Second electricity transmission project


Sector
Energy Sector
Stream
Creation of new, expansion, reconstruction, technical re-equipment of existing energy infrastructure facilities (high-voltage power transmission lines, substations, high-voltage equipment, etc.)
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
State Single Project Pipeline
Implementation
Completion

General information

Description of the project

The project is aimed at ensuring: increasing the level of reliability of high-voltage substation equipment, reducing the likelihood of emergency situations in the operation of the electricity transmission system, reducing the risks of interruptions in electricity supply for the population and industry, improving conditions for increasing the efficiency of the functioning of the Unified Energy System of Ukraine by increasing the reliability of the electricity transmission system, improving the situation with reactive power compensation in networks, which will create technical conditions for closer integration of the Unified Energy System of Ukraine into the European Network of Transmission System Operators for Electricity (ENTSO-E), creating prerequisites for the effective functioning of the electricity market in Ukraine.

The purpose of the project

Main goal:

Improving the condition of infrastructure

Secondary goal:

Description of the purpose of the project and ways to achieve it

The goal of the project is to increase the reliability of the electricity transmission system, create prerequisites for the introduction of a full-scale electricity market and its effective functioning, which will allow Ukraine to become an important and full-fledged player on the European electricity markets.

Problems and solutions resulting from project implementation

The project is aimed at ensuring:  increasing the level of reliability of high-voltage substation equipment,  reducing the probability of emergency situations in the operation of the electricity transmission system,  reducing the risks of interruptions in electricity supply for the population and industry,  improving the conditions for increasing the efficiency of the functioning of the Unified Energy System of Ukraine by increasing the reliability of the electricity transmission system,  improving the situation with reactive power compensation in networks, which will create technical conditions for closer integration of the Unified Energy System of Ukraine into the European Network of Transmission System Operators for Electricity (ENTSO-E),  creating prerequisites for the effective functioning of the electricity market in Ukraine.

Socio-economic context

Indicator

Value

Other functional

1 %

Strategic Case

Strategic feasibility of the project

Sector

Energy Sector

Subsector

Electric power industry

Stream

Creation of new, expansion, reconstruction, technical re-equipment of existing energy infrastructure facilities (high-voltage power transmission lines, substations, high-voltage equipment, etc.)

Strategic document

Energy Strategy of Ukraine until 2050

Task

null Ensuring a stable, balanced model of operation of the Unified Power System of Ukraine; restoration, development and transformation of the power system, its sustainable operation;; increasing the efficiency of substations

Project objectives

Indicator
Base value
Target value
Economic justification

Alternative technical solutions

Technical Solution 1

The second electricity transmission project

Technical Solution 2

Not provided

Total costs14'870'296'703 UAH4 UAH
  • For preparation
  • 1 UAH1 UAH
  • For implementation
  • 14'870'296'700 UAH1 UAH
  • For operation
  • 1 UAH1 UAH
  • For closing
  • 1 UAH1 UAH
    Average annual costs1 UAH1 UAH
    Project duration, incl.133 months2 months
  • Deadline for developing a FFS
  • 1 month1 month
  • Implementation period
  • 132 months1 month
    Service life600 months1 month
    Target indicatorsDefined Defined
    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget14'870'296'703 UAH4 UAH
    Capital costs14'870'296'703 UAH4 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation1 UAH1 UAH
    For implementation14'870'296'700 UAH1 UAH
    For operation1 UAH1 UAH
    For closing1 UAH1 UAH

    Average project cost per service recipient

    Service UnitНе проводилось
    Service Unit Cost1 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds14'870'296'700 UAH0 UAH
    Expected Funds14'870'296'700 UAH0 UAH
    Management Rationale

    Risk assessment

    Other riskDefinedUndefined

    Organizational events

    ResponseDefinedUndefined
    Results of the feasibility analysis
    Economic Analysis
    Social benefits and costs
    Calculations were not performed
    Environmental benefits and costs
    Calculations were not performed
    Indirect benefits and costs
    Calculations were not performed