General information
Description of the project
The project is implemented within the framework of: Agreement between the Cabinet of Ministers of Ukraine and the Government of Germany on Financial Cooperation (appropriations for 2006 and 2007), signed on 12/30/2011, ratified on 10/02/2012 (Law No. 5298-VI), entered into force on 12/04/2012; Credit Agreement between the Cabinet of Ministers of Ukraine and the Credit Institution for Reconstruction (KfW), signed on 12/30/2011, entered into force on 12/04/2012; - Separate Agreement between NPC «Ukrenergo» and KfW, signed on 12/30/2011. On 04/22/2024, Additional Agreement No. 2 dated 12/19/2022 was signed to the Separate Agreement between Ukrenergo and KfW dated 12/30/2011 to the Loan Agreement between the Cabinet of Ministers of Ukraine and KfW dated 12/30/2011 Modern requirements for ensuring the reliability of electrical networks in normal modes and modes of technological disruptions, relevant plans for further integration of the Unified Power System of Ukraine with the European energy system impose high requirements for the reliability of electrical equipment, which entails the need to carry out large-scale work on the comprehensive reconstruction of the electrical networks of the Unified Power System of Ukraine, an important component of which are electrical substations. The project envisages the reconstruction of two substations of the Dniprovska ES (330 kV substation "Kryvorizka" and 330 kV "Dnipro-Donbas" with the implementation of automated process control systems (APCS) at these substations. The project is aimed at ensuring reliable and uninterrupted operation of the electrical networks of the Unified State Electric Power System of Ukraine. To achieve the set goals, it is necessary to modernize the nodal substations of the power transmission network in order to ensure the necessary electrical connections and the level of electricity consumption. At the stage of Project implementation, changes were made to the direction of activity under the Project, namely: - procurement and installation of physical protection measures for substations; - procurement and installation of autotransformers, single-phase reactors and related equipment for substations (damaged as a result of hostilities) from the entire Unified State Electric Power System network.