Drilling a well with the installation of a water purification and water treatment plant directly in the city of Lozova with the installation of a gas generating plant to cover its own needs in electrical energy and ensure the autonomous operation of the facility


Sector
Municipal infrastructure and services
Stream
Reconstruction, major repairs, new construction, restoration, development, modernization (including supply of equipment and materials) of facilities and networks of centralized water supply and wastewater disposal in Kharkiv, including with the introduction of alternative energy sources
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

Drilling an artesian well with a flow rate of approximately 250 m³/h in the city of Lozova, Kharkiv region, in order to ensure reliable and high-quality water supply for the city's residents.
The implementation of this project will allow creating a new source of water supply that will be decentralized, reliable and uninterrupted. This will contribute to increasing the stability of the city's water supply system, reducing dependence on existing worn-out water mains, and improving the quality of water supply for the population.

The purpose of the project

Main goal:

Improving the quality of services

Secondary goal:

Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

Drilling a new artesian well will create an additional reliable source of water supply for the city of Lozova.

Problems and solutions resulting from project implementation

Drilling a new artesian well will create an additional reliable source of water supply for the city of Lozova. The implementation of the project will ensure a stable water supply for the city's residents and reduce dependence on existing worn-out water mains. In addition, the implementation of a new source of water supply will increase the reliability of the entire water supply system of the city, reduce the risks of water supply interruptions and contribute to improving the quality of municipal services to the population

Socio-economic context

Indicator

Value

Number of people who will use the service

30 thous. people

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Water supply and sanitation

Stream

Reconstruction, major repairs, new construction, restoration, development, modernization (including supply of equipment and materials) of facilities and networks of centralized water supply and wastewater disposal in Kharkiv, including with the introduction of alternative energy sources

Strategic document

Регіональна стратегія розвитку

Task

14 Availability of quality centralized water supply and wastewater services for different groups of citizens, taking into account the latest technologies and the needs of territorial communities.

Project objectives

Indicator
Base value
Target value
Well construction
1 units
1 units

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Preliminary Investment Feasibility Study]

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Additionally, for the purpose of reserving the water supply system of the city.docx
13.03.2026
13:39:16 UTC

Alternative technical solutions

Technical Solution 1

Construction of a well in Lozova

Technical Solution 2

Not provided

Total costs217'500'000 UAH24'444 UAH
  • For preparation
  • 1'500'000 UAH1'111 UAH
  • For implementation
  • 210'000'000 UAH1'111 UAH
  • For operation
  • 2'500'000 UAH11'111 UAH
  • For closing
  • 3'500'000 UAH11'111 UAH
    Average annual costs2'500'000 UAH1'111 UAH
    Project duration, incl.11 months24 months
  • Deadline for developing a FFS
  • 2 months12 months
  • Implementation period
  • 9 months12 months
    Service life360 months120 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, both national and international

    [Response was provided in the Preliminary Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget217'500'000 UAH24'444 UAH
    Capital costs217'500'000 UAH24'444 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation1'500'000 UAH1'111 UAH
    For implementation210'000'000 UAH1'111 UAH
    For operation2'500'000 UAH11'111 UAH
    For closing3'500'000 UAH11'111 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    No
    [Response was provided in the Preliminary Investment Feasibility Study]

    Average project cost per service recipient

    Service Unitм.куб/людина
    Service Unit Cost7'000 UAH

    Profitability of the project

    Is the project expected to generate income?NoNo
    Is the project self-sustaining?No

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    No – analysis not performed

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    The project does not fall under the PPP format by its nature/character

    [Response was provided in the Preliminary Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Management Rationale

    Team competencies

    Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
    None of the options are applicable
    Does the team have experience implementing similar projects?
    Partially, we have limited experience

    [Response was provided in the Preliminary Investment Feasibility Study]

    Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
    None of the options are applicable
    Is there an understanding of where to find relevant experts and consultants?
    Partially, we are considering options

    [Response was provided in the Preliminary Investment Feasibility Study]

    Risk assessment

    Financial riskDefinedUndefined

    Organizational events

    ResponseDefinedUndefined
    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Is there ongoing cooperation or support within the framework of international technical assistance (ITA) or from other donor or government agencies?

    No
    [Response was provided in the Preliminary Investment Feasibility Study]

    Does the project require preparation assistance from Project Preparation Programs (PPF)?

    Development of a full feasibility study;
    [Response was provided in the Preliminary Investment Feasibility Study]
    Finalization of existing documentation for the preparation of a preliminary feasibility study
    [Response was provided in the Preliminary Investment Feasibility Study]
    Development of design and estimate documentation (DED);
    [Response was provided in the Preliminary Investment Feasibility Study]
    Need for financing

    Does the project require additional funding for preparation?

    No
    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Approval History

    DateDecision NumberPortfolioProject StatusDecisionReasons
    09/03/2026SP-L-090326-B8437F69Community SPPreliminary Investment Feasibility StudyInclude-