Bank fortification of the left bank of the Dniester River within the city of Sambor, Lviv region (New construction)


Sector
Environment
Stream
Ensuring protection against the harmful effects of water on settlements, creating safe living conditions for the population (river bank fortification)
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

         The project involves the new construction of shoreline protection structures on the left bank of the Dniester River within the city of Sambor in order to prevent erosion of the coastline, protect the coastal area, engineering and residential infrastructure from flooding and destruction, as well as improve the ecological condition of the water body. The project implementation includes the implementation of a complex of engineering and hydraulic works, in particular, strengthening the coastline with a stone cape, installing protective dams and drainage structures. It is expected that the project will reduce the risks of flood damage, increase the level of public safety and contribute to the sustainable development of the coastal zone of the city.

The purpose of the project

Main goal:

Contribution to climate or environmental goals

Secondary goal:

Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

The purpose of the project: to ensure the protection of the coastal area and engineering infrastructure of the city of Sambor from destruction and flooding by constructing bank fortifications on the left bank of the Dniester River. To achieve this goal, a complex of engineering and hydraulic works is planned, in particular: strengthening the coastline with a stone cape, installing retaining structures and protective dams, installing drainage channels, conducting planning and drainage works. The implementation of these measures will allow stabilizing the riverbed, preventing erosion processes and minimizing the risks of flooding of adjacent territories. Today, the left bank of the Dniester River within the city of Sambor is experiencing intense erosion and erosion, which poses a threat to residential buildings, road infrastructure and municipal facilities. The lack of effective bank fortifications leads to annual losses and environmental risks. The implementation of the project will eliminate these hazards, achieving the target state - a stabilized coastal slope, reducing the risk of flooding, and increasing the level of safety for the population and infrastructure facilities.

Problems and solutions resulting from project implementation

The key problems that the project implementation should solve are the intensive erosion of the left bank of the Dniester River, the danger of flooding of coastal areas, the destruction of protective embankments and the threat of damage to residential buildings and engineering infrastructure facilities of the city of Sambor. These problems are especially relevant in the context of increasing flood frequency and changing climate conditions, which cause an increase in the water level in the river and an increase in destructive processes. If the situation is not resolved, further destruction of the coastline, loss of land plots, damage to utility networks, flooding of residential areas and deterioration of the ecological state of the aquatic environment are possible. The implementation of the project will ensure stabilization of the riverbed, reduction of the risk of flood damage, increase the level of population safety and preservation of the natural environment, which will contribute to the sustainable development of the urban area.

Socio-economic context

Indicator

Value

Number of IDP users

150 human

Number of people who will use the service

5000 human

Population in the geographical area of influence of the project

37000 human

Number of IDPs in the geographical area of impact of the project

3600 human

Strategic Case

Strategic feasibility of the project

Sector

Environment

Subsector

Water protection, water management development, flood risk mitigation, centralized water supply, management, use and restoration of surface water resources

Stream

Ensuring protection against the harmful effects of water on settlements, creating safe living conditions for the population (river bank fortification)

Strategic document

Task

Operational objective 2.2 Improving the ecological state of the environment Task 2.2.3 Land improvement, preservation and expansion of the nature reserve fund

Project objectives

Indicator
Base value
Target value
Reducing the risk of flooding of residential buildings and infrastructure facilities
0 %
80 %
Improving the safety of the population of coastal areas
0 human
5000 human

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
6 ha
Annual demand for services/infrastructure
2
5 ha
Economic justification

Alternative technical solutions

Technical Solution 1

Bank fortification of the left bank of the Dniester River within the city of Sambor, Lviv region (New construction)

Technical Solution 2

Carrying out current repairs to the shore without the construction of new engineering structures

Total costs90'755'698 UAH90'755'698 UAH
  • For preparation
  • 500'000 UAH500'000 UAH
  • For implementation
  • 90'255'698 UAH90'255'698 UAH
    Average annual costs45'000'000 UAH45'000'000 UAH
    Project duration, incl.24 months24 months
  • Deadline for developing a FFS
  • 2 months2 months
  • Implementation period
  • 22 months22 months
    Service life360 months360 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active
    Rejected
    Components of a technical solution
    To components
    2
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget90'755'698 UAH90'755'698 UAH
    Capital costs90'755'698 UAH90'755'698 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation500'000 UAH500'000 UAH
    For implementation90'255'698 UAH90'255'698 UAH
    For operation0 UAH0 UAH
    For closing0 UAH0 UAH

    Average project cost per service recipient

    Service Unit1 погонний метр берегоукріплення
    Service Unit Cost179'159 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH
    Management Rationale

    Risk assessment

    Financial riskDefinedUndefined

    Organizational events

    ResponseDefinedUndefined
    Results of the feasibility analysis
    Economic Analysis
    Social benefits and costs
    The project implementation will reduce the risk of flooding and destruction of residential buildings and infrastructure, which will increase the safety and comfort of life of the local population. The project will contribute to the preservation of land and the improvement of agricultural conditions in coastal areas. In addition, the creation of new jobs during construction will strengthen social stability and economic activity of the community.
    Environmental benefits and costs
    The project of bank fortification of the left bank of the Dniester River within the city of Sambora stabilizes the coastline and prevents erosion, reducing soil erosion and land loss. The implementation of a controlled channel and fortifications reduces the negative impact of floods on nearby ecosystems, preserves biodiversity and improves water quality by reducing sediment and pollution. Partial landscaping of the territory and the organization of a green coastal zone contribute to the restoration of vegetation, stabilization of the microclimate and long-term preservation of the natural conditions of the coastal strip.
    Indirect benefits and costs
    Indirect benefits of the project include increased safety and comfort of living of the population, which reduces social costs for eliminating the consequences of floods and infrastructure destruction. The implementation of the bank protection will contribute to increasing the attractiveness of the territory for investments and the development of local tourism, which has a positive impact on the community economy. It is also expected to reduce long-term costs for the repair and restoration of land and infrastructure facilities, which reduces the financial burden on the local budget.