Overhaul of the boiler control automation KVGM-50-150M at the Lazurny boiler house at 86 Bilenkivska Street in Kramatorsk


Sector
Municipal infrastructure and services
Stream
Restoration, modernization and development of the centralized and decentralized heat supply system
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The control and automation system is distributed and multi-level. The control of the parameters provided is performed both locally - by direct-acting devices, and using converters and secondary devices installed on the KVP and A panels. The control of the actuators is possible both manually locally and remotely, or automatically from the Shcha and Shcha boards. The automation systems are based on microprocessor technology, the basis of which is a programmable logic controller (PLC). The project provides for the use of the PLC LOGICONT-S200 manufactured by OOO "IX-Techno". The PLC LOGICONT-S200 has a modular design, the ability to use local and distributed input-output structures, wide communication capabilities, a variety of functions supported at the operating system level, high ease of operation and maintenance. This ensures optimal solutions for building automatic control systems for technological processes.
The automation system provides input, output, and primary processing of analog and discrete signals according to programmed algorithms. 
All signals about the parameters and status of the equipment are output to the controller, from where they are transmitted to the active HMI panel (located on the control panel) to allow the operator 
to visualize data about the status of the equipment and control it. An automated workplace (AWP) is also connected to the controller to monitor the technological parameters of the furnace. 
Automatic regulation, blocking protection, and signaling are implemented at the controller level and operate independently of the upper levels.

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Capacity building, Improving the quality of services

Description of the purpose of the project and ways to achieve it

Given the requirements for the automation object and its operating conditions, in order to obtain a highly reliable thermoelectric source with high technical and economic indicators, the control system is implemented as an automated control system based on the use of microprocessor technology. The control system provides centralized control and management of the main and auxiliary equipment in all operating modes, with the implementation of control, autoregulation, discrete control, signaling, technological protection and blocking functions. The scope of control, autoregulation, discrete control, signaling and technological protection meet the requirements of the following regulatory documents of Ukraine: "Rules for the construction and safe operation of steam and water heating boilers" NPAOP 0.00–1.60– 66; "Typical technical requirements for the station level of the APCS of a TPP" GKD 34.35.509–97 Ministry of Fuel and Energy of Ukraine, in applicability to the real technological equipment of a real station; Rules for the arrangement of electrical installations (PUE - 2017); DBN A.2.2–3–2014 "Composition, procedure for the development, coordination and approval of design documentation for construction"; DSTU B A.2.4–3–2009 "Rules for the execution of working documentation for the automation of technological processes"; DBN V.2..5-77:2014 "Boiler rooms"; SNiP 3.05.07–85 "Automation systems".

Problems and solutions resulting from project implementation

technological control, automatic regulation, technological protection and blocking, emergency and warning signaling, discrete control of shut-off and regulating valves.

Socio-economic context

Indicator

Value

Number of people who will use the service

10 thous. people

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

District Heating

Stream

Restoration, modernization and development of the centralized and decentralized heat supply system

Strategic document

Регіональна стратегія розвитку

Task

3.2.3. Improving the living conditions of the population

Project objectives

Indicator
Base value
Target value
Gas pressure before the burner device
47000 Pa
47000 Pa
Boiler outlet temperature
150 °C
150 °C
Nominal water flow rate through the boiler per hour
618 m3
616 m3
Temperature at the boiler inlet
70 °C
70 °C

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

None of the options are applicable

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Software explanatory note.pdf
27.03.2026
09:24:24 UTC

Alternative technical solutions

Technical Solution 1

Automated control system based on the use of microprocessor technology

Technical Solution 2

Manually heating the KVGM-50-150M boiler

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)5'716'207 UAH200'000 UAH
For preparation324'039 UAH100'000 UAH
For implementation5'392'168 UAH100'000 UAH
Project operation and closure cost1'511'791 UAH200'000 UAH
For operation1'257'791 UAH100'000 UAH
For closing254'000 UAH100'000 UAH
Average annual costs100'000 UAH0 UAH
Project duration, incl.12 months9 months
Deadline for developing a FFS6 months3 months
Implementation period6 months6 months
Service life120 months120 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget7'227'998 UAH400'000 UAH
Project cost (preparation and implementation)5'716'207 UAH200'000 UAH
For preparation324'039 UAH100'000 UAH
For implementation5'392'168 UAH100'000 UAH
Project operation and closure cost1'511'791 UAH200'000 UAH
For operation1'257'791 UAH100'000 UAH
For closing254'000 UAH100'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
No
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service Unitгрн.
Service Unit Cost1'050 UAH

Profitability of the project

Is the project expected to generate income?YesNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
None of the options are applicable
Does the team have experience implementing similar projects?
No, this is the first project of its kind.

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Partially, we are considering options

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Other riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
27/03/2026SP-L-270326-F3321F86Community SPInvestment Feasibility StudyInclude--
01/04/2026SPP-L-010426-133F1C83Community SPPInvestment Feasibility StudyInclude--