Kramatorska

community since 2020


About the community
Community SPP
Community SP
Community MTP
Project archive
All sectors
All streams
17
Projects
Projects by sectors
17
Projects
Projects by goal
17
Projects
Projects by status
29'793,21 mln
Cost
Estimated project costs by sectors
Project code
Keyword
Budget
Status
Initiation date
Budget
Status
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Emergency repair work (overhaul) using a polymer sleeve to restore a 300 mm diameter sewer collector on D. Mazura Street in Kramatorsk, Donetsk region, damaged as a result of the armed aggression of the Russian Federation

Project Goal
Rebuilding the damaged/destroyed. Introducing innovations and energy-efficient solutions
Geography
Kramatorsk city
Initiator
PUBLIC MANUFACTURING ENTERPRISE "KRAMATORSKY VODOKANAL"
Pipe-in-pipe method, application of polymer coatings
Emergency recovery work using horizontal directional drilling
Renovation of the sewer collector with a polymer sleeve
Project cost18'335'158 UAH
Implementation period5 months
Local level of SPP
Local level of SP
Date03. 2026
SectorMunicipal infrastructure and services
SubsectorDistrict Heating
StatusInvestment Feasibility Study

Overhaul of the boiler control automation KVGM-50-150M at the Lazurny boiler house at 86 Bilenkivska Street in Kramatorsk

Project Goal
Increasing compliance with modern standards. Capacity building, Improving the quality of services
Geography
Donetska region
Initiator
PUBLIC MANUFACTURING ENTERPRISE "KRAMATORSKA TPLOMEREZHA" OF KRAMATORSKA CITY COUNCIL
Automated control system based on the use of microprocessor technology
Manually heating the KVGM-50-150M boiler
Automation systems are based on microprocessor technology, the basis of which is programmable logic controller (PLC). The project provides for the use of PLC LOGICONT-S200 manufactured by OOO «IX-Techno». PLC LOGICONT-S200 has a modular design, the possibility of using local and distributed input-output structures, wide communication capabilities, many functions supported at the operating system level, high convenience of operation and maintenance. This ensures obtaining optimal solutions for building automatic control systems for technological processes.The automation system provides input, output, primary processing of analog and discrete signals according to programmed algorithms. All signals about the parameters and state of the equipment are output to the controller, from where Amendment. Ark. Document No. Signature DateP-234-000 – SoftwareArch.9are transmitted to the active HMI panel (located on the control panel) to allow the operator to visualize data on the equipment status and control it. An automated workplace (AWP) is also connected to the controller to monitor the technological parameters of the furnace. Automatic regulation, blocking protection and signaling are implemented at the controller level and operate independently of the upper levels.
Project cost5'716'207 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of a civil defense structure (radiation shelter) on the territory of the Support Institution of General Secondary Education "Uspikh" of the Kramatorsk City Council, located at: Donetsk region, Kramatorsk, Nezalezhnosti Avenue (Dvirtseva Street), 48A-1

Project Goal
Creation of new facilities and services. Improving the equality of wealth distribution, Meeting demand
Geography
Kramatorsk city
Initiator
EDUCATION DEPARTMENT OF KRAMATORY CITY COUNCIL
Construction of the PRU
Reconstruction of basement premises under the National University of Ukraine
The civil defense structure (CDS) is intended to shelter teaching and technical staff, students from dangerous factors of man-made and natural emergencies and for a special period (secondary factors) - the use of nuclear weapons (light radiation and air shock wave - partially), conventional weapons (small arms, artillery, aircraft bombs, grenades, etc.) - partially). The designed anti-radiation shelter meets the requirements of group P-6. The total number of sheltered people is 520.
Project cost130'000'000 UAH
Implementation period15 months
Local level of SPP
Local level of SP
Date02. 2026
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of a civil defense structure (radiation shelter) on the territory of the Basic Institution of General Secondary Education "Academic" of the Kramatorsk City Council located at: Donetsk region, Kramatorsk city, B. Khmelnytskyi st., 25

Project Goal
Improving the equality of wealth distribution. Creation of new facilities and services, Meeting demand
Geography
Kramatorsk city
Initiator
EDUCATION DEPARTMENT OF KRAMATORY CITY COUNCIL
Construction of the PRU
Reconstruction of basement premises under the National University of Ukraine
The civil defense structure (CDS) is intended to shelter teaching and technical staff, students from dangerous factors of man-made and natural emergencies and for a special period (secondary factors) - the use of nuclear weapons (light radiation and air shock wave - partially), conventional weapons (small arms, artillery, aircraft bombs, grenades, etc.) - partially). The designed anti-radiation shelter meets the requirements of group P-6. The total number of sheltered people is 520.
Project cost130'000'000 UAH
Implementation period15 months
State level of SP
Local level of SPP
Local level of SP
Date12. 2025
SectorEducation and science
SubsectorSchool education
StatusInvestment Feasibility Study

New construction of a civil defense structure (radiation shelter) on the territory of an educational institution in the town of Perecha, Uzhhorod district, Transcarpathian region

Project Goal
Improving the equality of wealth distribution. Creation of new facilities and services, Meeting demand
Geography
Kramatorska community, Kramatorsk city
Initiator
EDUCATION DEPARTMENT OF KRAMATORY CITY COUNCIL
Maturity level
79
Construction of the PRU
Reconstruction of basements for PRU
The civil defense structure (CDS) is intended to shelter teaching and technical staff, students from dangerous factors of emergencies of a technogenic and natural nature and for a special period (secondary factors) - the use of nuclear weapons (light radiation and air shock wave – partially), conventional weapons (small arms, artillery, aircraft bombs, grenades, etc.) – partially). The designed anti-radiation shelter meets the requirements of group P-6. The total number of shelters is 560 people.
Project cost149'500'000 UAH
Implementation period15 months
Local level of SPP
Local level of SP
Date12. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Major repairs of basements for the arrangement of a protective structure for civil defense (the simplest shelter) in the building of the hospital of the Civil Defense Agency "DTMO", in Kramatorsk, 20 Heroes of Ukraine St.

Project Goal
Increasing compliance with modern standards. Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services
Geography
Kramatorska community, Kramatorsk city
Initiator
HEALTH DEPARTMENT OF KRAMATORY CITY COUNCIL
Maturity level
86
Major renovation of basements to create the simplest shelter
Reconstruction of basements for PRU
In conditions of war, when air raids have become a daily reality, the issue of people's safety, especially children, comes first. Kramatorsk Children's Hospital not only provides medical care, but also do everything possible to create safe conditions for their young patients.The object to be overhauled is a group of built-in rooms located in the basement of the building. The implementation of the project will provide the opportunity to use them as the simplest shelter for 160 people from among the staff and patients.
Project cost12'484'380 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date12. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of basement premises for the arrangement of a protective civil defense structure (radiation shelter) in the building of outpatient clinic No. 4 of the KNP "CPMSD No. 1" Kramatorsk, 17 O. Tykhoy St.

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Kramatorska community, Kramatorsk city
Initiator
HEALTH DEPARTMENT OF KRAMATORY CITY COUNCIL
Maturity level
86
Reconstruction of the building's basement for the installation of a power plant
Construction of a PRU on the hospital premises
When choosing a location for radiation shelters, basements and basement rooms should be considered first, as they usually provide the most effective protection against ionizing radiation and are more resistant to the destructive effects of an air shock wave. Radiation shelters provide protection not only from explosions and debris, but also from ionizing radiation. Installing a PRU in a hospital that meets modern standards will increase safety in emergency situations. Therefore, this method was chosen for the implementation of this project.
Project cost19'784'215 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date12. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Creation of a car service to meet the critical needs of the municipal non-profit enterprise "City Hospital No. 2" of the Kramatorsk City Council (purchase of vehicles).

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the condition of infrastructure, Creation of new jobs through project implementation, Improving the quality of services
Geography
Kramatorsk city
Initiator
HEALTH DEPARTMENT OF KRAMATORY CITY COUNCIL
Maturity level
86
Creation of a car service to provide inpatients with meals.
Use of rented vehicles
Having its own transport will allow the hospital to save money on food delivery services, since the inpatient departments are located in different neighborhoods of the city. The creation of a car service to provide inpatients with food allows for timely delivery of food to inpatients of the hospital.
Project cost6'001'000 UAH
Implementation period5 months
Local level of SPP
Local level of SP
Date12. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Reconstruction of internal basement premises for the arrangement of a protective civil defense structure (radiation shelter) in the building of the KNP "CPMSD No. 1" KMR outpatient clinic No. 9-12, Kramatorsk, V.Stusa St., 31

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure
Geography
Kramatorska community, Kramatorsk city
Initiator
HEALTH DEPARTMENT OF KRAMATORY CITY COUNCIL
Maturity level
75
Reconstruction of the basement for the PRU
Major renovation of basements for the simplest shelter
A radiation shelter is a safe space for patients and medical staff in emergency situations. Planning the existing premises for a radiation shelter will allow for increased safety measures and provide protection for 200 people.
Project cost29'400'499'399 UAH
Implementation period12 months
Local level of SPP
Local level of SP
Date11. 2025
SectorHealthcare
SubsectorSpecialized medical care
StatusInvestment Feasibility Study

Major repairs of the storage facility of the KNP "City Hospital No. 2" in Kramatorsk

Project Goal
Increasing compliance with modern standards. Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services
Geography
Kramatorska community, Kramatorsk city
Initiator
HEALTH DEPARTMENT OF KRAMATORY CITY COUNCIL
Maturity level
86
Overhaul of the storage
New construction of a civil defense facility with PRU properties
The storage facility is a modern safe space on the territory of a healthcare facility for patients and staff. A set of measures for the overhaul of the existing building will ensure the further normal operation of the building as a whole
Project cost18'216'578 UAH
Implementation period8 months

In focus

All news