Emergency restoration of hydroelectric power stations


Sector
Energy Sector
Stream
Modernization/renovation of installed generating capacities
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
State Single Project Pipeline
Implementation
Completion

General information

Description of the project

Providing assistance to PrJSC "Ukrhydroenergo" in financing the supply and, with the consent of the Bank, the installation of critical equipment for the Dniprovska and Sredneodneprovska hydroelectric power plants, as well as (ii) providing emergency liquidity support to PrJSC "Ukrhydroenergo" in order to ensure the sustainability of its operations, as well as by supporting emergency liquidity and increasing the efficiency of PrJSC "Ukrhydroenergo", strengthening its financial position in the face of military risks and the deterioration of the Company's liquidity caused by the consequences of full-scale military aggression by the Russian Federation. 

The project will be implemented within the framework of the implementation of the approved project "Ukrhydroenergo HPP. Reconstruction. Phase II. Correction», which passed the examination (expert report (positive) on the review of the design documentation for construction No. 00-1102/01-21 dated June 30, 2022).

The purpose of the project

Main goal:

Increasing compliance with modern standards

Secondary goal:

Rebuilding the damaged/destroyed

Description of the purpose of the project and ways to achieve it

Providing assistance to Ukrhydroenergo PJSC in financing the supply and, with the Bank's consent, the installation of critical equipment for the Dniprovska and Sredneodneprovska hydroelectric power plants, and (ii) providing emergency liquidity support to Ukrhydroenergo PJSC in order to ensure the sustainability of its operations, as well as by supporting emergency liquidity and increasing the efficiency of Ukrhydroenergo PJSC, strengthening its financial position in the face of military risks and the deterioration of the Company's liquidity caused by the consequences of full-scale military aggression by the Russian Federation. The project objective will be achieved by (i) financing capital costs for the turnkey supply (purchase, delivery to the construction site, installation and commissioning): • four turbines and generators for Dniprovska HPP-1; • two gantry cranes for Sredneodneprovska HPP. (ii) by financing critical operating costs through payments for electricity transmission and dispatching services

Problems and solutions resulting from project implementation

Hydropower units of Dniprovska HPP-1 No. 4, 5, 6 and 7, which are planned to be replaced within the framework of the Project, are being used at the limit of their capabilities. During the period of operation, the impellers, under the influence of intense dynamic loads during transient regimes (start-ups, stops, load shedding, transition from synchronous compensator mode to generator mode and vice versa), have undergone significant cavitation damage and cracks. Repairs of impellers due to corrosion fatigue of the metal do not provide the desired result and at the same time are ineffective due to long downtime of the units, which leads to a decrease in the average annual capacity of the HPP. At the same time, in connection with the military aggression of the Russian Federation against Ukraine and the targeted destruction of civilian infrastructure, a series of missile strikes were launched at the Dnipro HPP, which led to the destruction of the equipment and premises of the HPP, constant tremors that lead to mechanical damage, and increase damage to the joints of the structures of the equipment of the hydraulic units. The service life of the gantry cranes at the Sredneodneprovska HPP, which are planned to be replaced as a result of the implementation of the Project, has been going on since the beginning of the construction of the HPP and exceeds 50 years. Due to outdated crane equipment, planned repairs and current works are disrupted, which leads to the destabilization of the operation of the HPP of PrJSC "Ukrhydroenergo" as a whole. The cranes that need replacement are intended for loading and unloading operations at the station site and the building of the Sredniodniprovska HPP and for maneuvering repair gates, emergency repair gates, and debris retention grilles of the shield wall of the upper head of the Sredniodniprovska HPP. Both new gantry cranes with a lifting capacity of 75+10t and 2x105/2x15/5t will be installed on the existing KR 120 crane tracks at the HPP, instead of the obsolete KS-50t and 2x50/2x15/5t cranes.

Socio-economic context

Indicator

Value

Capital expenditure per year

2481011024.25 UAH

Capital expenditure per year

3869956592.5 UAH

Capital expenditure per year

1460446104.5 UAH

Capital expenditure per year

538993186.25 UAH

Capital expenditure per year

1307248932 UAH

Strategic Case

Strategic feasibility of the project

Sector

Energy Sector

Subsector

Electric power industry

Stream

Modernization/renovation of installed generating capacities

Strategic document

Energy Strategy of Ukraine until 2050

Task

null Implementation of measures to repair and modernize energy infrastructure

Project objectives

Indicator
Base value
Target value
Economic justification

Alternative technical solutions

Technical Solution 1

Emergency restoration of hydroelectric power stations

Technical Solution 2

Emergency restoration of hydroelectric power stations

Total costs9'658'000'000 UAH9'658'000'000 UAH
  • For implementation
  • 9'658'000'000 UAH0 UAH
  • For operation
  • 0 UAH9'658'000'000 UAH
    Average annual costs1'931'600'000 UAH1'931'600'000 UAH
    Project duration, incl.72 months72 months
  • Deadline for developing a FFS
  • 12 months12 months
  • Implementation period
  • 60 months60 months
    Service life480 months480 months
    Target indicatorsDefined Defined
    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget9'658'000'000 UAH9'658'000'000 UAH
    Capital costs9'658'000'000 UAH9'658'000'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation0 UAH0 UAH
    For implementation9'658'000'000 UAH0 UAH
    For operation0 UAH9'658'000'000 UAH
    For closing0 UAH0 UAH

    Average project cost per service recipient

    Service UnitСередні прогнозовані ціни на електричну енергію у 2023 – 2039 рр. відповідно до ТЕО проєкту
    Service Unit Cost4'906 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds9'658'000'000 UAH0 UAH
    Expected Funds9'658'000'000 UAH0 UAH
    Management Rationale

    Risk assessment

    Other riskDefinedUndefined

    Organizational events

    ResponseDefinedUndefined
    Results of the feasibility analysis
    Economic Analysis
    Social benefits and costs
    The implementation of the project will ensure uninterrupted energy supply for the population
    Environmental benefits and costs
    The implementation of the project will ensure the restoration of damaged hydroelectric power plant equipment in order to increase the share of renewable energy sources.
    Indirect benefits and costs
    Strengthening financial sustainability and modernizing equipment increases the country's energy security, which, in turn, makes it possible to reduce dependence on external energy markets and ensure a rapid transition to renewable sources.