State Single Project Pipeline

Within the Public Investment Management (PIM) reform being implemented by the Government of Ukraine, a unified approach to managing public investments is being introduced at the national, regional, and local levels. In particular, a legislative framework regulating PIM matters has been approved.

The procedure for forming the Single Project Pipeline (SPP) of public investments at the state, regional, and community levels is regulated by Cabinet of Ministers Resolution No. 527 of February 28, 2025. According to the procedure, the SPP contains a list of priority projects and programs from sectoral pipelines that have undergone expert appraisal and have been approved by the Strategic or Local Investment Council as eligible for the corresponding budget financing.

The formation of the SPP at state, regional and community levels through the DREAM ecosystem ensuring transparency and enabling review, analysis, and monitoring by sectoral ministries, international partners, IFIs, and the public. This enhances opportunities for attracting funding.

Information regarding projects and programs is displayed on the State Single Project Pipeline, in accordance with the decisions of the Strategic Investment Council, which are official and subject to mandatory use. At the same time, the public API of the system may temporarily display information that differs in certain particulars from the information published on the portal; such discrepancies are of a purely technical nature and shall be remedied in the prescribed manner.

Reform
CMU Resolution No. 527

All sectors
All streams
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 0)

Project code: 070326-D581E625
Initiation date
Budget
Status
State level of SPP
State level of SP
Date03. 2026
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a gas-fired power plant up to 20 MW in Lviv region: Project FIV

Project goal
Capacity building. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Creation of new facilities and services, Developing new territories or functions, Rebuilding the damaged/destroyed, Improving the equality of wealth distribution, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Поява нових виробничих потужностей, Reducing territorial or social gaps, Meeting demand
Geography
Lvivska region
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Maturity level
80
Installation of a gas-fired power plant with a capacity of up to 20 MW
Construction of a 41.5 MW solar power plant
The alternative technical solution involves the construction and commissioning of a gas-piston power plant with a total installed capacity of up to 20 MW, which will operate on natural gas. The power plant is designed to produce electricity with the possibility of its sale on the Ukrainian electricity market, in particular on the day-ahead market (DAW), as well as to provide auxiliary services for balancing the Unified Energy System of Ukraine. Gas-piston plants are characterized by high maneuverability, quick start-up and the ability to operate effectively in variable load modes, which allows them to be used to cover peak loads and compensate for unstable generation from renewable energy sources. The project involves the supply and installation of gas-piston modules, auxiliary technological systems, power supply, automation, gas supply systems, as well as the performance of construction, installation and commissioning works.
Budget1'525'133'169 UAH
Implementation period24 months