Purchase of gas pumping units for JSC "Ukrtransgaz" (7 GPU)


Sector
Energy Sector
Stream
Development and production of gas and oil
Project Status
Preliminary Investment Feasibility Study
Entry into Portfolio
State level of SPP
Investment Feasibility Study
Implementation
Completion

General information

Description of the project

The purchase of new gas turbines (with a capacity of 16 MW) will ensure uninterrupted operation of the compressor shops of underground gas storage facilities and guaranteed gas withdrawal from the UGS at maximum productive levels, especially during critical periods. The use of powerful modern engines will allow achieving peak efficiency at the end of the injection and withdrawal seasons (during the most important and difficult periods).   

The purpose of the project

Main goal:

Improving the condition of infrastructure

Secondary goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

The use of powerful modern engines will allow for peak efficiency at the end of the injection and withdrawal seasons (during the most critical and challenging periods).

Problems and solutions resulting from project implementation

JSC "Ukrtransgaz" urgently needs to restore its technological equipment fleet to ensure Ukraine's energy security during the autumn-winter period.

Socio-economic context

Indicator

Value

Number of employees of the institution/institution/organization

5000 human

Population in the geographical area of influence of the project

30 mln people

Strategic Case

Strategic feasibility of the project

Sector

Energy Sector

Subsector

Oil and gas industry

Stream

Development and production of gas and oil

Strategic document

Energy Strategy of Ukraine until 2050

Task

Increasing domestic production of natural gas and oil by intensifying geological exploration, introducing modern drilling and production technologies, optimizing the development of hydrocarbon deposits, as well as developing the infrastructure for storing, transporting and processing hydrocarbons in order to increase Ukraine's energy independence and security.

Project objectives

Indicator
Base value
Target value
Ensuring energy security
80 %
90 %
Economic justification

Alternative technical solutions

Technical Solution 1

purchase of 7 GPA

Technical Solution 2

further use of existing equipment

Total costs8'000'000'000 UAH0 UAH
  • For implementation
  • 8'000'000'000 UAH0
    Average annual costs400'000'000 UAH0 UAH
    Project duration, incl.51 months0 months
  • Deadline for developing a FFS
  • 3 months0 months
  • Implementation period
  • 48 months0 months
    Service life240 months0 months
    Target indicatorsDefined Not defined
    Technical Solution Status
    Active
    Pending

    Financial justification

    Total project budget

    Total preliminary budget8'000'000'000 UAH0 UAH
    Capital costs8'000'000'000 UAH0 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation0 UAH0 UAH
    For implementation8'000'000'000 UAH0 UAH
    For operation0 UAH0 UAH
    For closing0 UAH0 UAH

    Average project cost per service recipient

    Service Unitн/з
    Service Unit Cost0 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo
    Management Rationale

    Risk assessment

    Financial riskDefinedUndefined
    Operational riskDefinedUndefined