State Single Project Pipeline

Within the Public Investment Management (PIM) reform being implemented by the Government of Ukraine, a unified approach to managing public investments is being introduced at the national, regional, and local levels. In particular, a legislative framework regulating PIM matters has been approved.

The procedure for forming the Single Project Pipeline (SPP) of public investments at the state, regional, and community levels is regulated by Cabinet of Ministers Resolution No. 527 of February 28, 2025. According to the procedure, the SPP contains a list of priority projects and programs from sectoral pipelines that have undergone expert appraisal and have been approved by the Strategic or Local Investment Council as eligible for the corresponding budget financing.

The formation of the SPP at state, regional and community levels through the DREAM ecosystem ensuring transparency and enabling review, analysis, and monitoring by sectoral ministries, international partners, IFIs, and the public. This enhances opportunities for attracting funding.

Information regarding projects and programs is displayed on the State Single Project Pipeline, in accordance with the decisions of the Strategic Investment Council, which are official and subject to mandatory use. At the same time, the public API of the system may temporarily display information that differs in certain particulars from the information published on the portal; such discrepancies are of a purely technical nature and shall be remedied in the prescribed manner.

Reform
CMU Resolution No. 527

All sectors
All streams
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 0)

Project code: 060326-F3757C29
Initiation date
Budget
Status
State level of SPP
State level of SP
Date03. 2026
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a gas-fired power plant up to 10 MW in Ivano-Frankivsk region: Project FII

Project goal
Capacity building. Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Creation of new facilities and services, Rebuilding the damaged/destroyed, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Поява нових виробничих потужностей, Meeting demand
Geography
Ivano-Frankivska region
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Maturity level
85
Installation of a gas-fired power plant with a capacity of up to 10 MW
Construction and commissioning of a solar power plant (SPP) with a capacity of 21 MW
The alternative solution involves the construction and commissioning of a gas-fired power plant with a total installed capacity of up to 10 MW, operating on natural gas and intended for the production of electricity with the possibility of participating in the day-ahead market and the market of ancillary services of NPP "Ukrenergo". Gas-fired power plants provide high maneuverability, quick starts and stops, as well as stable operation under variable load conditions, which makes them suitable for covering peak loads and balancing the Unified Energy System of Ukraine.
Budget761'758'495 UAH
Implementation period24 months