Energy Sector

The development of the energy sector has a decisive impact on the state of the national economy and the quality of life of the population.
This pipeline will present public investment projects and programs in the energy sector that align with the following areas: fossil fuels, renewable energy sources and alternative fuels, nuclear energy, electricity generation, and the oil and gas industry. These initiatives are aimed at supporting the implementation of the Energy Strategy of Ukraine. The Ministry of Energy of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 120'834'620'600 UAH, including funds from the State Fund for Decarbonization and Energy Efficiency Transformation in the amount of 6'930'983'900 UAH, and State Guarantees in the amount of 105'100'000'000 UAH
Responsible Ministry
MINISTRY OF ENERGY OF UKRAINE
Indicative total public investment ceiling
120.8 bln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches
Initiation date
Budget
Status
State level of SPP
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorOil and gas industry
StatusPreliminary Investment Feasibility Study

Strengthening its own oil service function by updating the fleet of specialized equipment of JSC "Ukrnafta"

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the quality of services
Geography
All Ukraine
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Renewal of the specialized equipment fleet of JSC "Ukrnafta" through procurement
Procurement of services from external contractors for relevant work
Budget6'530'000'003 UAH
Implementation period30 months
State level of SPP
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorOil and gas industry
StatusPreliminary Investment Feasibility Study

Purchase of KRS machines to increase the efficiency of capital repairs by our own forces and expand the operational well fund

Project goal
Capacity building. Increasing compliance with modern standards, Increasing compliance with modern standards, Creation of new facilities and services, Improving the quality of services
Geography
All Ukraine
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Purchase of 30 new KRS machines (65 tons - 26 units, 125 tons - 4 units)
Procurement of services of an external contractor for conducting RRC
Increasing the efficiency and complexity of performing routine and capital repairs of wells, which is a necessary condition for implementing the Company's strategic goals of increasing oil and gas production.
Budget1'407'000'003 UAH
Implementation period24 months
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusPreliminary Investment Feasibility Study

Comprehensive modernization of the oil refinery

Project goal
Capacity building. Increasing compliance with modern standards, Creation of new facilities and services, Rebuilding the damaged/destroyed, Improving the condition of infrastructure, Improving the quality of services
Geography
All Ukraine
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Comprehensive modernization of the oil refinery
Construction of a new oil refinery
The project involves a comprehensive modernization of the refinery with the replacement of a significant part of the oil refining equipment, increasing the depth of processing and increasing the design processing capacity from 6 to 11 million tons of oil per year. After the start of the full-scale invasion of Russian troops into Ukraine in February 2022, the main routes of oil and oil products in Europe and Ukraine were changed, which emphasized the need for self-sufficiency in energy, including the creation of the necessary levels of minimum reserves of oil and oil products.
Budget123'905'000'003 UAH
Implementation period48 months
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Construction of a new fuel and lubricants warehouse (underground storage)

Project goal
Improving the quality of services. Increasing compliance with modern standards, Поява нових виробничих потужностей
Geography
All Ukraine
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Construction of an underground storage facility
Construction of above-ground storage facilities - oil depots
The project involves the restoration of existing underground storage facilities for petroleum products and their adaptation for underground storage of gasoline and diesel fuel
Budget1'070'650'002 UAH
Implementation period36 months
State level of SPP
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorOil and gas industry
StatusPreliminary Investment Feasibility Study

Purchase of gas pumping units for JSC "Ukrtransgaz" (3 gas pumping units with a capacity of 13 MW)

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
All Ukraine
Initiator
JOINT STOCK COMPANY "UKRTRANSGAZ"
purchase of 3 HPA with a capacity of 13 MW
further use of existing equipment
The purchase of new gas storage units will ensure uninterrupted operation of the compressor shops of underground gas storage facilities and guaranteed gas withdrawal from the underground gas storage facilities at maximum productive levels, especially during critical periods.
Budget2'131'200'001,02 UAH
Implementation period27 months
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusPreliminary Investment Feasibility Study

Reconstruction of compressor stations at gas preparation facilities of JSC "Ukrnafta"

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Поява нових виробничих потужностей
Geography
Ivano-Frankivska region, Sumska region, Chernihivska region
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Summary of option evaluations
Payment of a fine for excess emissions after the expiration of current permits (2030)
potential object, solution, implementation and volume of financing
Budget15'336'300'000,02 UAH
Implementation period65 months
State level of SPP
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Construction of the 750 kV overhead line of the Zaporizhzhya NPP - Kakhovska

Project goal
Creation of new facilities and services.
Geography
All Ukraine
Initiator
PRIVATE JOINT STOCK COMPANY "NATIONAL ENERGY COMPANY "UKRENERGO"
Construction of the 750 kV overhead line of the Zaporizhzhya NPP - Kakhovska
Not provided
The main objective of the project "Construction of a 750 kV overhead line of Zaporizhia NPP - Kakhovka" (hereinafter referred to as the Project) is to increase the reliability of the southern operating modes of the Unified Power System of Ukraine by removing network restrictions on the output of the Zaporizhia NPP, stabilizing the voltage in the Southern and Crimean power systems (PS), and increasing the throughput capacity of the southern sections by strengthening the connection of the Kakhovka power node with the main networks of the Unified Power System of Ukraine.
Budget6'000'000'002 UAH
Implementation period180 months
State level of SPP
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a gas-fired power plant up to 10 MW (Supporting critical distributed generation Stage II: capacity expansion in Poltava region)

Project goal
Creation of new facilities and services. Capacity building, Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Developing new territories or functions, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Поява нових виробничих потужностей, Improving the quality of services, Reducing territorial or social gaps, Meeting demand
Geography
Poltavska region
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Construction of a modern gas-fired power plant with an installed capacity of up to 10 MW
Construction and commissioning of a solar power plant (SPP) with a capacity of 21 MW
Construction of a modern gas-fired power plant with an installed capacity of up to 10 MW based on the production capacities of a utility company in Poltava region. The plant will operate on natural gas and annually produce ≈40.9 GW·h of electricity for sale on the RDN during peak hours, provide auxiliary services to NPP «Ukrenergo», and also provide heat supply ≈11,153.7 Gcal/year for the needs of the community. GPM technology ensures quick starts/stops, operation in flexible modes, and effective balancing of RES.
Budget611'969'303 UAH
Implementation period18 months
State level of SPP
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a gas-fired power plant up to 20 MW (Supporting critical distributed generation Stage IV: capacity expansion in Lviv region)

Project goal
Capacity building. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Creation of new facilities and services, Developing new territories or functions, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Поява нових виробничих потужностей, Improving the quality of services, Reducing territorial or social gaps, Meeting demand
Geography
Lvivska region
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Installation of a gas-fired power plant up to 20 MW (Supporting critical distributed generation)
Construction of a 41.5 MW solar power plant
The project involves the construction of a modern gas-fired power plant with an installed capacity of up to 20 MW on the territory of the production facilities of the utility in the Lviv region. The plant will operate on natural gas and annually produce about 81.8 GWh of electricity, which will be supplied to the day-ahead market (DAB) in peak load mode, as well as to provide auxiliary services to NPP Ukrenergo. The installation of gas-fired power plants will increase the flexibility and stability of the Unified Energy System of Ukraine, reduce dependence on unstable electricity supplies and ensure effective integration of renewable energy sources. Due to their technical characteristics, the gas-fired power plants are able to start and stop quickly, operate in variable modes, which makes them an optimal tool for balancing the power system. The implementation of the project will contribute to the development of regional infrastructure, the creation of new jobs, increased energy security, and sustainable socio-economic development of the Lviv region.
Budget1'337'840'600 UAH
Implementation period24 months
State level of SPP
State level of SP
Date10. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a gas-fired power plant up to 10 MW (Supporting critical distributed generation Stage III: capacity expansion in Cherkasy region)

Project goal
Creation of new facilities and services. Capacity building, Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Developing new territories or functions, Rebuilding the damaged/destroyed, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Поява нових виробничих потужностей, Improving the quality of services, Reducing territorial or social gaps, Meeting demand
Geography
Cherkaska region
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Construction of a modern gas-fired power plant with an installed capacity of up to 10 MW
Construction and commissioning of a solar power plant (SPP) with a capacity of 21 MW
Construction of a modern gas-fired power plant with an installed capacity of up to 10 MW based on the production capacities of a utility company in Cherkasy region. The plant will operate on natural gas and annually produce ≈40.9 GW·h of electricity for sale on the RDN during peak hours, provide auxiliary services to NPP «Ukrenergo», and also provide heat supply ≈11,153.7 Gcal/year for the needs of the community. GPM technology ensures quick starts/stops, operation in flexible modes, and effective balancing of RES.
Budget612'063'431 UAH
Implementation period18 months