Installation of a gas-fired power plant up to 10 MW (Supporting critical distributed generation Stage III: capacity expansion in Cherkasy region)
- Preparation
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
General information
Description of the project
Experience and track record
Within the framework of the power generation project, Ukrnafta has demonstrated significant progress in the implementation of the emergency distributed energy generation project (Stage I):
- Locations have been agreed and permission has been obtained from local state administration bodies for the placement of 70 MW of installed capacity, including gas piston units, in Lviv, Poltava and Cherkasy regions;
- A loan of EUR 80 million has been secured from the EBRD for the implementation of the project. The loan agreement has been signed, and the procedure for purchasing equipment on the EBRD platform is ongoing. The state guarantee to secure the loan has been confirmed.
Project «Support for Critically Needed Distributed Generation Stage III: Capacity Expansion in Cherkasy Region (hereinafter – Project)
Rationale
The energy shortage in Ukraine due to Russian attacks has been critical, leading to significant disruptions in the country's energy sector. The attacks have led to the loss of electricity, heating and other critical services. More than 40% of Ukraine's energy infrastructure, or more than 1,000 energy facilities, has been damaged or destroyed since the beginning of the Russian invasion in February 2022, in particular as a result of missile and drone attacks targeting power plants, substations and the electricity grid. According to various estimates, this has led to the loss of about 8 GW of generating capacity. Daily power outages have affected millions of Ukrainians and businesses, with some regions experiencing power outages lasting up to 12 hours a day or even longer at times. Estimates of the cost of restoring power facilities range up to $5 billion. In response to the above challenges, supported by its own gas production capacity, Ukrnafta has decided to develop power generation capacity. The Wärtsilä gas piston plant technologies planned for this project are well suited for flexible modes with frequent starts and stops, and can therefore effectively cooperate with renewable energy installations and provide system services. Thus, gas-fired power plants can also provide so-called auxiliary services for balancing the power system, in particular during hours of no wind (for wind power plants) or lack of sunlight (for solar power plants). During the implementation of the capacity expansion project for the Support of Critically Necessary Distributed Generation Stage III in Cherkasy region, it is expected to install an additional gas-fired power plant manufactured by Wärtsilä capacity of up to 10 MW at the power plant site developed at Stage I. All necessary communications and preparatory work will be completed during the first stage, which will simplify the installation and commissioning of the additional gas-piston unit at Stage III.
Expected production volume
The implementation of the project will provide an additional 40-74 GWh annually (depending on the operating mode) for the network and 11,154-29,770 Gcal of heating for a city with a population of over 200 thousand inhabitants.
Completion level
Since the Project is an expansion stage of the «Support of critical distributed generation», the current status of the main project is as follows: Land plots with optimal conditions and access to the necessary networks have been selected and approved by local state authorities administration. Most of the technical specifications have been finalized and secured. EBRD financing has been successfully obtained. The tender process for the procurement of the main equipment and the design, installation and commissioning works of Stage I has been launched through the EBRD platform. The project “Support to Critically Needed Distributed Generation” (Stage I) is expected to be completed by Q2-Q3 2027, depending on the tender results. The implementation of the Project (Stage III) is subject to receiving support from the Finnish-Ukrainian Investment Fund (FUIF).
Technical Solution
Wärtsilä can be considered as the supplier of the main equipment - the gas piston unit - for this project. The company's track record includes 79 GW of power plant capacity in 180 countries around the world, and Wärtsilä has been the oldest original equipment manufacturer (OEM) for spark-ignition and reciprocating engine power plants since 1992. Its cogeneration plants are characterized by high efficiency, reliability and fuel flexibility, which is a decisive factor for energy projects. Wartsila technologies ensure optimal fuel use, reducing operating costs and CO₂ emissions, which meets modern environmental standards. In addition, their engines have fast start-up times, which increases the stability and flexibility of energy systems. Wartsila has extensive experience in implementing similar projects around the world, including industrial cogeneration plants and district heating solutions. Their technical support and service network help minimize operational risks and ensure stable operation of the equipment throughout its entire life cycle. All these factors made Wartsila the optimal choice for our projects.
The purpose of the project
Main goal:
Creation of new facilities and services
Secondary goal:
Capacity building, Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Developing new territories or functions, Rebuilding the damaged/destroyed, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Поява нових виробничих потужностей, Improving the quality of services, Reducing territorial or social gaps, Meeting demand
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of jobs, including for IDPs
17 workplaces
Population in the geographical area of influence of the project
1.1 mln people
Strategic Case
Strategic feasibility of the project
Sector
Energy Sector
Subsector
Electric power industry
Stream
Construction of new generating capacities
Strategic document
Energy Strategy of Ukraine until 2050
Task
Creation of new generating capacities to ensure the reliability of energy supply, increase energy security and sustainable development of the energy system of Ukraine
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Державна служба статистики України (щорічні енергетичні баланси та показники теплопостачання); Дані оператора системи передачі (НЕК «Укренерго») та оператора ринку;
Does the demand forecast take into account the latest demographic and economic forecasts?
Так, при оцінці враховано останні демографічні прогнози (Держстат, ООН) із тенденцією до зниження чисельності населення регіону, а також економічні прогнози Мінекономіки України щодо відновлення промислових підприємств після 2025–2026 років. Це відображено у сценарних розрахунках попиту.
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Запровадження плану переробки відходів на території проекту.
Використання енергії з більш ефективним ККД завдяки когенерації
Запровадження сучасних когенераційних технологій з використанням найкращих практик. Контроль викидів, шуму та якості повітря. Використання відносно чистої енергії.
Обладнання відповідатиме найкращим доступним практикам і стандартам ЄС. система сухого охолодження турбін, що зменшує споживання води
План управління біорізноманіттям, компенсаційні заходи при будівництві, мінімізація впливу на довкілля
Проект передбачає встановлення джерел електрогенерації з мінімальними викидами СО2
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Проєкт передбачає встановлення систем моніторингу викидів (NOx, СО), що відповідають вимогам ЄС та України.
Станція забезпечить стабільне енергопостачання навіть в умовах пікових навантажень чи кліматичних аномалій (спека, холодні зими).
Використання когенерації (електроенергія + тепло) дозволяє максимально ефективно використовувати паливо.
• Завдяки високому ККД (до 43,0%) нова ТЕЦ з ГПУ (газопоршневими машинами) зменшує питомі викиди СО₂ та скорочує споживання природного газу у порівнянні із застарілою ТЕЦ.
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
ev635n3n-wr56-4fd4-82e5-v76d5xta4a5f
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Будівництво ПГТЕЦ відноситься до діяльності, що підлягає обов’язковій оцінці впливу на довкілля відповідно до Закону України «Про оцінку впливу на довкілля». ОВД буде проведено на етапі проєктування.
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Проект запроваджує політики рівних можливостей і недискримінації, рівний доступ до робочих місць, програми навчання
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Активно залучено громаду та муніципалітет, всіх зацікавлених сторін
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
10%
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
Construction of a modern gas-fired power plant with an installed capacity of up to 10 MW
Technical Solution 2
Construction and commissioning of a solar power plant (SPP) with a capacity of 21 MW
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Investment Feasibility Study]
Проєкт має високий рівень привабливості для постачальників і підрядників у сфері енергетичного будівництва. Очікується достатня кількість учасників тендерних процедур, що забезпечить реальну конкуренцію та стимулюватиме учасників впроваджувати інноваційні рішення, оптимізувати витрати й строки реалізації, а також підвищувати якість пропозицій
[Response was provided in the Investment Feasibility Study]
Проєкт становить інтерес і для малих та середніх підприємств (МСП). Вони можуть бути залучені до виконання локальних будівельних, монтажних, електротехнічних робіт, забезпечення логістики, постачання матеріалів і допоміжного обладнання, а також надання сервісних послуг під час експлуатації станції. Це сприятиме розвитку місцевого бізнесу та створенню додаткових робочих місць у регіоні.
[Response was provided in the Investment Feasibility Study]
Реалізація проєкту передбачає залучення як міжнародних, так і національних компаній. Іноземні постачальники, зокрема Wärtsilä (Фінляндія), можуть забезпечити поставку основного генеруючого обладнання (газопоршневих двигунів), тоді як українські підприємства виконуватимуть будівельно-монтажні та електромонтажні роботи, виготовлення металоконструкцій, постачання допоміжних систем і проведення пуско-налагоджувальних робіт. Такий підхід дозволяє поєднати міжнародний технологічний досвід із локальними компетенціями та ресурсами.
[Response was provided in the Investment Feasibility Study]
Аналіз можливих варіантів закупівель основного обладнання проводився самостійно на основі відкритих даних офіційних сайтів провідних виробників газопоршневих установок (Wärtsilä, MWM, Caterpillar). Результати підтвердили доцільність обраного технічного рішення з огляду на ефективність, строки постачання та відповідність вимогам українського ринку.
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
основний інструмент для закупівлі обладнання та будівельних робіт
[Response was provided in the Investment Feasibility Study]
Обрані вище процедури відповідають вимогам законодавства України, забезпечують достатню гнучкість для роботи з різними категоріями закупівель.
[Response was provided in the Investment Feasibility Study]
можливий для складних інтеграційних рішень (системи управління, екологічний моніторинг)
[Response was provided in the Investment Feasibility Study]
застосовуватимуться у випадках високоспеціалізованого обладнання або в умовах термінових закупівель (наприклад, постачання запчастин від виробника)
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Preliminary cost breakdown
Average project cost per service recipient
Profitability of the project
Is the project expected to generate income?
Availability of services
[Response was provided in the Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Team competencies
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
соціальний та гендерний аналіз в повному обсязі
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
консультації з громадськістю в повному обсязі
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
екологічна експертиза в повному обсязі
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Cтруктуру управлінської команди проєкту визначено: призначено керівника проєкту, сформовано та офіційно затверджено проєктну команду з фахівцями по напрямкам з визначенням відповідних повноважень для можливості реалізації проєкту
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Social/gender consultants
Risk assessment
Organizational events
Team involvement
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]