Modernization and restoration of hydroelectric power generation facilities of PrJSC "Ukrhydroenergo" (Support to the energy sector)


Sector
Energy Sector
Stream
Modernization/renovation of installed generating capacities
Project Status
Preliminary Investment Feasibility Study
Entry into Portfolio
State Single Project Pipeline
Investment Feasibility Study
Implementation
Completion

General information

Description of the project

Negotiations are currently underway with the European Bank for Reconstruction and Development to attract loan and grant financing in the amount of 120 million euros and 20 million euros, respectively, for the implementation of the project.

The main goal of the Project is to ensure the stable operation of PrJSC "Ukrhydroenergo" under martial law, as well as to carry out emergency and recovery replacement of equipment to increase operational reliability and trouble-free operation of four hydroelectric power plants of PrJSC "Ukrhydroenergo". The project is aimed at restoring the energy infrastructure in order to ensure the balance and integrity of the Ukrainian energy system, increase the energy security of the state and the economy as a whole.

The project will be implemented within the framework of the implementation of the approved project "HES Ukrhydroenergo. Reconstruction. Stage II. Correction», which passed the examination (expert report (positive) on the review of the design documentation for construction No. 00-1102/01-21 dated June 30, 2022).

The purpose of the project

Main goal:

Increasing compliance with modern standards

Secondary goal:

Rebuilding the damaged/destroyed

Description of the purpose of the project and ways to achieve it

In the conditions of martial law and taking into account the systematic attacks of the Russian Federation on the energy infrastructure of Ukraine, there is a need to purchase hydropower and generator, crane and hydromechanical equipment to ensure the stability of the operation of four hydroelectric power plants of PrJSC "Ukrhydroenergo", which will consequently support the stability and liquidity of PrJSC "Ukrhydroenergo". The main objective of the Project is to ensure the stable operation of PrJSC "Ukrhydroenergo" in the conditions of martial law, as well as to carry out emergency and recovery replacement of equipment to increase the operational reliability and trouble-free operation of four hydroelectric power plants of PrJSC "Ukrhydroenergo". The goal of the project will be achieved by financing capital costs for the turnkey supply (purchase, delivery to the construction site, installation and commissioning): - Two special gantry cranes (2x350 tons) for the Dniester HPP; - One gantry crane (2x225 tons) for Kaniv HPP; - Hydropower equipment (generator and turbine) hydro unit No. 17 for Dnipro HPP-2; - Hermetic (metal) covers over hydro units for Kyiv HPP and Kaniv HPP.

Problems and solutions resulting from project implementation

The need to ensure the stability of the operation of the Company's four hydroelectric power plants by purchasing hydropower equipment (turbine and generator) for the Dniprovska HPP branch, which was damaged as a result of the Russian military aggression in Ukraine, crane equipment for the Kanivska HPP and Dniester HPP branches, as well as hydromechanical equipment (overhead covers) for the Cascades of Kyiv HPPs and PSP branch, which has undergone significant physical wear and tear over the years of operation and has become obsolete, has been repaired many times and does not meet modern requirements for HPP equipment, which as a result will support the liquidity and financial stability of the Company and hydromechanical equipment (overhead covers) for the Kanivska HPP branch, which has undergone significant physical wear and tear over the years of operation and has become obsolete, has been repaired many times and does not meet modern requirements for HPP equipment. The result of solving the problems is to increase the efficiency of the work of PrJSC "Ukrhydroenergo" by installing new, more economical equipment. This will be achieved through: 1. Installation of hydropower and hydromechanical equipment, the operation of which affects the stability of the operation of hydraulic units by avoiding failures and emergency shutdowns; 2. Strengthening the financial position of PrJSC "Ukrhydroenergo" by preserving and increasing income from activities in the electricity market and by optimizing the operating modes of existing equipment. The introduction of the main part of the equipment within the project "Modernization and restoration of hydroelectric power plant generation facilities of PrJSC "Ukrhydroenergo"" will take place within the framework of the implementation of the approved project "HPP Ukrhydroenergo. Reconstruction. Stage II. Correction", which has passed the examination (expert report (positive) on the review of project documentation for construction No. 00-1102/01-21 dated June 30, 2022), which will reduce the time for developing tender documents for the purchase of such equipment.

Socio-economic context

Indicator

Value

Other economic

6747146000 UAH

Strategic Case

Strategic feasibility of the project

Sector

Energy Sector

Subsector

Electric power industry

Stream

Modernization/renovation of installed generating capacities

Strategic document

Energy Strategy of Ukraine until 2050

Task

null Implementation of measures to repair and modernize energy infrastructure

Project objectives

Indicator
Base value
Target value

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
119 MW
Economic justification

Alternative technical solutions

Technical Solution 1

Modernization and rehabilitation of hydroelectric power plants

Technical Solution 2

Modernization and rehabilitation of hydroelectric power plants (without grant)

Total costs6'747'346'000 UAH5'783'468'000 UAH
  • For preparation
  • 200'000 UAH200'000 UAH
  • For implementation
  • 6'747'146'000 UAH5'783'268'000 UAH
    Average annual costs0 UAH0 UAH
    Project duration, incl.72 months72 months
  • Deadline for developing a FFS
  • 12 months12 months
  • Implementation period
  • 60 months60 months
    Service life480 months480 months
    Target indicatorsDefined Defined

    Financial justification

    Total project budget

    Total preliminary budget6'747'346'000 UAH5'783'468'000 UAH
    Capital costs6'747'346'000 UAH5'783'468'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation200'000 UAH200'000 UAH
    For implementation6'747'146'000 UAH5'783'268'000 UAH
    For operation0 UAH0 UAH
    For closing0 UAH0 UAH

    Average project cost per service recipient

    Service UnitРозрахунки в рамках техніко-економічного обгрунтування проєкту згідно постанови КМУ № 809 від 15 червня 2011 р. в процесі
    Service Unit Cost0 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo