Sector
Energy Sector
Stream
Creation of new, expansion, reconstruction, technical re-equipment of existing energy infrastructure facilities (high-voltage power transmission lines, substations, high-voltage equipment, etc.)
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
State level of SP
Implementation
Completion
- Preparation
- General information
- Strategic Case
- Economic Case
- Financial Case
- Management Case
General information
Description of the project
The project will include:
- development of design documentation in accordance with current Ukrainian norms and standards;
- construction of underground RPA devices at 16 substations, including those necessary for the substation's own needs;
- supply of new RPA devices;
- construction of underground cable ducts; installation and commissioning of the specified devices in new protected underground structures;
- construction of a backup dispatch center;
- (in case of availability of financing after other purchases) – purchase of transformer equipment and high-voltage external substations for use as a reserve stock.
The purpose of the project
Main goal:
Improving the condition of infrastructure
Description of the purpose of the project and ways to achieve it
The purpose of the project is to provide protection against hits by fragments of missiles, shells and in the event of a direct hit by a powerful charge (aircraft bomb, rocket, etc.) of critical elements of substations, the loss of which is equivalent to the loss of autotransformers - general substation control points (GCP) and relay panel buildings (RPB), which is planned to be implemented by constructing protected underground GCPs and RPCs with the replacement of outdated relay protection equipment and the implementation of automated process control systems (APCS) at substations at 16 substations and the construction of a backup dispatch center of the Unified State Electric Power System of Ukraine in a protected version.
Problems and solutions resulting from project implementation
NPC Ukrenergo has identified critical substations, the premises of relay panels and control points of which were damaged by attacks and require urgent restoration and protection.
Due to the high risk of direct hits by missiles, drones or damage by blast waves to control panels located in above-ground buildings, the duty personnel of substations during an air alarm must urgently evacuate, and upon its completion, inspect the substation territory, which limits the controllability of the substation for a fairly long period. If the control panels are damaged, the controllability of the substation is lost. The free location of transformer equipment in an open space makes it vulnerable not only to direct hits, but also to shrapnel damage, which leads to the destruction of the mounted elements, leakage of transformer oil and an increased risk of its ignition. In turn, relay protection and emergency automation devices (P3A), AC and DC switchboards, and batteries located in above-ground buildings are easily damaged by building tremors.
To achieve this goal, HEK "Ukrenergo" has launched a comprehensive substation automation program, which provides for their phased reconstruction with the construction of protective structures for autotransformers, protected underground 3PK and buried BRP with the introduction of automated process control systems (ACKTP) at substations.
Socio-economic context
Indicator
Value
Other economic
10017 thous. UAH
Strategic Case
Strategic feasibility of the project
Sector
Energy Sector
Subsector
Electric power industry
Stream
Creation of new, expansion, reconstruction, technical re-equipment of existing energy infrastructure facilities (high-voltage power transmission lines, substations, high-voltage equipment, etc.)
Strategic document
Energy Strategy of Ukraine until 2050
Task
Ensuring a stable, balanced model of operation of the Unified Power System of Ukraine; restoration, development and transformation of the power system, its sustainable operation;; increasing the efficiency of substations
Project objectives
Indicator
Base value
Target value
To construct underground protected buildings with the implementation of ASKTP at substations of NPC "Ukrenergo"
16 units
16 units
Economic justification
Alternative technical solutions
Technical Solution 1
Construction of protected substations and substation control systems, supply and installation of relay protection and automation devices at 16 selected substations, construction of a new backup dispatch center
Technical Solution 2
not provided
Total costs13'375'055'802 UAH4 UAH
Average annual costs1 UAH1 UAH
Project duration, incl.34 months2 months
Service life480 months1 month
Target indicatorsDefined Not defined
Technical Solution Status
Active
Pending
Components of a technical solution
Financial justification
Total project budget
Total preliminary budget13'375'055'802 UAH4 UAH
Capital costs13'375'055'802 UAH4 UAH
Operational costs0 UAH0 UAH
Preliminary cost breakdown
Operating costs for implementation0 UAH0 UAH
For preparation96'570'800 UAH1 UAH
For implementation13'278'485'000 UAH1 UAH
For operation1 UAH1 UAH
For closing1 UAH1 UAH
Average project cost per service recipient
Service Unitне передбачено
Service Unit Cost1 UAH
Profitability of the project
Is the project expected to generate income?
ResponseNoNo
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Source and MechanismYesNo
Funding Sources
Approved Funds0 UAH0 UAH
Expected Funds13'278'485'000 UAH0 UAH
Management Rationale
Risk assessment
Technical riskDefinedUndefined
Political riskDefinedUndefined
Other riskDefinedUndefined
Organizational events
ResponseDefinedUndefined
Results of the feasibility analysis
Economic Analysis
Social benefits and costs
not defined
Environmental benefits and costs
not defined
Indirect benefits and costs
not defined