State Single Project Pipeline

Within the Public Investment Management (PIM) reform being implemented by the Government of Ukraine, a unified approach to managing public investments is being introduced at the national, regional, and local levels. In particular, a legislative framework regulating PIM matters has been approved.

The procedure for forming the Single Project Pipeline (SPP) of public investments at the state, regional, and community levels is regulated by Cabinet of Ministers Resolution No. 527 of February 28, 2025. According to the procedure, the SPP contains a list of priority projects and programs from sectoral pipelines that have undergone expert appraisal and have been approved by the Strategic or Local Investment Council as eligible for the corresponding budget financing.

The formation of the SPP at state, regional and community levels through the DREAM ecosystem ensuring transparency and enabling review, analysis, and monitoring by sectoral ministries, international partners, IFIs, and the public. This enhances opportunities for attracting funding.

Information regarding projects and programs is displayed on the State Single Project Pipeline, in accordance with the decisions of the Strategic Investment Council, which are official and subject to mandatory use. At the same time, the public API of the system may temporarily display information that differs in certain particulars from the information published on the portal; such discrepancies are of a purely technical nature and shall be remedied in the prescribed manner.

Reform
CMU Resolution No. 527

All sectors
All streams
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 0)

Project code: 140825-8645CE0E
Initiation date
Budget
Status
State level of SPP
State level of SP
Date08. 2025
SectorEnergy Sector
SubsectorElectric power industry
StatusPreliminary Investment Feasibility Study

New construction of a cogeneration complex based on gas piston units with a total capacity of up to 80 MW in Mykolaiv

Project goal
Capacity building. Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Improving the quality of services
Geography
Mykolaiv city
Initiator
PRIVATE JOINT-STOCK COMPANY "MYKOLAIV HEATING POWER PLANT"
Construction of a cogeneration complex based on gas piston plants with a total capacity of up to 80 MW
Construction of a combined cycle plant + waste heat boiler in a configuration of 31 MW thermal / 50 MW electric
Construction of a biomass steam boiler + backpressure turbine – 20 MW thermal / 5.7 MW electric
The project envisages the construction of new generating facilities located on the territory of the Mykolaiv CHPP. At the moment, a feasibility study of modernization options for PrJSC "MYKOLAIV CHPP" is being carried out with the help of donor assistance (Swedfund). One of the priority options is the installation of gas-piston units with a total capacity of up to 80 MW of electricity, operating in cogeneration mode. This will allow operation in the mode of multiple equipment starts without reducing the reliability of the equipment, choosing the most advantageous price position in the electricity market in terms of the day. The cogeneration component will compensate for part of the thermal capacity of the station with more advantageous specific costs for heat generation, reducing the cost of heat production by reducing heat generation on morally and physically obsolete equipment. In addition, electricity generation can be carried out year-round
Budget59'706'400'000 UAH
Implementation period36 months