Increasing the stability and reliability of electricity transmission in Ukraine


Sector
Energy Sector
Stream
Creation of new, expansion, reconstruction, technical re-equipment of existing energy infrastructure facilities (high-voltage power transmission lines, substations, high-voltage equipment, etc.)
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
State level of SP
Implementation
Completion

General information

Description of the project

The project will include:

  • development of design documentation in accordance with current Ukrainian norms and standards;
  • construction of underground RPA devices at 16 substations, including those necessary for the substation's own needs;
  • supply of new RPA devices;
  • construction of underground cable ducts; installation and commissioning of the specified devices in new protected underground structures;
  • construction of a backup dispatch center;
  • (in case of availability of financing after other purchases) – purchase of transformer equipment and high-voltage external substations for use as a reserve stock. 

The purpose of the project

Main goal:

Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

The purpose of the project is to provide protection against hits by fragments of missiles, shells and in the event of a direct hit by a powerful charge (aircraft bomb, rocket, etc.) of critical elements of substations, the loss of which is equivalent to the loss of autotransformers - general substation control points (GCP) and relay panel buildings (RPB), which is planned to be implemented by constructing protected underground GCPs and RPCs with the replacement of outdated relay protection equipment and the implementation of automated process control systems (APCS) at substations at 16 substations and the construction of a backup dispatch center of the Unified State Electric Power System of Ukraine in a protected version.

Problems and solutions resulting from project implementation

NPC Ukrenergo has identified critical substations, the premises of relay panels and control points of which were damaged by attacks and require urgent restoration and protection. Due to the high risk of direct hits by missiles, drones or damage by blast waves to control panels located in above-ground buildings, the duty personnel of substations during an air alarm must urgently evacuate, and upon its completion, inspect the substation territory, which limits the controllability of the substation for a fairly long period. If the control panels are damaged, the controllability of the substation is lost. The free location of transformer equipment in an open space makes it vulnerable not only to direct hits, but also to shrapnel damage, which leads to the destruction of the mounted elements, leakage of transformer oil and an increased risk of its ignition. In turn, relay protection and emergency automation devices (P3A), AC and DC switchboards, and batteries located in above-ground buildings are easily damaged by building tremors. To achieve this goal, HEK "Ukrenergo" has launched a comprehensive substation automation program, which provides for their phased reconstruction with the construction of protective structures for autotransformers, protected underground 3PK and buried BRP with the introduction of automated process control systems (ACKTP) at substations.

Socio-economic context

Indicator

Value

Other economic

10017 thous. UAH

Strategic Case

Strategic feasibility of the project

Sector

Energy Sector

Subsector

Electric power industry

Stream

Creation of new, expansion, reconstruction, technical re-equipment of existing energy infrastructure facilities (high-voltage power transmission lines, substations, high-voltage equipment, etc.)

Strategic document

Energy Strategy of Ukraine until 2050

Task

Ensuring a stable, balanced model of operation of the Unified Power System of Ukraine; restoration, development and transformation of the power system, its sustainable operation;; increasing the efficiency of substations

Project objectives

Indicator
Base value
Target value
To construct underground protected buildings with the implementation of ASKTP at substations of NPC "Ukrenergo"
16 units
16 units
Economic justification

Alternative technical solutions

Technical Solution 1

Construction of protected substations and substation control systems, supply and installation of relay protection and automation devices at 16 selected substations, construction of a new backup dispatch center

Technical Solution 2

not provided

Total costs13'375'055'802 UAH4 UAH
  • For preparation
  • 96'570'800 UAH1 UAH
  • For implementation
  • 13'278'485'000 UAH1 UAH
  • For operation
  • 1 UAH1 UAH
  • For closing
  • 1 UAH1 UAH
    Average annual costs1 UAH1 UAH
    Project duration, incl.34 months2 months
  • Deadline for developing a FFS
  • 16 months1 month
  • Implementation period
  • 18 months1 month
    Service life480 months1 month
    Target indicatorsDefined Not defined
    Technical Solution Status
    Active
    Pending
    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget13'375'055'802 UAH4 UAH
    Capital costs13'375'055'802 UAH4 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation96'570'800 UAH1 UAH
    For implementation13'278'485'000 UAH1 UAH
    For operation1 UAH1 UAH
    For closing1 UAH1 UAH

    Average project cost per service recipient

    Service Unitне передбачено
    Service Unit Cost1 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds13'278'485'000 UAH0 UAH
    Management Rationale

    Risk assessment

    Technical riskDefinedUndefined
    Political riskDefinedUndefined
    Other riskDefinedUndefined

    Organizational events

    ResponseDefinedUndefined
    Results of the feasibility analysis
    Economic Analysis
    Social benefits and costs
    not defined
    Environmental benefits and costs
    not defined
    Indirect benefits and costs
    not defined