- Preparation
- General information
- Strategic Case
- Economic Case
- Financial Case
- Management Case
General information
Description of the project
The purchase of new gas turbines (with a capacity of 16 MW) will ensure uninterrupted operation of the compressor shops of underground gas storage facilities and guaranteed gas withdrawal from the UGS at maximum productive levels, especially during critical periods. The use of powerful modern engines will allow achieving peak efficiency at the end of the injection and withdrawal seasons (during the most important and difficult periods).
The purpose of the project
Main goal:
Improving the condition of infrastructure
Secondary goal:
Increasing compliance with modern standards
Description of the purpose of the project and ways to achieve it
The use of powerful modern engines will allow for peak efficiency at the end of the injection and withdrawal seasons (during the most critical and challenging periods).
Problems and solutions resulting from project implementation
JSC "Ukrtransgaz" urgently needs to restore its technological equipment fleet to ensure Ukraine's energy security during the autumn-winter period.
Socio-economic context
Indicator
Value
Number of employees of the institution/institution/organization
5000 human
Population in the geographical area of influence of the project
30 mln people
Strategic Case
Strategic feasibility of the project
Sector
Energy Sector
Subsector
Oil and gas industry
Stream
Development and production of gas and oil
Strategic document
Energy Strategy of Ukraine until 2050
Task
Increasing domestic production of natural gas and oil by intensifying geological exploration, introducing modern drilling and production technologies, optimizing the development of hydrocarbon deposits, as well as developing the infrastructure for storing, transporting and processing hydrocarbons in order to increase Ukraine's energy independence and security.
Project objectives
Indicator
Base value
Target value
Ensuring energy security
80 %
90 %
Economic justification
Alternative technical solutions
Technical Solution 1
purchase of 7 GPA
Technical Solution 2
further use of existing equipment
Total costs8'000'000'000 UAH0 UAH
Average annual costs400'000'000 UAH0 UAH
Project duration, incl.51 months0 months
Service life240 months0 months
Target indicatorsDefined Not defined
Technical Solution Status
Active
Pending
Financial justification
Total project budget
Total preliminary budget8'000'000'000 UAH0 UAH
Capital costs8'000'000'000 UAH0 UAH
Operational costs0 UAH0 UAH
Preliminary cost breakdown
Operating costs for implementation0 UAH0 UAH
For preparation0 UAH0 UAH
For implementation8'000'000'000 UAH0 UAH
For operation0 UAH0 UAH
For closing0 UAH0 UAH
Average project cost per service recipient
Service Unitн/з
Service Unit Cost0 UAH
Profitability of the project
Is the project expected to generate income?
ResponseNoNo
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Source and MechanismYesNo
Management Rationale
Risk assessment
Financial riskDefinedUndefined
Operational riskDefinedUndefined