Projects by status
4'909,66 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date12. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Technical re-equipment of primary electrical connections of substation No. 133, Bucha, 9-P Instytutska

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards
Geography
Bucha city
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
Technical re-equipment of primary electrical connections of substation No. 133, Bucha, 9-P Instytutska
Construction of a new transformer substation
Budget8'881'000 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Technical re-equipment of primary electrical connections of substation No. 71, Bucha, Yablunska 15-V

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards
Geography
Bucha city
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
Technical re-equipment of primary electrical connections of substation No. 71, Bucha, Yablunska 15-V
Construction of a new transformer substation
Budget10'132'007 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Technical re-equipment of primary electrical connections of substation No. 174, Bucha, Sklozavodskaya 6-B

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards
Geography
Bucha city
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
Technical re-equipment of primary electrical connections of substation No. 174, Bucha, Sklozavodskaya 6-B
Construction of a new transformer substation
Budget11'219'297 UAH
Implementation period9 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Technical re-equipment of primary electrical connections TP-32, Bucha, Kievo-Myrotska 135-B

Project goal
Rebuilding the damaged/destroyed. Increasing compliance with modern standards
Geography
Bucha city
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
Technical re-equipment of primary electrical connections TP-32, Bucha, Kievo-Myrotska 135-B
Construction of a new transformer substation
Budget10'081'000 UAH
Implementation period75 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform

Project goal
Increasing compliance with modern standards. Improving the quality of services
Geography
Buchanska community
Initiator
EDUCATION DEPARTMENT OF BUCHANAN CITY COUNCIL
Creating a modern educational environment; providing educational institutions with modern furniture, educational equipment and teaching materials; equipping classrooms with multimedia equipment; creating a safe, inclusive and developmental educational environment; ensuring access to quality education for all students.
Creating a modern educational environment; providing educational institutions with modular and mobile furniture; using digital educational platforms instead of some printed didactics; interactive panels; mobile STEM stations
Ensuring the formation of a modern educational space by equipping educational institutions with new furniture, educational equipment and didactic materials. Equipping classrooms with multimedia equipment. Creating a safe, inclusive and development-friendly educational environment. Guaranteeing equal access for all students to quality education.
Budget3'763'113 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date11. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusPreliminary Investment Feasibility Study

New construction of the water supply network Havrylivka-Lubyanka-Blystavytsia-Bucha-Vorzel in the territory of the Bucha territorial community of Kyiv region

Project goal
Improving the equality of wealth distribution. Meeting demand
Geography
Buchanska community
Initiator
MUNICIPAL ENTERPRISE "BUCHASERVICE" OF THE BUCHA CITY COUNCIL
A comprehensive infrastructure project to develop and modernize the community's water supply system
Reconstruction and modernization of existing local water supply systems in each settlement
It provides for the construction of a new centralized water supply network for all settlements of the community, the creation of a unified system of pumping stations, water tanks and water quality control, the use of modern technologies for water supply management and cost monitoring.
Budget407'517'066 UAH
Implementation period21 months
Local level of SPP
Local level of SP
Date11. 2025
SectorHousing
SubsectorHousing Reconstruction
StatusInvestment Feasibility Study

New Construction of Municipal (Social) Rental Housing Buildings in Blystavitsa Village, Bucha District, Kyiv Region

Project goal
Creation of new facilities and services. Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities
Geography
Buchanska community, Blystavytsia village
Initiator
BUCHANA CITY COUNCIL
New construction of residential buildings of the municipal (social) rental housing fund in the village of Blystavytsia, Buchansky district, Kyiv region
Construction of manor-type houses
Reconstruction and extension of existing buildings for municipal (social) rental housing
The alternative solution involves the new construction of multi-apartment residential buildings of municipal (social) rental housing in the village of Blystavytsa, Buchanan urban community. The solution includes the construction of a residential complex with 128 apartments with appropriate engineering infrastructure, landscaping, parking spaces, recreation areas, ensuring barrier-free access and energy efficiency. The main goal is to provide housing for internally displaced persons, socially vulnerable categories and community residents who need affordable rental housing.
Budget261'503'588 UAH
Implementation period48 months
Local level of SPP
Local level of SP
Date11. 2025
SectorMunicipal infrastructure and services
SubsectorUrban planning and landscaping
StatusInvestment Feasibility Study

Barrier-free routes of the Buchanan urban territorial community

Project goal
Ensuring inclusiveness and equal opportunities. Improving the equality of wealth distribution, Improving the condition of infrastructure
Geography
Buchanska community, Bucha city
Initiator
BUCHANA CITY COUNCIL
Barrier-free routes of the Buchanan urban territorial community
Using alternative materials
Partial infrastructure update
Implementation of barrier-free routes with a total length of 930 m to ensure accessibility of pedestrian infrastructure for all categories of the population, including persons with disabilities and groups with reduced mobility. The project involves the complete reconstruction and adaptation of sidewalks, pedestrian zones and approaches to public facilities in accordance with the provisions of the pilot project "Traffic without barriers" and PKMU No. 870 dated 15.07.2025.
Budget242'700'001 UAH
Implementation period24 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a solar power plant on the roof of the Buchanan City Council building

Project goal
Introducing innovations and energy-efficient solutions. Increasing compliance with modern standards
Geography
Bucha city
Initiator
BUCHANA CITY COUNCIL
Installation of a solar power plant on the roof of the Buchanan City Council building (using a hybrid inverter)
Installation of a solar power plant on the roof of the Buchanan City Council building (without using a hybrid inverter)
A distinctive feature of this option is the use of a hybrid inverter, which will allow both to compensate for its own consumption of electrical energy and to accumulate excess generated electricity in batteries.The storage system can be selected in accordance with the specified load and backup time. According to the results of the engineering survey, the first floor distribution board, to which the ASC consumers, servers, etc. are connected, was determined as such a load. The estimated power of this board is 10 kW.This feasibility study considers the installation of a 40.8 kWh BOS-GM5.1*8 storage system, which consists of 8 battery blocks.The system under consideration was selected to provide 10 kW of uninterrupted power supply to the 1st floor distribution board for 4 hours.
Budget2'550'511,9 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date11. 2025
SectorHousing
SubsectorHousing Reconstruction
StatusInvestment Feasibility Study

Housing Rehabilitation for Empowerment (HOPE)", Component 2: Design and Major Repair of Partially Damaged Apartment Buildings (BKB) in Buchanan Urban Territorial Community

Project goal
Rebuilding the damaged/destroyed. Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities
Geography
Buchanska community
Initiator
BUCHANA CITY COUNCIL
Housing Rehabilitation for Empowerment (HOPE)", Component 2: Design and Major Repair of Partially Damaged Apartment Buildings (BKB) in Buchanan Urban Territorial Community
Demolition of dilapidated buildings and new construction of low-rise residential buildings made of modern energy-efficient materials
Renovation according to the principle of “energy-efficient microdistrict” - comprehensive thermal modernization, installation of solar panels and local energy supply systems
The project is aimed at major repairs and restoration of partially damaged apartment buildings (AHU) within the Buchanan urban territorial community, which were damaged as a result of the armed aggression of the Russian Federation against Ukraine. The main measures include: repair of load-bearing structures, roofs, facades and internal engineering networks (heating, water supply, electricity supply, sewage); replacement or restoration of windows and doors using energy-saving materials; restoration of security systems, lighting and landscaping of adjacent areas; repair of common areas (stairwells, elevators, basements, technical rooms); ensuring a basic level of energy efficiency, in accordance with current state building standards (DBN V.2.6-31:2021). The project is implemented within the framework of the HOPE program with the support of international donors, the local budget and possible co-financing by residents. Its goal is to restore housing conditions for citizens as soon as possible, return property rights and create a safe living environment.
Budget2'193'606'589 UAH
Implementation period36 months