State Single Project Pipeline

Within the Public Investment Management (PIM) reform being implemented by the Government of Ukraine, a unified approach to managing public investments is being introduced at the national, regional, and local levels. In particular, a legislative framework regulating PIM matters has been approved.

The procedure for forming the Single Project Pipeline (SPP) of public investments at the state, regional, and community levels is regulated by Cabinet of Ministers Resolution No. 527 of February 28, 2025. According to the procedure, the SPP contains a list of priority projects and programs from sectoral pipelines that have undergone expert appraisal and have been approved by the Strategic or Local Investment Council as eligible for the corresponding budget financing.

The formation of the SPP at state, regional and community levels through the DREAM ecosystem ensuring transparency and enabling review, analysis, and monitoring by sectoral ministries, international partners, IFIs, and the public. This enhances opportunities for attracting funding.

Information regarding projects and programs is displayed on the State Single Project Pipeline, in accordance with the decisions of the Strategic Investment Council, which are official and subject to mandatory use. At the same time, the public API of the system may temporarily display information that differs in certain particulars from the information published on the portal; such discrepancies are of a purely technical nature and shall be remedied in the prescribed manner.

Reform
CMU Resolution No. 527

All sectors
All streams
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 0)

Project code: 070825-18E7D715
Initiation date
Budget
Status
State level of SPP
State level of SP
Date08. 2025
SectorMunicipal infrastructure and services
SubsectorWater supply and sanitation
StatusInvestment Feasibility Study

Municipal water management project of Chernivtsi city

Project Goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Chernivetska region
Initiator
MINISTRY OF DEVELOPMENT OF COMMUNITIES AND TERRITORIES OF UKRAINE
Maturity level
0
Municipal water management project of Chernivtsi city
New construction of treatment plants and sewerage networks
Current project consisting of three components: Chernivtsi Municipal Water Management Project, Stage 1: the project provides for financing construction works, supplies and installation of equipment, pre-operational and commissioning works (if any): - reconstruction and modernization of the surface water intake "Mytkiv"; - reconstruction and modernization of the water treatment plant "Vikno"; - replacement of pipeline sections of the main water supply from "Shubranets" to the Prut River; - replacement of pipeline sections of the main pipeline after the Prut River "Stara" pipe, landslide zone; - reconstruction and modernization of the underground water intake "Magala"; - reconstruction and improvement of the underground water intake "Bila"; - reconstruction of "Rogizna" + improvement of the underground water intake "Lenkivtsi 1"; - reconstruction of pumping stations; - reconstruction of "Chapaev" tanks; - pressure zoning; - replacement of pipes in the distribution network pipelines and in landslide areas; - purchase of leak detection equipment; - purchase of pipe repair equipment; - purchase and installation of house meters; - purchase and installation of data transmitters and a communication system for the SCADA system, modernization of the SCADA system; - reconstruction of the "Quartz" water intake and relevant water treatment facilities *); - conversion of chlorination systems to hypochlorite; - purchase and installation of modern equipment for a biochemical laboratory. Chernivtsi Municipal Water Management Project, Stage 2:The component provides for investment measures financed by the Loan: Investment 1: Restoration of approximately 7 km of emergency main water supply from the water pumping station of the 3rd lift "Shubranets" to the clean water tanks "Popova"; Investment 2: Restoration of emergency sections of the water supply network together with the most worn-out networks of the drainage system, which are located on some streets (27.7 km of water supply networks and approximately 22.5 km of drainage networks); Investment 3: Installation of pressure regulation equipment in the water supply network of the city of Chernivtsi. b. Advisory Services: Assistance to the OPU and the Chernivtsi City Council in planning and implementing the measures specified in paragraph 2.1.2 (provided by the Implementation Consultant), c. Accompanying activities (Expert Services) in the interests of the OPU will be financed from the Grant (provided by the Accompanying Activities Consultant). Strengthening local self-government in Ukraine (Chernivtsi): the component is designed to ensure high-quality wastewater treatment, prevent pollution of the transboundary Prut River with raw sediment, ensure environmental safety and improve the quality of life of over 50 thousand people near the OSC, and the reliability and quality of centralized water supply services for over 250 thousand residents of Chernivtsi.
Project cost3'187'800'001 UAH
Implementation period25 months