Installation of a solar power plant on the roof of the Buchanan City Council building


Sector
Energy Sector
Stream
Construction of new generating capacities
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves installing a 34.8 kW solar power plant (SPP) on the roof of the Buchanan City Council building in order to partially provide the administrative building with its own electricity from renewable sources. The SPP will annually produce about 37.45 MW·h of electricity, which will reduce electricity consumption from the grid and reduce the city budget's energy supply costs. The system includes a battery energy complex with a capacity of 40.8 kW·h (8 battery blocks), which ensures the accumulation and use of energy during peak load hours or during power outages. The implementation of the project will contribute to increasing the energy efficiency of municipal infrastructure, developing sustainable energy, and reducing CO₂ emissions.

The purpose of the project

Main goal:

Introducing innovations and energy-efficient solutions

Secondary goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

The goal of the project is to increase the energy efficiency and energy independence of the Buchanan City Council through the use of renewable energy sources. To achieve the goal, it is planned to install a 34.8 kW solar power plant on the roof of the city council building with a 40.8 kWh energy storage system, which will provide annual generation of about 37.45 MWh. The implementation of the project will allow partially to meet its own electricity needs, reduce the city budget, reduce greenhouse gas emissions and increase the stability of energy supply in the event of possible outages. The project will contribute to achieving sustainable development goals, in particular in terms of clean energy, energy efficiency and climate resilience of the community.

Problems and solutions resulting from project implementation

Problems: high energy consumption of the building and significant costs of paying for electricity from the local budget; dependence on centralized electricity supply, which leads to the risk of interruptions in the work of administrative services in the event of accidents or outages; lack of energy-efficient technologies; insufficient contribution to achieving sustainable development goals, in particular in the field of clean energy and climate neutrality. Expected results: reduction of electricity consumption from the grid; ensuring energy independence of the building thanks to the operation of a 34.8 kW solar power plant and a 40.8 kWh storage system; reduction of energy costs and reduction of CO₂ emissions; ensuring uninterrupted operation of critical city council systems during power outages; demonstration effect for spreading the practice of implementing "green" technologies in the community.

Socio-economic context

Indicator

Value

Other functional

55000 units

Number of IDPs in the geographical area of impact of the project

11 thous. people

Population in the geographical area of influence of the project

70 thous. people

Strategic Case

Strategic feasibility of the project

Sector

Energy Sector

Subsector

Electric power industry

Stream

Construction of new generating capacities

Strategic document

Task

A.2.5.1. Development of distributed generation of electricity (including cogeneration plants) and stimulation of the implementation of projects based on renewable energy sources

Project objectives

Indicator
Base value
Target value

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
80000 kWh
Economic justification

Alternative technical solutions

Technical Solution 1

Installation of a solar power plant on the roof of the Buchanan City Council building (using a hybrid inverter)

Technical Solution 2

Installation of a solar power plant on the roof of the Buchanan City Council building (without using a hybrid inverter)

Total costs2'550'512 UAH1'068'133 UAH
  • For preparation
  • 500'000 UAH300 UAH
  • For implementation
  • 1'995'512 UAH1'022'833 UAH
  • For operation
  • 25'000 UAH20'000 UAH
  • For closing
  • 30'000 UAH25'000 UAH
    Average annual costs54'350 UAH49'350 UAH
    Project duration, incl.8 months8 months
  • Deadline for developing a FFS
  • 4 months4 months
  • Implementation period
  • 4 months4 months
    Service life300 months300 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget2'550'512 UAH1'068'133 UAH
    Capital costs2'550'512 UAH1'068'133 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation500'000 UAH300 UAH
    For implementation1'995'512 UAH1'022'833 UAH
    For operation25'000 UAH20'000 UAH
    For closing30'000 UAH25'000 UAH

    Average project cost per service recipient

    Service UnitОрієнтовна собівартість виробленої електроенергії
    Service Unit Cost4 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH
    Management Rationale

    Risk assessment

    Technical riskDefinedUndefined
    Financial riskDefinedUndefined
    Economic riskDefinedUndefined
    Political riskDefinedUndefined
    Social riskDefinedUndefined
    Operational riskDefinedUndefined
    Market riskDefinedUndefined
    Environmental riskDefinedUndefined
    Other riskDefinedUndefined