility of the project
Sector
Environment
Subsector
Water protection, water management development, flood risk mitigation, centralized water supply, management, use and restoration of surface water resources
Stream
Ensuring protection from the harmful effects of water in settlements, industrial facilities and agricultural lands, creating safe living conditions for the population
Strategic document
Water Strategy of Ukraine until 2050
Task
1 Preparation and implementation of flood risk management plans in accordance with the legislation and provisions of Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
RECONSTRUCTION AND COMPREHENSIVE RESTORATION OF THE RESERVOIR'S OPERATIONAL CHARACTERISTICS
Technical Solution 2
PARTIAL CLEARING AND DREENING OF THE RUNWAY WITHOUT COMPLETE RECONSTRUCTION OF STRUCTURES
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Preliminary cost breakdown
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]