Sambirska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
22
Projects
Projects by sectors
22
Projects
Projects by goal
22
Projects
Projects by status
819,90 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Purchase of a school bus to ensure unhindered access to quality education in the Sambir territorial community

Project goal
Improving the equality of wealth distribution. Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Sambir city
Initiator
DEPARTMENT OF EDUCATION OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Purchase of a specialized school bus
To conclude an agreement with private carriers for regular transportation of students from rural settlements
Ensuring the stable operation of general secondary education institutions in rural areas
The purchase of a specialized school bus will allow for regular and safe transportation of students from rural settlements of the community to secondary education institutions. The bus will be equipped with inclusion in mind, ensuring access for children with special needs. Using the bus for organized excursions and extracurricular activities will contribute to the comprehensive development of students. This solution is cost-effective and reduces the burden on the local budget compared to constant financing of private carriers or maintaining understaffed schools.
Budget4'200'000 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date10. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" reform in the Sambir urban territorial community

Project goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services
Geography
Sambir city
Initiator
DEPARTMENT OF EDUCATION OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Providing secondary education institutions with teaching aids and equipment within the framework of the implementation of the "New Ukrainian School" in the Sambir urban territorial community
Partial update of old equipment
Using only laptops without stationary workstations
The project involves providing secondary education institutions of the Sambir urban territorial community with modern teaching aids and computer equipment as part of the implementation of the "New Ukrainian School" reform. It is planned to purchase new workstations, multimedia panels and interactive equipment for classrooms. The installation of modern equipment will improve the quality of the educational process and integrate digital resources into the educational process. The project covers 12 schools in the community, ensuring equal access for all students to modern educational technologies.
Budget2'025'000 UAH
Implementation period8 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnvironment
SubsectorWaste management, including radioactive waste
StatusInvestment Feasibility Study

Reconstruction of the MSW landfill in Sambor, Lviv region. Correction

Project goal
Contribution to climate or environmental goals. Capacity building, Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Sambir city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION AND HOUSING AND UTILITIES OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Reconstruction of the MSW landfill in Sambor, Lviv region
Complete liquidation of the landfill with transportation of waste to other landfills
Partial reclamation without modernization of engineering systems
The comprehensiveness of environmental problem solving is guaranteed by the implementation of a set of technological, organizational and other measures. To ensure the regulatory state of the environment and environmental safety, the project envisages developing 2 solid waste storage maps with the installation of protective dams, building a waste sorting complex, a leachate disinfection station, water supply ditches, control ponds, a drainage system for leachate removal, a weighing station, structures for protection against spontaneous combustion of waste and atmospheric pollution, a power plant, and access roads.
Budget92'582'729 UAH
Implementation period24 months
Local level of SPP
Local level of SP
Date11. 2025
SectorEnvironment
SubsectorWater protection, water management development, flood risk mitigation, centralized water supply, management, use and restoration of surface water resources
StatusInvestment Feasibility Study

Bank fortification of the left bank of the Dniester River within the city of Sambor, Lviv region (New construction)

Project goal
Contribution to climate or environmental goals. Improving the condition of infrastructure
Geography
Sambir city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION AND HOUSING AND UTILITIES OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Bank fortification of the left bank of the Dniester River within the city of Sambor, Lviv region (New construction)
Carrying out current repairs to the shore without the construction of new engineering structures
Strengthening the bank of the Dniester River by planting vegetation with a deep root system and using bioengineered structures (fascines, gabions made of natural materials) without the use of concrete or metal reinforcements
The project involves the new construction of a bank fortification on the left bank of the Dniester River within the city of Sambor, Lviv region. The main goal is to protect coastal areas and infrastructure facilities from destruction, flooding and landslides caused by floods and erosion processes. The works include strengthening the coastline with gabion structures, installing drainage structures and partial improvement of the adjacent territory. The implementation of the project will contribute to reducing the risk of emergencies, preserving land and improving the ecological condition of the water body. The planned measures meet the requirements of environmental safety and sustainable development of the community. The bank fortification is designed as a retaining wall of individual construction with a length of . on bored piles with a bulk dam, the wall is designed with a height of prefabricated reinforced concrete slab blocks. The wall is designed with sections with a length of grillage . In the upper part of the wall, along its entire length, a monolithic concrete parapet of variable height is provided for the safety of pedestrians and vehicles. The project provides for the straightening of the riverbed - changing the flow dynamics prevents the destruction of the bank.
Budget90'755'698 UAH
Implementation period24 months
Local level of SPP
Local level of SP
Date11. 2025
SectorSocial sector
SubsectorChildren’s Rights and Best Interests
StatusInvestment Feasibility Study

Providing housing for orphans, children deprived of parental care and persons from their number

Project goal
Reducing territorial or social gaps. Increasing compliance with modern standards
Geography
Sambirska community, Sambir city
Initiator
CHILDREN'S AFFAIRS SERVICE OF THE EXECUTIVE COMMITTEE OF THE SAMBIRA CITY COUNCIL
purchase of housing for orphans, children deprived of parental care and persons from their number
cash compensation for housing rental
construction of new housing
The project involves the purchase of housing in multi-apartment residential buildings that have been put into operation
Budget787'320 UAH
Implementation period15 months
Local level of SPP
Local level of SP
Date11. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Emergency restoration works (overhaul) of the maternity ward building of the KNP SMR "Sambir Central Hospital" at 4 Sichovykh Striltsiv St. in Sambor, Lviv region

Project goal
Improving the quality of services. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the equality of wealth distribution, Ensuring inclusiveness and equal opportunities
Geography
Biskovytska community, Novokalynivska community, Ralivska community, Sambirska community, Sambir city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION AND HOUSING AND UTILITIES OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Emergency and restoration works (overhaul) of the maternity ward building of the KNP SMR "Sambir Central Hospital" at 4 Sichovykh Striltsiv Street in Sambor, Lviv region
Current repairs without energy efficiency measures
Construction of a new maternity ward
The maternity ward of the KNP SMR “Sambir Central Hospital” serves residents of the Sambir, Ralivska, Biskovitska and Novokalynivska territorial communities. The total service area of the institution has 102,987 residents. During 2022, over 600 children were born in the institution. Currently, the maternity ward in the city of Sambir does not allow for comfortable conditions for the stay of patients and the work of medical and technical personnel. The project «Emergency and restoration work (overhaul) of the building of the maternity ward of the KNP SMR “Sambir Central Hospital” on S. Striltsiv Street in the city of Sambir, Lviv region» provides for the replacement of the roof covering with insulation, the installation of elevator equipment, the redevelopment of the premises with the installation of comfortable wards with separate sanitary rooms, the replacement of engineering networks and the installation of a fire protection system taking into account the safety requirements for civil defense protective structures, the accessibility of the building and premises, exits and routes of the building for people with disabilities and other groups of people with reduced mobility in accordance with building codes and regulations.
Budget110'772'039 UAH
Implementation period24 months
Local level of SPP
Local level of SP
Date11. 2025
SectorCulture and information
SubsectorCultural Heritage and National Memory
StatusInvestment Feasibility Study

Repair and restoration works of the architectural monument of national importance of the 17th-19th centuries (protected No. 399) - the Town Hall building at Rynok Square, 1 in Sambor, Lviv region

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Sambir city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION AND HOUSING AND UTILITIES OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Repair and restoration works of the architectural monument of national importance of the 17th-19th centuries (protection number 399) - the Town Hall building at 1 Rynok Square in the city of Sambor, Lviv region
Partial restoration of the building of the architectural monument of national importance, the Town Hall at 1 Rynok Square in the city of Sambor, Lviv region
Conservation and temporary closure of the facility
The project involves carrying out comprehensive repair and restoration works on the Town Hall building in the city of Sambor, which is an architectural monument of national importance of the 17th-19th centuries (protected No. 399) and has important historical, cultural and administrative value for the community. The goal of the solution is to preserve the authentic appearance of the historical building, ensure its structural stability, functional restoration and create safe operating conditions. The following main activities are planned: restoration and repair work of facades and decorative elements, including cleaning, restoration of plaster, stucco, stone and metal parts; repair of the roof and clock tower, replacement of damaged roof elements using authentic materials; strengthening of load-bearing structures of walls, ceilings and foundations using technologies compatible with the historical fabric of the building; restoration of interiors, including historical joinery, windows, doors, decorative finishes and floors; renewal of engineering networks (electricity, heating, water supply, drainage) without violating architectural authenticity; installation of a drainage system and waterproofing of foundations to prevent further destruction of walls and basements; ensuring barrier-free access for visitors and employees (equipment of a ramp, convenient entrances, sanitary facilities); restoration of the tower clock mechanism and restoration of the observation balcony.
Budget97'790'600 UAH
Implementation period24 months
Local level of SPP
Local level of SP
Date11. 2025
SectorCulture and information
SubsectorCultural Heritage and National Memory
StatusInvestment Feasibility Study

Restoration and repair works of the architectural monument of local importance of 1904 (registration number 2523-m) of the People's House at 6 Kopernika Street in Sambir, Lviv region

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the quality of services
Geography
Sambir city
Initiator
DEPARTMENT OF CULTURE OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Restoration and repair works of the architectural monument of local importance of 1904 (registration number 2523-m) of the People's House at 6 Kopernika Street in Sambir, Lviv region
Major renovation with partial reconstruction of the People's House building
Partial conservation and local repair of the People's House building
The project involves the restoration and repair of the People's House building, a monument of local importance from 1904 (registration number 2523-m), located at: Kopernika St., Sambir, Lviv region. The work includes the restoration of facades, roofs, load-bearing structures, decorative elements and interior spaces, in particular the arrangement of a concert hall with a stage. The project also involves the modernization of engineering networks and the installation of security systems (electricity, ventilation, fire alarm, lighting), which will ensure the safe and effective functioning of the facility. The implementation of the project will allow preserving the historical and architectural value of the building, increasing the social and cultural activity of the community, and making the People's House accessible to all groups of the population, including those with limited mobility.
Budget36'976'270 UAH
Implementation period24 months
Local level of SPP
Local level of SP
Date11. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Restoration (reconstruction) of filtration fields with replacement of centralized wastewater networks in the city of Sambir, Lviv region

Project goal
Contribution to climate or environmental goals. Capacity building, Increasing compliance with modern standards, Creation of new facilities and services, Improving the equality of wealth distribution, Improving the condition of infrastructure
Geography
Sambir city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION AND HOUSING AND UTILITIES OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Restoration (reconstruction) of filtration fields with replacement of centralized wastewater networks in the city of Sambir, Lviv region
Complete decommissioning of existing filtration fields and temporary diversion of wastewater to temporary storage tanks or mobile treatment plants
Partial conservation of existing filtration fields without complete reconstruction
The project involves the restoration (reconstruction) of filtration fields in the city of Sambir with the simultaneous replacement of worn-out centralized sewage networks that ensure the transportation of wastewater to treatment facilities. The works include a comprehensive modernization of the treatment infrastructure, restoration of soil filter cards, replacement of collectors and pipelines, and installation of wastewater flow control and regulation systems. The implementation of the project will ensure increased treatment efficiency, reduced environmental burden on the environment, elimination of risks of accidents and flooding, as well as improved quality of wastewater services for the population and enterprises of the city. The project will contribute to the sustainability of water infrastructure, adaptation to climate challenges, and meet modern sanitary and environmental requirements.
Budget43'400'000 UAH
Implementation period24 months
Local level of SPP
Local level of SP
Date11. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Application of solar energy for the needs of increasing the reliability of the water supply and wastewater systems of the city of Sambir (construction of a solar power plant at stations I and II of the Sambir VUVKG lift)

Project goal
Introducing innovations and energy-efficient solutions. Contribution to climate or environmental goals, Increasing compliance with modern standards, Creation of new facilities and services, Improving the condition of infrastructure, Improving the quality of services
Geography
Sambir city
Initiator
DEPARTMENT OF CAPITAL CONSTRUCTION AND HOUSING AND UTILITIES OF THE EXECUTIVE COMMITTEE OF SAMBIR CITY COUNCIL
Application of solar energy to increase the reliability of the water supply and wastewater systems of the city of Sambir (construction of a solar power plant at stations I and II of the Sambir VUVKG lift)
Installing a solar power plant at only one lift station or with a lower capacity.
Replacing equipment and pumps with energy-efficient ones without installing a solar power plant
The project involves the construction of an industrial solar power plant at stations I and II of the Sambirsk VUVKG lift to ensure partial or full coverage of the electricity consumption of pumping stations and technological sites of the enterprise. The main goal is to increase energy independence and stability of the critical water supply and wastewater infrastructure, reduce the risks of water supply interruptions and optimize electricity costs. The solar power plant will ensure stable energy supply to pumping units during peak loads and emergencies, reduce electricity costs and reduce CO₂ emissions, which is in line with the goals of sustainable development and the climate obligations of the community. The project involves integrating the solar power plant with the existing dispatching and energy management system of the enterprise, which allows for automatic regulation of the operation of pumps depending on the solar energy generated. Installing solar power plants at two lifting stations ensures scalability and redundancy of the generated energy, which increases the reliability of water supply and wastewater disposal for the entire city. Thanks to an integrated approach, including connection to the grid and a monitoring system, the enterprise receives long-term cost savings, reduced environmental impact, and strengthened energy security of the community.
Budget9'320'000 UAH
Implementation period12 months

In focus

All news