State Single Project Pipeline

Within the Public Investment Management (PIM) reform being implemented by the Government of Ukraine, a unified approach to managing public investments is being introduced at the national, regional, and local levels. In particular, a legislative framework regulating PIM matters has been approved.

The procedure for forming the Single Project Pipeline (SPP) of public investments at the state, regional, and community levels is regulated by Cabinet of Ministers Resolution No. 527 of February 28, 2025. According to the procedure, the SPP contains a list of priority projects and programs from sectoral pipelines that have undergone expert appraisal and have been approved by the Strategic or Local Investment Council as eligible for the corresponding budget financing.

The formation of the SPP at state, regional and community levels through the DREAM ecosystem ensuring transparency and enabling review, analysis, and monitoring by sectoral ministries, international partners, IFIs, and the public. This enhances opportunities for attracting funding.

Information regarding projects and programs is displayed on the State Single Project Pipeline, in accordance with the decisions of the Strategic Investment Council, which are official and subject to mandatory use. At the same time, the public API of the system may temporarily display information that differs in certain particulars from the information published on the portal; such discrepancies are of a purely technical nature and shall be remedied in the prescribed manner.

Reform
CMU Resolution No. 527

All sectors
All streams
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches

Current set filters (Filtered result: 0)

Project code: 050326-D51EE8D3
Initiation date
Budget
Status
State level of SPP
State level of SP
Date03. 2026
SectorEnergy Sector
SubsectorElectric power industry
StatusInvestment Feasibility Study

Installation of a gas-fired power plant up to 10 MW in Ivano-Frankivsk region: FI Project

Project goal
Capacity building. Contribution to climate or environmental goals, Increasing compliance with modern standards, Creation of new facilities and services, Rebuilding the damaged/destroyed, Improving the equality of wealth distribution, Increasing the even distribution of resources, Improving the condition of infrastructure, Поява нових виробничих потужностей, Reducing territorial or social gaps, Meeting demand
Geography
Ivano-Frankivska region
Initiator
JOINT STOCK COMPANY "UKRNAFTA"
Maturity level
84
Construction of a modern gas-fired power plant with an installed capacity of up to 10 MW
Construction and commissioning of a solar power plant (SPP) with a capacity of 21 MW
Construction of a modern gas-fired power plant with an installed capacity of up to 10 MW based on the production capacities of a utility company in the Poltava region. The plant will operate on natural gas and annually produce ≈55.2 GW·h of electricity for sale on the RDN, and will provide auxiliary services to NPP «Ukrenergo». GPM technology ensures fast starts/stops, operation in flexible modes, and effective balancing of renewable energy sources.
Budget895'416'885 UAH
Implementation period18 months