Financial program
State Fund for Regional Development
Project
Overhaul of the cardiological building of the communal enterprise Rivne Regional Clinical Hospital named after Yuri Semenyuk of the Rivne Regional Council at the address: Rivne Region, Rivne, str. Kyivska, 78-g (energy saving measures)
Compliance with the requirements of the financial program
Expand all- State or municipal ownership of the property objectThe facility for which the subvention is being financed is in state or municipal ownership.YesExtract from the State Register of Property Rights (SRPR)The facilities remain in state or municipal ownership and are used for their intended purpose for at least 20 years from the date of completion of the project.
- Availability of co-financingCo-financing from local budgetsPercentage of co-financing18Letter of guarantee or document confirming the amount of co-financing
- Implementation of energy-efficient measures, compliance with requirements for the inclusion of people with disabilities and other low-mobility groups during construction workIt is taken into account
- AbilityThe ability of central executive authorities and local self-government bodies, for the financing of which budget funds are attracted, to ensure their further maintenance at the expense of local budgets and other sources not prohibited by lawYes
- Compliance with the SDRRCompliance of the public investment project with the goals and objectives defined by the State Strategy for Regional Development, relevant regional development strategies, and development strategies of territorial communitiesStrategic level of the projectstateRegionalDevelopmentStrategy
- Compliance of the sector specified in Appendix 1 to the Procedure for developing and monitoring the implementation of the medium-term plan of priority public investments of the state, approved by the Resolution of the Cabinet of Ministers of Ukraine dated February 28, 2025 No. 294Select the sector (industry) for public investment, defined in Appendix 1 to the Procedure for developing and monitoring the implementation of the medium-term plan of priority public investments of the state, approved by the Resolution of the Cabinet of Ministers of Ukraine dated February 28, 2025 No. 294Healthcare
- Project readiness indicator for implementationConstruction work has begun.
- Strategic levelStatus of approval of regional development strategies, development strategies of territorial communitiesRegional development strategy, development strategy of territorial communities approved
- Project scheduleTotal estimated project durationBy the end of 2025
- The project is part of a public investment project included in the Unified Project Portfolio for Public Investments 2025Yes190824-ABCBD9AE
- Compliance with program prioritiesThe total number of points, calculated on the basis of data from the project card, as well as additional information obtained from external sources and collected during the preparation of this applicationCumulative indicator of priority15
- General information about the projectName and description of the project that is the subject of the applicationProject nameOverhaul of the cardiological building of the communal enterprise Rivne Regional Clinical Hospital named after Yuri Semenyuk of the Rivne Regional Council at the address: Rivne Region, Rivne, str. Kyivska, 78-g (energy saving measures)Brief description of the project
The cardiology building is blocked by ground crossings with other hospital buildings. The building subject to
overhaul – 5-storey with a technical floor and an attic, with dimensions in axes 112.17x29.87m. Internal
walls – made of ceramic bricks on a cement-sand mortar 380 mm thick. External walls – made of ceramic bricks on
cement-sand mortar, wall thickness 510mm and finished with ceramic tiles. Interfloor ceiling – with
prefabricated reinforced concrete hollow core slabs, the ceiling of the unheated technical floor is made of reinforced concrete
hollow core floor slabs, above the technical floor of the floor – from prefabricated reinforced concrete floor slabs and
finished with 3-layer roofing felt, which is arranged on a cement-sand screed. The roof is made of wavy
asbestos cement sheets on wooden rafters. The height of the attic is 4.9 m. There is an unheated basement under the building.
basement. Ceiling above the unheated basement - made of hollow core slabs. Floor of the first floor
ceramic tiles on a cement-sand screed with backfill insulation. The height of the basement is 2.5 m.The overhaul project provides for the following set of works: thermal insulation of the external walls of the building;
insulation of the basement above and below ground level; replacement of wooden and plastic single-chamber window blocks, entrance
wooden and plastic single-chamber doors; replacement of window sills; replacement of ebbs; execution of vertical
waterproofing of foundations; restoration of the blind area; installation of a metal structure covering the entrance to the building;
insulation of the technical floor; replacement of the supporting blood system; replacement of the roof; system installation
drainage; replacement of the exit door to the technical floor with a fire-resistant one; replacement of the exit door to the attic with
fire protection; removal of ventilation shafts and channels above the roof level; installation of wall reinforcement in axes A-G;
installation of two metal platforms for air conditioning units; installation of a metal frame for ventilation units
installation of operating rooms; exit of facade ventilation pipes through the roof; installation of metal pipes on the facade
wall frames for cladding existing ventilation ducts; installation of partitions from AEROC classik blocks –
t120/250 BRAND D500; arrangement of basement wall decoration (decoration according to functional purpose
premises); installation of metal-plastic doors, fire doors, reinforcement of hermetic doors for shelter,
installation of doors for medical premises (according to the functional purpose of the premises); arrangement
reinforced concrete ramp and stairs to the entrance to the basement with a roof; installation of a metal visor;
increasing the height of the doorway to the basement; installing an additional entrance for the MGN; lowering the level
of the existing basement floor to the design levels; installation of concrete floors in the basement of the building
(decoration according to the functional purpose of the room).The project provides for the use of materials and equipment certified in Ukraine in accordance with the established procedure.
Design solutions were implemented taking into account the requirements of DBN V.2.2-40:2018 "Inclusivity of buildings and structures". For
The working project provides for the following measures to meet the needs of low-mobility population groups: on the main
A ramp has been installed at the entrance to the cardiology building for unhindered access to the building; installation of a ramp and
covered stairs for entering the basement; stairs and ramps are protected from precipitation; stairs and
ramps are equipped with handrails; ramps and stairs are covered with materials that prevent slipping when wet;
information system in premises, entrances and on traffic routes, including technical means of notification,
visual images, clear colored signs, tactile surfaces and signs.
Objects of investment
Overhaul of the cardiological building of the communal enterprise Rivne Regional Clinical Hospital named after Yuri Semenyuk of the Rivne Regional Council at the address: Rivne Region, Rivne, str. Kyivska, 78-g (energy saving measures)
Compliance with the requirements of the financial program
Expand all- Location geographyLocation of the facility on the territory of Ukraine, except for the territories of active hostilities, territories of active hostilities where state electronic information resources operate, or territories of Ukraine temporarily occupied by the Russian Federation, included in the list of territories where hostilities are (were) conducted or temporarily occupied by the Russian Federation, approved by the order of the Ministry of Development of Ukraine dated February 28, 2025 No. 376, for which, as of the date of submission of proposals for public investment projects, the implementation of which will be carried out with budget funds (hereinafter referred to as proposals), the date of completion of hostilities or temporary occupation has not been determinedRegionUA56000000000066151CommunityUA56060470000086729Community safety
- Object damage category indicatorNot registered in the RPZM
- Priority indicators of the request subjectProject readiness indicator0Object damage category indicator0Community Capacity Building Indicator Founder's Budget0
- Project readiness indicatorProject documentation has been developedProject documentation developed no earlier than November 15, 2023.Project documentation approvedExpertise of project documentation was carried out
- Community Capacity Building Indicator Founder's BudgetTaxability index of the community1.4