"New construction of an anti-radiation shelter on the territory of the Kryvorizka Lyceum No. 123 of the Kryvorizka City Council at the address: str. Mykolaivske Shosse, 18, Kryvyi Rih, Dnipropetrovsk region."

Priority indicator
134.928
Financial programProjectObjects of investmentApplication approval history

Financial program

State subvention for the provision of safe conditions in institutions of general secondary education

Author
MINISTRY OF EDUCATION AND SCIENCE OF UKRAINE
Total budget of program
2'500'000'000 UAH
Source of funding
Subsidy from the state budget to local budgets for the provision of safe conditions in institutions providing general secondary education
Component of the program
Dnipropetrovsk region
Start of program round
04.05.2024
End of the program round
n/a

Project

"New construction of an anti-radiation shelter on the territory of the Kryvorizka Lyceum No. 123 of the Kryvorizka City Council at the address: str. Mykolaivske Shosse, 18, Kryvyi Rih, Dnipropetrovsk region."

Project Initiator
DEPARTMENT OF EDUCATION AND SCIENCE OF THE EXECUTIVE COMMITTEE OF KRYVORIZ CITY COUNCIL
Project Implementor
"SAPSAN-KR" LIMITED LIABILITY COMPANY
Contributors
Kryvyy Rih. Kryvyy Rih. Kryvyy Rih
Project status
Active
Compliance with the requirements of the financial program
Expand all
  • The cost of the shelter object
    The share of the estimated cost directly related to the shelter, hryvnias
    The cost of the shelter object according to the project estimate
    58519430.98
  • Conclusion of a construction contract
    Whether a contract for the provision of construction services has been concluded with the selected contractor
    The construction contract has been concluded and published in the Prozorro system
    Contract number in Prozorro
    UA-2024-03-22-002258-a-c1
  • Decisions on ensuring the accessibility of the building
    Does the design task establish technical requirements to ensure the accessibility of the shelter object?
    The barrier-free decision has been applied
    Barrier-free level
    high
  • Compliance of the sub-functional classification of the project with the requirements of the financial program
    Projects involving the construction or repair of civil defense shelters can be financed with the funds of the program
    The project envisages the construction, reconstruction or repair of a civil defense shelter
  • Organization of the educational process
    Additional information on the current and planned mode of operation of the educational institution
    Organization of training in two shifts at the moment
    Organization of training in two shifts after construction of the shelter facility
    The educational institution participates in the program of reforming the food system
  • Model of the organization of the work of the shelter facility
    Mode of use of the shelter facility provided by the project
    Shelter for current educational institution only
  • General information about the project
    Name and description of the project that is the subject of the application
    Project name
    "New construction of an anti-radiation shelter on the territory of the Kryvorizka Lyceum No. 123 of the Kryvorizka City Council at the address: str. Mykolaivske Shosse, 18, Kryvyi Rih, Dnipropetrovsk region."
    Brief description of the project

    Description of architectural, construction and structural solutions The project envisages the construction of a new anti-radiation shelter (PRU) on the territory of Kryvyi Rih Lyceum No. 123 of the Kryvyi Rih City Council. According to clause 5.2 DBN V.1.2-14:2018, the constructions of buildings and structures belong to the following categories of responsibility: A" - load-bearing elements (foundations, columns, load-bearing walls, elements of floors, stairs); "B" - load-bearing elements of coatings, roofing, wall self-supporting fences; "B" - self-supporting partitions, windows, doors, floors. Spatial rigidity of buildings and structures are provided by the work of external and internal load-bearing walls, disks of floors and coatings. Volumetric planning solutions Shelter, separately located, sunken type for 300 people (students and staff) sheltered: students of grades 5-12 - 188 people; 3-4 grade students - 80 people; staff - 40 people - type - anti-radiation shelter, shelter group P-1. Degree of fire resistance - II. Height of the main rooms in cleanliness - 2.55 m. Height of entrances - 2.55 m; 2.20 m. The total area of the premises of the PRU - 1025.18 m. The area of the main premises - 648.11 m. The area of auxiliary premises - 327.76 m. The object belongs to the class of consequences (responsibility) CC2. The designed anti-radiation shelter (RA) has a square shape in plan, with dimensions of 30.0 x 30.0 m along the coordination axes. The structure is of an underground type. The composition of the RA includes main and auxiliary premises in accordance with the requirements of DBN V.2.2-5:2023. The main ones include rooms for hiding, a control room, and medical rooms, and the rest of the designed ones listed below are included in the auxiliary ones. The shelter has two separate entrances. The project envisages measures for convenient and safe movement of people with limited physical abilities: arrangement of two evacuation exits to the outside with a lift for MGN. The PRU consists of premises: premises for shelter (grades 5-12); room for hiding children under 11 years of age (3rd-4th grade); the main entrance with a one-chamber vestibule-gateway; emergency exit with vestibule-sluice single-chamber; premises for storing contaminated outerwear; premises for storing waste; universal cabin (for MGN); women's bathroom; personal hygiene cabin; men's bathroom; buffet with equipment for maintaining standard food temperature and drinking regime; premises for food storage; medical center; premises for storing water supply; premises of the control point and fire station; electrical panel and ventilation chamber. Single-chamber vestibule-sluices are provided at the entrance and exit to the PRU. The structural scheme corresponds to volume planning decisions taking into account the category of fire and explosion hazards. The structural scheme of the PRU is a monolithic reinforced concrete frame. The foundation slab, frame elements, external and internal walls, ceilings are made of monolithic reinforced concrete. C25/30, reinforced with fittings according to DSTU 3760:2019. Partitions - from ceramic bricks DSTU B V.2.7-61:2008 on a cement-sand mortar with height reinforcement and monolithic reinforced concrete from concrete cl. C25/30. Internal door blocks - fireproof and aluminum, depending on the purpose of the premises. For the relative mark of 0.000, the level of the clean floor of the main premises of the PRU is accepted. Interior equipment of the premises. Ceiling - interior acrylic matte paint in 2 layers on the prepared surface. matte acrylic paint in 2 layers, on the prepared surface. Floors - epoxy coating for floors in 2 layers, acrylic-urethane paint on the prepared surface (depending on the purpose of the premises). External equipment of the walls of ventilation shafts, facade walls of the entrance, exit - silicone facade paint on a previously prepared surface. Engineering supportHeating. To maintain the specified temperature in the premises of the PRU, the working project provides for the installation of wall-mounted electric heaters with built-in thermostats "Termiya" series "Optima". For rooms with a wet regime, electric convectors splash-proof "Thermiya" are used. Ventilation. The working project envisages the installation of a system of general exchange supply and exhaust ventilation with mechanical drive for the premises of the PRU - systems P1, B1, P2, B2 in the "clean ventilation" mode. Supply systems P1 and P2 are equipped with anti-dust filters (cassette filter G4 F315). Air intake and exhaust for ventilation systems is carried out from the outside, through separate ventilation shafts. In the cold period of the year, outdoor air heating is provided for P1, P2 systems. Plumbing. The connection of the B1 cold domestic drinking water supply system is made from the existing water pipe laid in the basement of the Lyceum. The designed external water supply network is designed as an independent route with a length of 37.2 m in plan made of polyethylene pipe. It is planned to place an emergency supply of drinking water in a capacity of 1,900 liters. Hot water supply is provided autonomously from electric storage water heaters. Sewerage. Drainage of the sewage system is provided through the release of K1 into the designed external sewage networks. Drainage of household sewers from the building of the public utility company is carried out by two networks: the main and emergency K1 and K1.1. The main network is projected by gravity section K1n (length in plan 31.8 m) and gravity section K1 (length in plan 4 m) to the designed well 1 (the point of insertion into the existing network of gravity sewage of the lyceum). The emergency network is carried out by gravity network K1.1 (length in plan 23 m) to the prefabricated designed well. Electrical solutions. The total existing capacity of the lyceum will not increase due to the existing reserve capacity and during the use of the storage, other electrical equipment of the building will not be operated. Electricity accounting - in the existing HRS. The project provides working and emergency lighting. Lamps with LEDs are designed in the premises. Emergency lighting and a wireless call button are provided in room 9 "Universal cabin (for MGN)". Evacuation lamps, "EXIT" light indicators, designed with built-in rechargeable batteries. Control of the lamps above the external entrances to the PRU is carried out with the help of a motion sensor built into the lamps. Distribution electric lighting networks are designed with PVSngd wire, FLAME-X cable. The section of the EM project provides for a grounding circuit that meets the requirements of regulatory documents. This project provides for the arrangement of the premises of the protective structure with wired and wireless access to the ETHERNET network. As a distribution node for access to the Ethernet network, the project provides for the installation of 3 6U telecommunication cabinets with overall dimensions in the premises. To provide wireless access to the Ethernet network, a Wi-Fi access point is installed in room 3. Fire and man-made safety The degree of fire resistance of the shelter building is II. Evacuation exits comply with building regulations. According to the results of calculations, the estimated evacuation time of people from the shelter does not exceed the required evacuation time, which indicates the following: until the dangerous factors of the fire reach critical values and block the evacuation routes, persons who may be in the shelter at the time of the probable fire will make an independent exit. The shelter has two distributed entrance nodes and an emergency exit. The doors of the evacuation exits on the evacuation routes open in the direction of the exit from the shelter, and the dimensions comply with the standards. The doors to the filter-ventilation chamber, electrical panel, are accepted by the fire department. The premises for storing contaminated street clothes are separated from the premises for hidden ones by type I fire partitions, the doors are fireproof. Non-combustible materials or materials with fire hazard indicators no higher than group G2 are used for the interior decoration of the premises of the PRU. Passages through the walls should be made in rigid PVC pipes. Fans for PRU ventilation systems are provided with an electric manual drive. Anti-explosive devices for civil defense storage facilities are installed on the air intakes and exhaust devices of the PRU of the installation. Inflow systems P1 and P2 are equipped with anti-dust filters Air intake and release for ventilation systems is carried out from the outside, through separate ventilation shafts with fire resistance EI120, located outside the football field. The project includes cable and conductor products that do not spread combustion. The premises are provided with primary means of fire extinguishing. Internal fire extinguishing is provided by fire hydrants. External fire extinguishing is designed from existing fire hydrants. As technical means of fire detection in protected premises, used smoke, heat and manual fire detectors are installed in premises and on escape routes and exits from the building. The detectors are grouped into loops and connected to the 24-hour zone to the Tiras control center. The designed system for notifying people about a fire of the CO3 type, which provides for the installation of "EXIT" sound and light alarms, and "Fire" light and sound alarms. The voice warning is made on the control and indication equipment "VELEZN-120-100", the fire warning system is activated automatically from the fire signal, which is generated by the automatic fire alarm system. An alarm notification from the activation of the fire alarm is transmitted to the central monitoring panel using the MCA - GSM via the GSM channel.

  • The amount of co-financing of the subject of the request
    The share of co-financing at the expense of the local budget or other sources determined by the terms of the subvention. Minimum requirements for co-financing:
    Percentage of co-financing
    30
    Guarantee letter on co-financing
  • Derived indicators
    Values of indicators calculated on the basis of previously collected data
    Type of work according to PD - construction
    Project cost per 1 user, hryvnias.
    195064.77
    The level of satisfaction of the need for shelter of all participants in the educational process (taking into account the number of changes)
    58.708
    The estimated cost of the project in terms of the subvention does not exceed UAH 150,000,000.00
    40963601.69
    The estimated cost of the project per person of the planned project capacity does not exceed UAH 250,000.00
    195064.77
  • Conformity of the civil protection shelter class to the requirements of the program
    Projects related to the construction or repair of civil protection shelters of certain classes can be financed at the expense of the program
    The class of shelter provided by the project meets the requirements of the program
  • A guarantee of the intention to complete the implementation of the project by December 31, 2024
    The terms of the program require completion of the construction project by the end of 2024.
    We confirm the intention and possibility to complete the implementation of the project by December 31, 2024
  • The fiscal capacity of the community on whose territory the educational institution is located
    An indicator that characterizes the ability of a territorial community to accumulate tax revenues for budgets, subject to the exclusion of the amount of funds necessary to meet the community's own needs
    Taxability index of the community
    1.13
  • Entry of the educational institution into the network of the Ministry of Education and Culture
    At the expense of the program, projects related to educational institutions included in the network of the Ministry of Education and Culture of Ukraine can be financed
    The educational institution is part of the network of the Ministry of Education and Culture
  • Availability of developed project documentation
    Projects for which project documentation has been developed can be financed from the funds of the program
    The design task has been created
    The project documentation is registered in the EDESSB
    Registration number in EDESSB
    PD01:0419-7829-9377-4279
  • Availability of permission to start construction
    Has permission to start work been obtained in accordance with the Procedure for granting permission for construction work?
    Permission to start construction has not been received
  • Application in the development of PD of reuse projects
    Is one of the reuse projects registered in the relevant register in the EDESSB system useful for the development of project documentation?
    PD is not based on a reuse project
  • Availability of an expert report on project documentation
    Was the examination carried out in accordance with the Procedure for the development, examination and application of reuse projects in construction?
    PD examination passed
    Registration number in EDESSB
    EX01:1555-2653-0393-8982
  • Project documentation approval status
    Has the project documentation been approved by the customer in accordance with the Procedure for developing project documentation for the construction of facilities?
    Project documentation has been approved
    Registration number of the document of approval in EDESSB
    ZA01:4175-6502-9361-3882
  • Meet the minimum number of students
    The program can finance projects related to educational institutions with more than 200 students
    The number of students actually studying at the secondary school exceeds 200 people
  • Correspondence of the degree of damage to the educational institution to the requirements of the financial program
    At the expense of the funds of the program, projects related to educational institutions where there are no damages or are assigned to the 1st category according to order No. 144 of 06.08.2022 can be financed
    There are no damages
  • Compliance with program priorities
    The total number of points, calculated on the basis of data from the project card, as well as additional information obtained from external sources and collected during the preparation of this application
    Cumulative indicator of priority
    134.928
  • Status of the educational institution
    The status of the institution in accordance with the Regulation on the support institution of education, approved by the Resolution of the CMU of June 19, 2019 No. 532
    The establishment is not a reference
  • Compliance of the location of the educational institution with the requirements of the program component
    This component of the program involves consideration of applications for educational institutions located in the Dnipropetrovsk region
    The educational institution is located in the Dnipropetrovsk region
  • Compliance with the minimum co-financing percentage requirement
    According to the terms of the program, a minimum percentage of co-financing is established, which is required depending on the type of founder of the educational institution (region, city, village or settlement council) and the tax capacity index of the relevant territory (region, community).
    City Council
    Index of tax capacity of the city-type OTG
    1.13
    Deviation from the minimum percentage of co-financing determined by the terms of the program for the type of local budget
    0
  • Compliance of the sectoral classification of the project with the requirements of the financial program
    Projects in the secondary education sector can be financed with the funds of the program
    The project belongs to the "Education" sector
  • Exclusivity of the shelter object as a subject of the project
    The program can finance projects that only involve repair, reconstruction or construction of a shelter and are not comprehensive
    The number of investment objects in the project is 1
  • Classification of civil protection shelter
    In accordance with the definitions of the Code of Civil Protection of Ukraine dated 02.10.2012 No. 5403-VI (CPC)
    Civil protection shelter class
    Anti Radiation Shelter
  • Characteristics of the shelter object
    Values of the main physical and/or technical indicators of the shelter object, necessary for further prioritization
    Shelter capacity, number of people
    300
    Shelter area, sq.m
    1025
    Availability of video surveillance in the shelter
  • Information about the educational institution
    Data about the institution according to the data of the automated information complex of educational management (AICOM)
    Institution code in AIKOM
    school-2946
    Name of the institution
    Kryvyi Rih Lyceum No. 123 of the Kryvyi Rih City Council
    EDRPOU code of the institution
    33453355
    The number of students receiving education at the institution
    474
    The number of teachers in the institution
    37
    Location area
    UA12000000000090473
    OTG location
    UA12060170010720279
    Population location
    UA12060170000091033
    Location address
  • Selection of a construction contractor
    Has the contractor of construction services been determined through the procurement procedure?
    The contractor selection procedure was carried out using the Prozorro system
    Procedure number in Prozorro
    UA-2024-03-22-002258-a
  • Classification of the territory of the establishment according to the level of risk of danger
    Automatic determination of the zone according to the level of risk of danger for the community, on the territory of which the educational institution is located
    High level. Participation in the competition is allowed
  • The number of students who will have access to full-time education (taking into account changes)
    Indicator calculated depending on the balance of the number of places in the shelter and the actual number of persons potentially staying in the educational institution at the same time.The balance is defined as: (number of places in the shelter * number of changes) - number of teachers - number of students taking into account all ZOs that will use the shelter. In the case that the value of the balance is equal to zero or more than zero - the number of pupils who get access to the shelter is equal to the actual number of pupils of the ZO (taking into account all the ZO who will use the shelter). : (the number of places in the shelter - the number of ZO personnel taking into account all ZOs that will use the shelter) * number of shifts
    The number of students who will have access to full-time education (taking into account changes)
    474
  • Planning arrangements in the shelter building
    Does the project documentation for the shelter include a description of the arrangement
    The presence of the item "Arrangement" in the project documentation
  • The influence of the presence of an equipped shelter object on increasing the possibility of face-to-face study
    Will the implementation of the project affect the opportunities for full-time or mixed education?
    The availability of shelter affects the possibilities of face-to-face education
    Confirmation letter from OVA

Objects of investment

TypeWorks
Class45210000-2
PlaceKryvorizka community

Anti-radiation shelter

Information is absent

Application ID

DREAM-UA-240424-4EDD5DA1

Application status

Withdrawn

Application date

25.04.2024

Application amount

40'963'601,69 UAH

Applicant

DNIPROPETROVSK REGIONAL STATE ADMINISTRATION

Approver

KRYVORIZ CITY COUNCIL

Sector